| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Place, splice and test 34 aerial from pole 8312, 8362 and another pole/buried fiber optic cable facilities in accordance with verizon plan no. 0ssc 6a0amxh customer applied for fios. Work shall comply with montgomery county specifications for utility construction permit, the direction of the dps inspector and in accordance with the public right-of-way accessibility guidelines (prowag). A mill and overlay shall be required should the patch not meet the specifications as set forth by the current county specifications for utility construction permit and as directed by the dps row inspector. All lane closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. Must check mcdot paving project schedule and have preconstruction meeting with dps
|