Demo/rebuild Date: September 25, 2014Permit type: Demolition or move p | Permit status: Finaled | Completion date: October 21, 2015 | Current use: Single family dwelling | Permit id: 678534 | |||||
Electrical permit Date: February 3, 2015Permit status: Finaled | Completion date: September 16, 2015 | Current use: Single family dwelling | Permit id: 702369 | |||||
1 amp generator Date: August 25, 2015Permit type: Electrical permit | Permit status: Issued | Current use: Single family dwelling | Permit id: 725775 | |||||
Customer wants to use eplans interior work only,installation of (115) roof mounted solar panels... Date: November 19, 2015 Value: $61,295Permit type: Building residential | Permit status: Open | Current use: Single family dwelling | Permit id: 736845 | |||||
Rebuild Date: September 25, 2014 Value: $1,200,000Permit type: Building residential permit | Permit status: Finaled | Current use: Single family dwelling | Permit id: 678538 | |||||
Customer wants to use eplans interior work only,installation of (115) roof mounted solar panels... Date: January 28, 2016 Value: $61,295Permit type: Building residential permit | Permit status: Issued | Current use: Single family dwelling | Permit id: 736845 | |||||
Please do not request inspections under this permit until 2 business days after permit issuance. Date: January 28, 2016Permit type: Electrical permit | Permit status: Issued | Current use: Single family dwelling | Permit id: 742521 | |||||
Mechanical permit Date: July 25, 2008Permit status: Issued | Current use: Single family dwelling | Permit id: 491596 | |||||
Install riser and cable to provide 4 amp underground service to a new single family home in accordance with pepco plan no. 3461827. Work shall comply with montgomery county specifications for utility construction permit, the direction of the dps inspector and in accordance with the public right-of-way accessibility guidelines (prowag). A mill and overlay shall be required should the patch not meet the specifications as set forth by the current county specifications for utility construction permit and as directed by the dps row inspector. All lane closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. Must check mcdot paving project schedule and have preconstruction meeting with dps row inspector prior to beginning of construction work. Date: April 14, 2015Permit type: Public right of way | Permit status: Issued | Current use: Public utility | Permit id: 332196 | |||||
Install gas service in accordance with washington gas plan no. 400155. Work shall comply with montgomery county specifications for utility construction permit, the direction of the dps inspector and in accordance with the public right-of-way accessibility guidelines (prowag). A mill and overlay shall be required should the patch not meet the specifications as set forth by the current county specifications for utility construction permit and as directed by the dps row inspector. All lane closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. Permittee must check and coordinate with mcdot paving project schedule and have preconstruction meeting with dps row inspector prior to beginning of construction work. Date: December 6, 2014Permit type: Public right of way | Permit status: Issued | Current use: Public utility | Permit id: 323643 | |||||
Installing 4" sewer house connection in accordance with wssc plans and specifications. Work shall comply with montgomery county specifications for utility construction permit the direction of the dps inspector and in accordance with the public right-of-way accessibility guidelines (prowag). A mill and overlay shall be required should the patch not meet the specifications as set forth by the current county specifications for utility construction permit and as directed by the dps row inspector. All lane closures and traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. Must check mcdot paving project schedule and have preconstruction meeting with dps row inspector prior to beginning of construction work. Note:permit required to get approval of wssc and cordinate with wssc.
|