| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Dra living zoning lot 4 Date: August 15, 2008Permit status: Issued | Permit id: 08-04610 | |||||
Dra living zoning lot 4 Client: Dra Living Zoning Lot 4 | Permit type: Res: site work | Permit status: Closed | Current use: Residential | Permit id: 08-04610 | Parcel: 21152 | |||||
July 30, 2008 10:37:45 am kneel. Zoning for lot 4, future s/f. Reference permit 08-44 for grading approval. Location: hendersonville rd to w chapel to london to brooklyn; august 5, 2008 9:02:31 am kneel. Due to msd; zoning approval to construct new single family home at 84 brooklyn avenue. The applicant must meet all development standards of the udo. If setback requirements can not be met, this permit shall become null and void. A minimum of 2 off street parking spaces are required. No portion of the parking space may be located in the row. August 6, 2008 1:23:56 pm cedwards. Setbacks along street right of ways must be measured from the street right of way line or the street, whichever is closest to the property. All other setbacks are to be measured from the property boundary lines. Setbacks also apply such items as porches, decks, patios, etc.; engineering inspections requests must be made at least 24 hours in advance of inspections. The grading/erosion and stormwater inspector ass Permit type: Res: site work | Permit status: Closed | Permit id: 08-04610 | Parcel: 21152 | |||||
Dra living zoning lot 4 Date: September 29, 2015Client: Dra Living Zoning Lot 4 | Permit type: Res: site work | Permit status: Closed | Current use: Residential | Permit id: 08-04610 | Parcel: 21152 | |||||
July 30, 2008 10:37:45 am kneel. Zoning for lot 4, future s f. Reference permit 08-44 for grading approval. Location: hendersonville rd to w chapel to london to brooklyn; august 5, 2008 9:02:31 am kneel. Due to msd; zoning approval to construct new single family home at 84 brooklyn avenue. The applicant must meet all development standards of the udo. If setback requirements can not be met, this permit shall become null and void. A minimum of 2 off street parking spaces are required. No portion of the parking space may be located in the row. August 6, 2008 1:23:56 pm cedwards. Setbacks along street right of ways must be measured from the street right of way line or the street, whichever is closest to the property. All other setbacks are to be measured from the property boundary lines. Setbacks also apply such items as porches, decks, patios, etc.; engineering inspections requests must be made at least 24 hours in advance of inspections. The grading erosion and stormwater inspector ass Date: September 29, 2015Permit type: Res: site work | Permit status: Closed | Permit id: 08-04610 | Parcel: 21152 |