| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Intersection type driveways: construct intersection type driveways, pipe culverts, storm drain connection, sidewalk, handicap ramps, and leadwalks as described on the attached approved plan. Complete repair (restoration of right of way) shall be made of any and all damages done to the existing improvements in the public right of way caused by construction operations on this site. Work shall be completed as directed by the dps inspector. Date: September 10, 2009Permit type: Public right of way | Permit status: Issued | Current use: Public right-of-way | Permit id: 259482 | |||||
Dig and backfill trench, install overhead equipment, cable and associated equipment to provide services in accordance with pepco plan no. 3294014. Work shall comply with the current montgomery county specifications for utility construction permit and the direction of the dps inspector. Complete restoration shall be made of any and all damages done to the existing improvements in the public right of way caused by construction operations on this site. A mill and overlay shall be required should the patch not meet the specifications as set forth by the current county specifications for utility construction permit and as directed by the dps row inspector. All lane closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. Date: January 14, 2011Permit type: Public right of way | Permit status: Finaled | Current use: Public utility | Permit id: 268006 |