| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
57 unit building and 2 retail spaces. Largest unit 993 sqft - oar 918 reduced fees apply only to residential units. Date: January 16, 2015Permit type: Intake | Permit status: Closed | Completion date: December 19, 2014 | Permit id: 2014-251559-000 | |||||
Sprinkler - install a fire suppression system into a new apartment bldg Date: April 9, 2015Permit type: Intake | Permit status: Approved | Completion date: January 12, 2015 | Permit id: 2015-103304-000 | |||||
Alarm - install alarm system for new apt bldg Date: March 6, 2015Permit type: Intake | Permit status: Approved | Completion date: February 25, 2015 | Permit id: 2015-110469-000 | |||||
Phone/data/tv & fire alarm/ add (2) low voltage - structured cable and access control 4/10/15 Date: March 30, 2015Permit type: Intake | Permit status: Closed | Completion date: March 30, 2015 | Permit id: 2015-142024-000 | |||||
Approval of a new four-story stucco-clad building with a ground-floor retail space, three ground-floor entries for residential units, a ground-floor residential lobby entrance, and tuck under parking, located in the kenton plan district, north interstate plan district, and kenton conservation district. Approval per the approved plans and drawings, exhibits c-1 through c-39, signed and dated july 30, 2014, subject to the following conditions:a. As part of the building permit application submittal, the following development-related condition must be noted on each of the four required site plans or included as a sheet in the numbered set of plans. The sheet on which this information appears must be labeled zoning compliance page - case file lu 14-134423 hr. All requirements must be graphically represented on the site plan, landscape, or other required plan and must be labeled required. B. At the building faade areas labeled with inset windows at stucco on exhibits c-17 and c-18, the windows Date: July 31, 2014Permit type: Land use review | Permit status: Completed | Completion date: April 7, 2014 | Permit id: 2014-134423-000 | |||||
Pbot only regular pw permit Date: December 17, 2014Permit type: Intake pw | Permit status: Assigned | Completion date: June 17, 2014 | Permit id: 2014-151051-000 | |||||
4 story, wood frame, slab on grade multi-family apartment project. Ground floor has 15 sq ft of warm shell retail space, tuck under parking for 17 vehicles, 1 loading stall and 5 residential units. Floors 2-4 are all units. 57 units in total. Date: October 10, 2014Permit type: Application | Permit status: Approved | Completion date: June 30, 2014 | Permit id: 2014-168320-000 | |||||
Dfs for tie down rod system Date: January 2, 2015Permit type: Application | Permit status: Approved | Completion date: November 17, 2014 | Permit id: 2014-168320-Dfs | |||||
Dfs for wood joists Date: February 25, 2015Permit type: Application | Permit status: Approved | Completion date: December 18, 2014 | Permit id: 2014-168320-Dfs | |||||
Dfs for roof trusses Date: March 9, 2015Permit type: Application | Permit status: Approved | Completion date: February 25, 2015 | Permit id: 2014-168320-Dfs | |||||
Dfs for fall protection Date: March 9, 2015Permit type: Application | Permit status: Approved | Completion date: February 26, 2015 | Permit id: 2014-168320-Dfs | |||||
Dfs for storefronts Permit type: Application | Permit status: Approved | Completion date: June 18, 2015 | Permit id: 2014-168320-Dfs | |||||
Dfs for storefronts Permit type: Issuance/intake | Permit status: Intake | Completion date: June 18, 2015 | Permit id: 2014-168320-Dfs | |||||
Dfs for storefronts Permit type: Process management | Permit status: Closed | Completion date: June 19, 2015 | Permit id: 2014-168320-Dfs | |||||
Dfs for storefronts Permit type: Planning and zoning | Permit status: Approved | Completion date: June 19, 2015 | Permit id: 2014-168320-Dfs | |||||
Dfs for rooftop mep anchors and seismic restraints Permit type: Application | Permit status: Approved | Completion date: June 24, 2015 | Permit id: 2014-168320-Dfs | |||||
Dfs for rooftop mep anchors and seismic restraints Permit type: Issuance/intake | Permit status: Intake | Completion date: June 24, 2015 | Permit id: 2014-168320-Dfs | |||||
Rev 1 - stormwater area is revised by moving the stormwater planter wall along the northeast edge of the wall further south from the property line. The revision accommodates the stormwater requirement. Ss connection for sewer has been revised based on existing condition. Date: December 5, 2014Permit type: Application | Permit status: Approved | Completion date: November 12, 2014 | Permit id: 2014-168320-Rev | |||||
