ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Electrical permit Date: January 19, 2006Permit status: Finaled | Completion date: January 30, 2006 | Current use: Single family dwelling | Permit id: 409439 | |||||
Please do not request inspections under this permit until 2 business days after permit issuance. Date: January 23, 2015Permit type: Electrical permit | Permit status: Issued | Current use: Single family dwelling | Permit id: 701486 | |||||
Mechanical permit Date: February 9, 2015Permit status: Issued | Current use: Single family dwelling | Permit id: 703002 | |||||
Add- master bedroom and suite, roof raising and interior renovation revision 2/25/2015 Date: August 28, 2014 Value: $300,000Permit type: Building residential | Permit status: Issued | Current use: Single family dwelling | Permit id: 682309 | |||||
Install gas service in accordance with washington gas plan no. 486673. Work shall comply with montgomery county specifications for utility construction permit, the direction of the dps inspector and in accordance with the public right-of-way accessibility guidelines (prowag). A mill and overlay shall be required should the patch not meet the specifications as set forth by the current county specifications for utility construction permit and as directed by the dps row inspector. All lane closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. Permittee must check and coordinate with mcdot paving project schedule and have preconstruction meeting with dps row inspector prior to beginning of construction work. Date: March 11, 2015Permit type: Public right of way | Permit status: Issued | Current use: Public utility | Permit id: 331833 |