ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Electrical permit Date: September 9, 2008Permit status: Finaled | Completion date: November 18, 2008 | Current use: Single family dwelling | Permit id: 495183 | |||||
Replacegas service in accordance with washington gas plan no. 304713. Work shall comply with montgomery county specifications for utility construction permit, the direction of the dps inspector and in accordance with the public right-of-way accessibility guidelines (prowag). A mill and overlay shall be required should the patch not meet the specifications as set forth by the current county specifications for utility construction permit and as directed by the dps row inspector. All lane closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. Permittee must check mcdot paving project schedule and have preconstruction meeting with dps row inspector prior to beginning of construction work. Date: May 15, 2014Permit type: Public right of way | Permit status: Issued | Current use: Public utility | Permit id: 313255 | |||||
On rayburn rd (house #8201)replace oh wire,install pole,overhead wire and associated equipment to provide 4 amp underground service in accordance with pepco plan no. 3271932. Complete repair (restoration of right of way) shall be made of any and all damages done to the existing improvements in the public right of way caused by construction operations on this site. Pre-construction meeting requiredcontact mcdps inspector ralph wolfe at 301-370-3692 before and after installation. Date: October 23, 2008Permit type: Public right of way | Permit status: Finaled | Current use: Public utility | Permit id: 259698 |