| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Change in use a-2 to m with interior alterations revision submitted 01/13/ - structrual, electrical, architectural, and mechanical.. 9982 sq ft., estimated cost 100,000. (emc) Date: August 7, 2008Permit type: Commercial building | Permit status: Finaled | Current use: Mercantile building | Permit id: 469581 | |||||
Bldg #469581 Date: July 30, 2009Permit type: Electrical permit | Permit status: Finaled | Current use: Mercantile building | Permit id: 517677 | |||||
Mechanical permit Date: April 23, 2010Permit status: Finaled | Current use: Business building | Permit id: 536004 | |||||
Test pit excavate 1 test pit within the county right of way. Pre-construction meeting required contact mc dps inspector chris cary @ 301-370-3686 work shall comply with the current montgomery county specifications for utility construction permit. Complete repair & restoration of the right of way shall be made, "in-kind", of any and all damages done to the existing improvements in the public right-of-way caused by construction operations on this site. Work shall be completed as directed by the dps inspector. All lane closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. Date: August 10, 2009Permit type: Public right of way | Permit status: Completed | Current use: Soil boring | Permit id: 262365 | |||||
On fenton st (bldg# 8618) construct excavation and compaction for water house connection and abandonment in accordance with wssc plans and specifications. Work shall comply with the current montgomery county specifications for utility construction permit. Install covered walkway and stage crane operations per the attached mc dot approved tcp. All lane closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. Complete repair (restoration of right of way) shall be made of any and all damages done to the existing improvements in the public right of way caused by construction operations on this site. Pre-construction meeting requiredcontact mcdps inspector chris cary at 301-370-3686 before and after installation. Date: January 25, 2010Permit type: Public right of way | Permit status: Finaled | Current use: Public right-of-way | Permit id: 261241 | |||||
Install gas service in accordance with washington gas plan no. 632061. Work shall comply with montgomery county specifications for utility construction permit, the direction of the dps inspector and in accordance with the public right-of-way accessibility guidelines (prowag). A mill and overlay shall be required should the patch not meet the specifications as set forth by the current county specifications for utility construction permit and as directed by the dps row inspector. All lane closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. Permittee must check and coordinate with mcdot paving project schedule and have preconstruction meeting with dps row inspector prior to beginning of construction work. Date: February 20, 2016Permit type: Public right of way | Permit status: Issued | Current use: Public utility | Permit id: 350530 | |||||
Dumpster: temporarily place a dumpster within the public right of way. The permittee agrees to hold montgomery county harmless from any liability associated with the placement of dumpsters in the public right of way. Dumpster locations, barricades and/or lights are to be placed as directed by the dps inspector. Date: April 14, 2009Permit type: Public right of way | Permit status: Completed | Current use: Dumpster | Permit id: 258332 |