ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Electrical permit Date: July 22, 2014Permit status: Finaled | Completion date: February 5, 2015 | Current use: Single family dwelling | Permit id: 681235 | |||||
New residential construction- low voltage for security devices Date: September 25, 2014Permit type: Electrical permit | Permit status: Issued | Current use: Single family dwelling | Permit id: 689178 | |||||
New const. Date: May 19, 2014 Value: $205,000Permit type: Building residential permit | Permit status: Finaled | Current use: Single family dwelling | Permit id: 664454 | |||||
Under the pavement cut moratorium until 11/3/14. A full width 2 mill and overlayis requiredper the current county specifications for utility construction permit and as directed by the dps row inspector. Replace pole; bore roadway; dig and backfill trench; build conduit; install cable and associated equipment in accordance with pepco plan no. 3452524. Work shall comply with montgomery county specifications for utility construction permit, the direction of the dps inspector and in accordance with the public right-of-way accessibility guidelines (prowag). A mill and overlay shall be required should the patch not meet the specifications as set forth by the current county specifications for utility construction permit and as directed by the dps row inspector. All lane closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. Permittee must check mcdot paving project schedule an Date: July 9, 2014Permit type: Public right of way | Permit status: Issued | Current use: Public utility | Permit id: 318069 | |||||
Dw permit (residential) construct mc-301. 05 type driveway in accordance with montgomery county standards and specifications. Work shall be complete as directed by the dps row inspector and in accordance with the public right-of-way accessibility guidelines (prowag). Replace two of the dot approved 1. 5" caliper minor tree between the months of october nad april. Complete repair (restoration of right of way) shall be made of any and all damages done to the existing improvements in the public right of way caused by construction operations on this site. All lane and sidewalk closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. A maryland dnr permit and a mc dps tree protection plan approval are required prior to remove/impact street trees. Date: May 16, 2014Permit type: Public right of way | Permit status: Completed | Current use: Driveway | Permit id: 310233 | |||||
Under the pavement cut moratorium until 11/3/14. A full width 2 mill and overlayis requiredper the current county specifications for utility construction permit and as directed by the dps row inspector. Install gas service in accordance with washington gas plan no. 335758. Work shall comply with montgomery county specifications for utility construction permit, the direction of the dps inspector and in accordance with the public right-of-way accessibility guidelines (prowag). A mill and overlay shall be required should the patch not meet the specifications as set forth by the current county specifications for utility construction permit and as directed by the dps row inspector. All lane closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. Permittee must check mcdot paving project schedule and have preconstruction meeting with dps row inspector pr Date: July 10, 2014Permit type: Public right of way | Permit status: Issued | Current use: Public utility | Permit id: 316588 | |||||
Under the pavement cut moratorium until 11/3/14. A full width 2 mill and overlayis requiredper the current county specifications for utility construction permit and as directed by the dps row inspector. Install water and sewer house connections in accordance with wssc plans and specifications. Work shall comply with montgomery county specifications for utility construction permit the direction of the dps inspector and in accordance with the public right-of-way accessibility guidelines (prowag). A mill and overlay shall be required should the patch not meet the specifications as set forth by the current county specifications for utility construction permit and as directed by the dps row inspector. All lane closures and traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. Permittee must check and coordinate with mcdot paving project schedule and have preconstruction meeting with Date: August 5, 2014Permit type: Public right of way | Permit status: Issued | Current use: Public utility | Permit id: 319949 |