ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Zoning permit Date: October 8, 2015Client: Parc Partners One Llc | Permit status: Completed | Permit id: 642777 | |||||
Suppression permit Date: September 29, 2016Client: Parc Partners One Llc | Permit status: Active | Permit id: 725371 | |||||
New construction permit Date: July 20, 2016Client: Parc Partners One Llc | Permit status: Active | Permit id: 653951 | |||||
Electrical permit Date: September 19, 2016Client: Parc Partners One Llc | Permit status: Active | Permit id: 714518 | |||||
Zoning/use permit Date: December 16, 2015Client: Parc Partners One Llc | Permit status: Completed | Permit id: 652205 | |||||
On 02/09/16 the department of licenses and inspections issued a notice of refusal for application #653951. Date: February 22, 2016Client: Parc Partners One Llc | Applicant: Rustin Ohler | Permit type: Appeal | Permit status: Approved | Completion date: July 28, 2016 | Permit id: 27066 | |||||
SCORE 82 Ez permit ductwork & warm-air appliances- for the installation of new ductwork, registers grilles diffusers, and warm-air appliances as per attached standard. Deviations from this standard will result in permit revocation and require submission of construction plans.(all units to be self contained - no penetration of rated assemblies) Date: December 7, 2016 Contractor: Aleksandr ProzorovPermit type: Mechanical permit | Permit status: Completed | Completion date: May 2, 2017 | Permit id: 741726 | |||||
For the sub-division of lots to create (1) lot from (2) as per plans. Lot 1 for the erection of a four story structure on each new lot. Two roof deck(accessed by pilot houses, containing stairs and landing only) as per plans, to be used as a three family dwelling. Lot 2 for the erection of a four story structure on each new lot. Two roof deck(accessed by pilot houses, containing stairs and landings only) as per plans. Date: October 8, 2015Permit type: Zoning permit | Permit status: Completed | Completion date: October 8, 2015 | Permit id: 642777 | |||||
New construction permit Date: July 20, 2016Client: Parc Partners One Llc | Permit status: Active | Permit id: 653951 | |||||
Electrical permit Date: September 19, 2016Client: Parc Partners One Llc | Permit status: Active | Permit id: 714518 | |||||
Zoning use permit Date: December 16, 2015Client: Parc Partners One Llc | Permit status: Completed | Permit id: 652205 | |||||
Plumbing permit Date: November 29, 2016Client: Parc Partners One Llc | Permit status: Completed | Permit id: 739601 | |||||
Suppression permit Date: September 29, 2016Client: Parc Partners One Llc | Permit status: Active | Permit id: 725371 | |||||
Zoning permit Date: October 8, 2015Client: Parc Partners One Llc | Permit status: Completed | Permit id: 642777 | |||||
Mechanical permit Date: December 7, 2016Client: Parc Partners One Llc | Permit status: Active | Permit id: 741726 | |||||
On 02 09 16 the department of licenses and inspections issued a notice of refusal for application #653951. Date: February 22, 2016Client: Parc Partners One Llc | Applicant: Rustin Ohler | Permit type: Appeal | Permit status: Approved | Completion date: July 28, 2016 | Permit id: 27066 | |||||
For the erection of an attached structure (maximum height nte 38 feet) with a roof deck accessed by two pilot houses for use as three(3) dwelling units . (size and location as shown on the application) Date: December 16, 2015Permit type: Zoning/use permit | Permit status: Completed | Completion date: December 16, 2015 | Permit id: 652205 | |||||
SCORE 100 Main drain,curb trap,fai,5" lateral and 1" water distrubtion pa20162801521 (triplex)self certifications are no longer permitted","all excavations and plumbing trenches in excess of 5 ft in depth must have approved shoring in place at the time of inspection" Date: November 29, 2016 Contractor: Excel Plumbing Heating Ac IncPermit type: Plumbing permit | Permit status: Completed | Completion date: December 6, 2016 | Permit id: 739601 | |||||
SCORE 100 Installation of a fire suppression sprinkler system in accordance with nfpa 13 and plans approved under ap #717093. Date: September 29, 2016 Contractor: Shannon Fire ProtectionPermit type: Suppression permit | Permit status: Completed | Completion date: July 5, 2017 | Permit id: 725371 | |||||
SCORE 86 New construction: interior plumbing; four (4) story structure with roof deck; the installation will comply with the philadephia plubming code 2004 Date: October 21, 2016 Contractor: New Age Plumbing IncPermit type: Plumbing permit | Permit status: Completed | Completion date: April 28, 2017 | Permit id: 715584 | |||||
SCORE 100 Rough in wiring for triplex and 300amp service per 2008 nec (cc district install fire alarm per nfpa 72 one set of plans for 714524,714518 and 714521 Date: September 19, 2016 Contractor: A.M. Electric IncPermit type: Electrical permit | Permit status: Completed | Completion date: April 18, 2017 | Permit id: 714518 | |||||
For the erection of four (4) story structure with roof deck access structure. Foundation design and underpinning shall be in accordanc with the approved geotechnical report foundation underpinning plans. Structure to be used as a three (3) family dwelling. Entire building to be sprinkler per nfpa 13 per bbs case variance no. 27066. Separate permit for mep and fire suppression work. Date: July 20, 2016Permit type: New construction permit | Permit status: Completed | Completion date: May 19, 2017 | Permit id: 653951 |