Second floor at the bay projection near project grids 14 and f, joist span direction has changed, ref. S102a. Roof truss layout and bearing locations have been updated, ref s105. Date: February 25, 2015Permit type: Application | Permit status: Approved | Completion date: February 6, 2015 | Permit id: 2014-168320-Rev | |||||
Pthps for apartments, open garage, washroom, kitchen and dryer exhaust, two 4-ton gas packs w/ss hx for corridor supply, plans w/co Date: October 9, 2014Permit type: Intake | Permit status: Closed | Completion date: June 30, 2014 | Permit id: 2014-173955-000 | |||||
Storm conn: 282 lf of 12 pvc combo main, approx d=15, in n willis blvd. Contractor shall build new 8 branch per std p-262 and install 8x12 tee in sewer main. Contractor to verify all depths and locations in field. Date: October 17, 2014Permit type: Intake | Permit status: Closed | Completion date: October 17, 2014 | Permit id: 2014-227197-000 | |||||
Install new storm system with area drains and stormwater planters Date: October 17, 2014Permit type: Intake | Permit status: Closed | Completion date: October 17, 2014 | Permit id: 2014-227201-000 | |||||
New interior plumbing for 57 units and 1 of water service on property Date: November 4, 2014Permit type: Intake | Permit status: Closed | Completion date: November 4, 2014 | Permit id: 2014-234130-000 | |||||
Gas piping to 57 ranges and two rtu and 3 water heaters, plans w/co Date: November 4, 2014Permit type: Intake | Permit status: Closed | Completion date: November 4, 2014 | Permit id: 2014-234162-000 | |||||
Install (1) illuminated projecting sign, 10. 5 sq ft, south elevation. Date: August 25, 2015Permit type: Intake | Permit status: Closed | Completion date: August 17, 2015 | Permit id: 2015-218960-000 | |||||
Install (1) sign circuit Date: August 17, 2015Permit type: Intake | Permit status: Closed | Completion date: August 17, 2015 | Permit id: 2015-218962-000 | |||||
Approval of exterior alterations, to include installation of photovoltaic panels to be mounted directly on to the roof surface, tilted toward the south with the highest point of the panel, approximately 14 above the surface of the roof. The proposed panels are to be set back from the roof edge by no less than 4-8. Approval per exhibits c-1 through c-6, signed and dated 01/11/2016, subject to the following conditions:a. As part of the building permit application submittal, the following development-related must be noted on each of the four required site plans or included as a sheet in the numbered set of plans. The sheet on which this information appears must be labeled zoning compliance page- case file lu 15-257177 hr. All requirements must be graphically represented on the site plan, landscape, or other required plan and must be labeled required. B. The panel claw frames that attach the photovoltaic modules to the roof surface are to have a black finish. Date: January 12, 2016Permit type: Land use review | Permit status: Completed | Completion date: October 30, 2015 | Permit id: 2015-257177-000 | |||||
Solar - 24. 1kw self ballasted pv system located on roof electrical on 15-200325-et see 15-257177-lu for info Permit type: Application | Permit status: Approved | Completion date: March 24, 2016 | Permit id: 2016-140062-000 | |||||
Solar - 24. 1kw self ballasted pv system located on roof electrical on 15-200325-et see 15-257177-lu for info Permit type: Planning and zoning | Permit status: Approved | Completion date: March 24, 2016 | Permit id: 2016-140062-000 | |||||
Solar - 24. 1kw self ballasted pv system located on roof electrical on 15-200325-et see 15-257177-lu for info Permit type: Environmental services | Permit status: Not reqd | Completion date: March 24, 2016 | Permit id: 2016-140062-000 | |||||
Solar - 24. 1kw self ballasted pv system located on roof electrical on 15-200325-et see 15-257177-lu for info Permit type: Transportation | Permit status: Not reqd | Completion date: March 24, 2016 | Permit id: 2016-140062-000 | |||||
Dfs for storefronts Date: August 24, 2015Permit type: Application | Permit status: Approved | Completion date: June 18, 2015 | Permit id: 2014-168320-Dfs | |||||
Dfs for rooftop mep anchors and seismic restraints Date: August 24, 2015Permit type: Application | Permit status: Approved | Completion date: June 24, 2015 | Permit id: 2014-168320-Dfs | |||||
