ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Demolition/rebuild Date: September 27, 2013Permit type: Demolition or move p | Permit status: Issued | Current use: Single family dwelling | Permit id: 645165 | |||||
Electrical permit Date: January 14, 2014Permit status: Finaled | Completion date: August 23, 2014 | Current use: Single family dwelling | Permit id: 660417 | |||||
New residential construction - heating/cooling equipment and ductwork Date: January 7, 2014Permit type: Mechanical permit | Permit status: Finaled | Completion date: August 23, 2014 | Current use: Single family dwelling | Permit id: 659296 | |||||
Mechanical permit Date: September 14, 2004Permit status: Issued | Current use: Single family dwelling | Permit id: 358088 | |||||
Demolition/rebuild Date: September 30, 2013 Value: $300,000Permit type: Building residential permit | Permit status: Finaled | Current use: Single family dwelling | Permit id: 645169 | |||||
Install riser and cable to provide 400amp underground service ,install cable and associated equipment in accordance with pepco plan no. 3429609. Work shall comply with montgomery county specifications for utility construction permit and in accordance with the public right-of-way accessibility guidelines (prowag). A mill and overlay shall be required should the patch not meet the specifications as set forth by the current county specifications for utility construction permit . All lane closures/traffic controls shall comply with the mcdot approved traffic control plans. Must check mcdot paving project schedule and have preconstruction meeting with dps row inspector prior to beginning of construction work. Date: November 18, 2013Permit type: Public right of way | Permit status: Issued | Current use: Public utility | Permit id: 303408 | |||||
Dw permit (residential) construct mc-301. 05 type driveway in accordance with montgomery county standards and specifications. Work shall be complete as directed by the dps row inspector and in accordance with the public right-of-way accessibility guidelines (prowag). Complete repair (restoration of right of way) shall be made of any and all damages done to the existing improvements in the public right of way caused by construction operations on this site. All lane and sidewalk closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. Md dnr permit and mc dot highway serivces tree
|