| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Remove wall and door between closet and bathroom in ground level bath. Add a new wall to create a storage alcove. Replace tub with new walk in shower and replace single sink with a dual sink vanity. Add walls to create a new closet in the bedroom. Remove door into bedroom and into bathroom and replace each with a sliding barn style door. Replace exterior sliding door in bedroom like for like. Repair, not replace, window in bathroom and bedroom. Trades to be obtaine separately. Date: November 17, 2015Permit type: Application | Permit status: Approved | Completion date: November 16, 2015 | Permit id: 2015-265373-000 | |||||
Relocate two lavs and change tub shower to shower only. Date: November 18, 2015Permit type: Plumbing inspections | Permit status: Approved | Completion date: December 11, 2015 | Permit id: 2015-266562-000 | |||||
Bath & closet wiring Date: December 9, 2015Permit type: Electrical inspections | Permit status: Approved | Completion date: December 15, 2015 | Permit id: 2015-275298-000 | |||||
Approval of exterior alterations to a non-contributing structure in the alphabet historic district, to include: replacement of existing eifs siding with cement board stucco and replacement of existing windows with wood windows on the front faade. Per the approvedsite plans, exhibits c-1 through c-4, signed and dated 03/31/2016, subject to the following conditions:a. As part of the building permit application submittal, each of the 4 required site plans and any additional drawings must reflect the information and design approved by this land use review as indicated in exhibits c. 1-c. 4. The sheets on which this information appears must be labeled, proposal and design as approved in case file # lu 15-276101 hr. No field changes allowed. Date: April 4, 2016Permit type: Land use review | Permit status: Completed | Completion date: December 14, 2015 | Permit id: 2015-276101-000 | |||||
Approval of exterior alterations to a non-contributing structure in the alphabet historic district, to include: replacement of existing eifs siding with cement board stucco and replacement of existing windows with wood windows on the front faade. Per the approvedsite plans, exhibits c-1 through c-4, signed and dated 03 31 2016, subject to the following conditions:a. As part of the building permit application submittal, each of the 4 required site plans and any additional drawings must reflect the information and design approved by this land use review as indicated in exhibits c. 1-c. 4. The sheets on which this information appears must be labeled, proposal and design as approved in case file # lu 15-276101 hr. No field changes allowed. Date: April 4, 2016Permit type: Land use review | Permit status: Completed | Completion date: December 14, 2015 | Permit id: 2015-276101-000 | |||||
Addition to third floor of sfr (bldg is attached to adjacent sfr - see 88-003594-co and appeals) Date: December 31, 2008Client: Neighbors West Northwest | Permit type: Addition | Permit status: Final | Completion date: February 17, 2009 | Current use: Single family dwelling | Permit id: 2008-191813-000 |