ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Demolition/rebuild Date: November 3, 2015Permit type: Demolition or move p | Permit status: Finaled | Completion date: November 12, 2015 | Current use: Single family dwelling | Permit id: 729835 | |||||
Please do not request inspections under this permit until 2 business days after permit issuance. Date: September 23, 2015Permit type: Electrical permit | Permit status: Finaled | Completion date: October 27, 2015 | Current use: Single family dwelling | Permit id: 729659 | |||||
Demolition/rebuild Date: November 3, 2015 Value: $350,000Permit type: Building residential | Permit status: Issued | Current use: Single family dwelling | Permit id: 725716 | |||||
Permit revised 03/02/2016: 4 amp heavy-up added per electrical master Date: January 8, 2016Permit type: Electrical permit | Permit status: Issued | Current use: Single family dwelling | Permit id: 741265 | |||||
Mechanical permit Date: December 18, 2015Permit status: Issued | Current use: Single family dwelling | Permit id: 739786 | |||||
Roadside tree protection plan: 18" cherry and resulting stump to be removed from the row due to construction impacts. 1. 5" caliper yoshino cherry to be planted back in the row upon completion of construction. Dw permit (residential): remove existing driveway and construct mc-301. 05 type driveway in accordance with montgomery county standards and specifications. Work shall be complete as directed by the dps row inspector and in accordance with the public right-of-way accessibility guidelines (prowag). Complete repair (restoration of right of way) shall be made of any and all damages done to the existing improvements in the public right of way caused by construction operations on this site. All lane and sidewalk closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. (maryland dnr permit is required prior to remove/impact street trees. Complete tree protection and replanti Date: October 9, 2015Permit type: Public right of way | Permit status: Completed | Current use: Driveway | Permit id: 343014 | |||||
Replacegas service in accordance with washington gas plan no. 638878. Work shall comply with montgomery county specifications for utility construction permit, the direction of the dps inspector and in accordance with the public right-of-way accessibility guidelines (prowag). A mill and overlay shall be required should the patch not meet the specifications as set forth by the current county specifications for utility construction permit and as directed by the dps row inspector. All lane closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. Permittee must check and coordinate with mcdot paving project schedule and have preconstruction meeting with dps row inspector prior to beginning of construction work. Date: October 3, 2016Permit type: Public right of way | Permit status: Issued | Current use: Public utility | Permit id: 354410 | |||||
Install cable and associated equipment to provide 4 amp residential house servicein accordance with pepco plan no. 3507464. Work shall comply with montgomery county specifications for utility construction permit, the direction of the dps inspector and in accordance with the public right-of-way accessibility guidelines (prowag). A mill and overlay shall be required should the patch not meet the specifications as set forth by the current county specifications for utility construction permit and as directed by the dps row inspector. All lane closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. Must check mcdot paving project schedule and have preconstruction meeting with dps row inspector prior to beginning of construction work. Date: April 22, 2016Permit type: Public right of way | Permit status: Issued | Current use: Public utility | Permit id: 352246 | |||||
Install gas service in accordance with washington gas plan no. 645203. Work shall comply with montgomery county specifications for utility construction permit, the direction of the dps inspector and in accordance with the public right-of-way accessibility guidelines (prowag). A mill and overlay shall be required should the patch not meet the specifications as set forth by the current county specifications for utility construction permit and as directed by the dps row inspector. All lane closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. Permittee must check and coordinate with mcdot paving project schedule and have preconstruction meeting with dps row inspector prior to beginning of construction work. Date: February 12, 2016Permit type: Public right of way | Permit status: Issued | Current use: Public utility | Permit id: 351143 | |||||
Remove a tree from the right of way Date: May 1, 2015Permit type: Public right of way | Permit status: Finaled | Current use: Tree | Permit id: 335429 |