Electrical permit Date: July 26, 2013Permit status: Finaled | Current use: Single family dwelling | Permit id: 643473 | |||||
2 amp temp. Pole service for construction Date: July 26, 2013Permit type: Electrical permit | Permit status: Finaled | Current use: Single family dwelling | Permit id: 643474 | |||||
New heating. Cooling and ductwork - manual j submitted Date: October 24, 2013Permit type: Mechanical permit | Permit status: Finaled | Current use: Single family dwelling | Permit id: 652647 | |||||
Demo / rebuild Date: April 17, 2013 Value: $200,000Permit type: Building residential permit | Permit status: Issued | Current use: Single family dwelling | Permit id: 612680 | |||||
Temporary construction entrance construct temporary stabilized construction entrance. Proper precautions must be taken to keep the roadways free of mud, debris or other obstructions. Prior to release this permit remove construction entrance. Complete repair (restoration of right of way including haul routes) shall be made of any and all damages done to the existing improvements in the public right of way caused by construction operations on this site. Work shall be complete as directed by the dps inspector and in accordance with ada & aba accessibility guidelines. Md dnr permit and mc dot highway serivces tree division permission are required prior to remove street Date: April 17, 2013Permit type: Public right of way | Permit status: Completed | Current use: Driveway | Permit id: 291443 | |||||
Install pole,make a urd cable pole,install downguy & anchor. Install cable and associated equipment in accordance with pepco plan no. 3418195. Work shall comply with montgomery county specifications for utility construction permit and in accordance with the public right-of-way accessibility guidelines (prowag). A mill and overlay shall be required should the patch not meet the specifications as set forth by the current county specifications for utility construction permit . All lane closures/traffic controls shall comply with the mcdot approved traffic control plans. Must check mcdot paving project schedule and have preconstruction meeting with dps row inspector prior to beginning of construction work. Date: November 8, 2013Permit type: Public right of way | Permit status: Finaled | Current use: Public utility | Permit id: 301710 | |||||
Install gas service in accordance with washington gas plan no. 190913. Work shall comply with montgomery county specifications for utility construction permit, the direction of the dps inspector and in accordance with the public right-of-way accessibility guidelines (prowag). A mill and overlay shall be required should the patch not meet the specifications as set forth by the current county specifications for utility construction permit and as directed by the dps row inspector. All lane closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. Must check mcdot paving project schedule and have preconstruct Date: August 9, 2013Permit type: Public right of way | Permit status: Issued | Current use: Public utility | Permit id: 298628 | |||||
Must check mcdot paving projects schedule and have preconstruction meeting with dps row inspector prior to beginning of construction. Construct water and sewer house connections in accordance with wssc plans and specifications. Work shall comply with montgomery county specifications for utility construction permit the direction of the dps inspector and ada & aba accessibility guidelines. A mill and overlay shall be required should the patch not meet the specifications as set forth by the current county
|