Rev 03 - truss revision Date: August 24, 2015Permit type: Application | Permit status: Approved | Completion date: August 24, 2015 | Permit id: 2014-168320-Rev | |||||
Install 3 amp temp power overhead service for construction use. Overhead power to job trailerfaxed Date: October 20, 2014Permit type: Electrical inspections | Permit status: Approved | Completion date: October 12, 2015 | Permit id: 2014-228008-000 | |||||
To install floor box & under floor conduit out of building Date: December 11, 2014Permit type: Electrical inspections | Permit status: Approved | Completion date: October 12, 2015 | Permit id: 2014-248614-000 | |||||
Low volt wiring and t-stats Date: January 21, 2015Permit type: Electrical inspections | Permit status: Approved | Completion date: September 14, 2015 | Permit id: 2015-107785-000 | |||||
Low volt wiring and t-stats 4th floor Date: January 21, 2015Permit type: Electrical inspections | Permit status: Approved | Completion date: October 12, 2015 | Permit id: 2015-107790-000 | |||||
Low volt wiring and t-stats rooftop Date: January 21, 2015Permit type: Electrical inspections | Permit status: Approved | Completion date: October 12, 2015 | Permit id: 2015-107793-000 | |||||
Installation of a 24. 18 kw roof mounted pv system Date: July 13, 2015Permit type: Intake | Permit status: Closed | Completion date: July 13, 2015 | Permit id: 2015-200325-000 | |||||
Approval of exterior alterations, to include installation of photovoltaic panels to be mounted directly on to the roof surface, tilted toward the south with the highest point of the panel, approximately 14 above the surface of the roof. The proposed panels are to be set back from the roof edge by no less than 4-8. Approval per exhibits c-1 through c-6, signed and dated 01 11 2016, subject to the following conditions:a. As part of the building permit application submittal, the following development-related must be noted on each of the four required site plans or included as a sheet in the numbered set of plans. The sheet on which this information appears must be labeled zoning compliance page- case file lu 15-257177 hr. All requirements must be graphically represented on the site plan, landscape, or other required plan and must be labeled required. B. The panel claw frames that attach the photovoltaic modules to the roof surface are to have a black finish. Date: January 12, 2016Permit type: Land use review | Permit status: Completed | Completion date: October 30, 2015 | Permit id: 2015-257177-000 | |||||
Solar - 24. 1kw self ballasted pv system located on roof electrical on 15-200325-et see 15-257177-lu for info Permit type: Application | Permit status: Approved | Completion date: March 24, 2016 | Permit id: 2016-140062-000 | |||||
Solar - 24. 1kw self ballasted pv system located on roof electrical on 15-200325-et see 15-257177-lu for info Permit type: Planning and zoning | Permit status: Approved | Completion date: March 24, 2016 | Permit id: 2016-140062-000 | |||||
Solar - 24. 1kw self ballasted pv system located on roof electrical on 15-200325-et see 15-257177-lu for info Permit type: Environmental services | Permit status: Not reqd | Completion date: March 24, 2016 | Permit id: 2016-140062-000 | |||||
Solar - 24. 1kw self ballasted pv system located on roof electrical on 15-200325-et see 15-257177-lu for info Permit type: Transportation | Permit status: Not reqd | Completion date: March 24, 2016 | Permit id: 2016-140062-000 | |||||
Pthps for apartments, open garage, washroom, kitchen and dryer exhaust, two 4-ton gas packs w ss hx for corridor supply, plans w co Date: October 9, 2014Permit type: Intake | Permit status: Closed | Completion date: June 30, 2014 | Permit id: 2014-173955-000 | |||||
Gas piping to 57 ranges and two rtu and 3 water heaters, plans w co Date: November 4, 2014Permit type: Intake | Permit status: Closed | Completion date: November 4, 2014 | Permit id: 2014-234162-000 | |||||
Phone data tv & fire alarm add (2) low voltage - structured cable and access control 4 10 15 Date: March 30, 2015Permit type: Intake | Permit status: Closed | Completion date: March 30, 2015 | Permit id: 2015-142024-000 | |||||
Demo old motel Date: December 5, 2006Client: North Portland Neighborhood Services | Permit type: Demolition | Permit status: Final | Completion date: November 5, 2007 | Current use: Apartments/condos (3 or more units) | Permit id: 2006-181170-000 |