Alteration permit Date: September 27, 2013Client: Phila Municipal Auth | Permit status: Completed | Permit id: 492627 | |||||
Demolition permit Date: November 2, 2012Client: Phila Municipal Auth | Permit status: Completed | Permit id: 436027 | |||||
Use permit Date: December 9, 2011Client: Phila Municipal Auth | Permit status: Completed | Permit id: 366972 | |||||
Alteration permit Date: August 5, 2016Client: Phila Municipal Auth | Permit status: Active | Permit id: 690874 | |||||
Electrical permit Date: October 27, 2016Client: Phila Municipal Auth | Permit status: Active | Permit id: 724458 | |||||
SCORE 100 Adding 3-new light poles with led fixtures, replace 2-fixtures on existing pole with led fixtures, add 1-wall pack, all work being connected to existing pole lighting ckt as per nec 2008 east district Date: June 16, 2017 Contractor: Schleig Electric IncPermit type: Electrical permit | Permit status: Active | Completion date: June 16, 2017 | Permit id: 779825 | |||||
SCORE 100 Remove 1 50 gal underground feul oil tank. Closure report to be submitted to inspector. Date: November 2, 2012 Contractor: Warren F Delong IncPermit type: Demolition permit | Permit status: Completed | Completion date: February 15, 2013 | Permit id: 436027 | |||||
Zoning not required for an existing water basin buildings, intake, filter, outlet, generator, and pumping station buildings as part of the philadelphia water department lot#1 with existing parking as previously approved. No signs this permit. Date: December 9, 2011Permit type: Use permit | Permit status: Completed | Completion date: September 11, 2013 | Permit id: 366972 | |||||
No change in use and occupancy. Interior alterations to include various concrete repair and replacement work, facade repairs, and concrete structural work as per approved plans. Separate permit required for mechanical, electrical, and plumbing work. All work shall be done in accordance with approved plans and supporting documentation. Date: September 27, 2013Permit type: Alteration permit | Permit status: Completed | Completion date: May 3, 2016 | Permit id: 492627 | |||||
For the removal of existing metal exterior veneer panels and replacement with a combination of new vertical metal and alternating stone veneer panels, and installation of a new exterior ladder with new post-installed anchors. (iebc 2009, compliance path: work-area method, lvl i alterations) Date: August 5, 2016Permit type: Alteration permit | Permit status: Active | Completion date: August 30, 2017 | Permit id: 690874 | |||||
SCORE 100 Demolish existing and install new conduit and exterior lighting as per 2008 nec (east district) Date: October 27, 2016 Contractor: Paramount Electrical Service LPermit type: Electrical permit | Permit status: Expired | Completion date: October 27, 2016 | Permit id: 724458 | |||||
SCORE 91 Installation of instrumentation wiring to flow and pressure transmitters... In accordance with 2008 nec (water dept. Bldg) Date: May 19, 2017 Contractor: Carr And Duff IncPermit type: Electrical permit | Permit status: Expired | Completion date: May 19, 2017 | Permit id: 784924 | |||||
SCORE 91 Perform electrical, security access control, cctv and instrumental work. For new water dept clearwell basin. Provide temp power for construction site per 2008 nec (water dept facility)east district Date: March 10, 2017 Contractor: Carr And Duff IncPermit type: Electrical permit | Permit status: Completed | Completion date: July 25, 2017 | Permit id: 755874 | |||||
SCORE 89 Disconnection and reconnection of backwash valves Date: August 2, 2017 Contractor: Lj Electra CorporationPermit type: Electrical permit | Permit status: Active | Completion date: August 2, 2017 | Permit id: 795732 |