ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Silver spring enterprise zone-new building-6 floor above ground, 1st floor retail, 3 below ground (garage) revision submitted on 11/19/15 - structural & architectural - 1121sq ft & cost = 40,0 (emc) Date: November 17, 2015 Value: $30,550,274Permit type: Commercial building | Permit status: Issued | Current use: Multi-family dwelling | Permit id: 671088 | |||||
Silver spring enterprise zone-new building- 1st floor retail, Date: November 17, 2015 Value: $1,502,100Permit type: Commercial building | Permit status: Issued | Current use: Mercantile building | Permit id: 687874 | |||||
Electrical permit Date: January 21, 2016Permit status: Issued | Current use: Multi-family dwelling | Permit id: 742351 | |||||
Install gas service in accordance with washington gas plan no. 708006. Work shall comply with montgomery county specifications for utility construction permit, the direction of the dps inspector and in accordance with the public right-of-way accessibility guidelines (prowag). A mill and overlay shall be required should the patch not meet the specifications as set forth by the current county specifications for utility construction permit and as directed by the dps row inspector. All lane closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. Permittee must check and coordinate with mcdot paving project schedule and have preconstruction meeting with dps row inspector prior to beginning of construction work. Date: October 21, 2016Permit type: Public right of way | Permit status: Issued | Current use: Public utility | Permit id: 354674 | |||||
Dig and backfill trench; build conduit; install cable and associated equipment in accordance with pepco plan no. 3520904. Work shall comply with montgomery county specifications for utility construction permit, the direction of the dps inspector and in accordance with the public right-of-way accessibility guidelines (prowag). A mill and overlay shall be required should the patch not meet the specifications as set forth by the current county specifications for utility construction permit and as directed by the dps row inspector. All lane closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. Permittee must check and coordinate with mcdot paving project schedule and have preconstruction meeting with dps row inspector prior to beginning of construction work. Date: September 19, 2016Permit type: Public right of way | Permit status: Issued | Current use: Public utility | Permit id: 354340 | |||||
Please do not request inspections under this permit until 2 business days after permit issuance. Date: October 28, 2016Permit type: Electrical permit | Permit status: Issued | Current use: Multi-family dwelling | Permit id: 778379 |