It is the decision of the design commission to approve design review for a 31,5 square-foot mixed use building on an 8,963 square-foot site within the central eastside district including three stories of office work space (approximately 24,0 square feet total) over ground floor retail (approximately 2,6 square feet total) and ground floor parking (14 stalls), and a roof-top plaza (approximately 2,0 square feet) and a small plaza (approximately 13 square feet) at the intersection of se stark and sandy blvd. Approval of the following three (3) modifications: modification 1 - 33. 266. 310. C. 2. B loading standards. One standard a loading space (35lx10wx13h) is required. The project proposes one standard b space (18lx9wx10h). Modification 2 - 33. 266. 130. F. 1. A. Parking area layouts. Requires that parking areas be designed to that a vehicle may enter or exit without having to move another vehicle. The project proposes that the loading space block access to stacked parking. Modification 3 - 33. 1 Date: May 7, 2015Permit type: Land use review | Permit status: Completed | Completion date: February 17, 2015 | Permit id: 2015-119651-000 | |||||
Pbot pw permit Permit type: Intake pw | Permit status: Assigned | Completion date: April 26, 2015 | Permit id: 2015-150515-000 | |||||
Pbot pw permit Permit type: Pre-design pw | Permit status: Not reqd | Completion date: April 26, 2015 | Permit id: 2015-150515-000 | |||||
Pbot pw permit Permit type: Pre-design pw | Permit status: Received | Completion date: April 16, 2015 | Permit id: 2015-150515-000 | |||||
Pbot pw permit Permit type: Pre-design pw | Permit status: Accepted for review | Completion date: April 22, 2015 | Permit id: 2015-150515-000 | |||||
Pbot pw permit Permit type: Pre-design pw | Permit status: Completed | Completion date: May 11, 2015 | Permit id: 2015-150515-000 | |||||
Pbot pw permit Permit type: Pre-design pw | Permit status: Billed | Completion date: April 26, 2015 | Permit id: 2015-150515-000 | |||||
Pbot pw permit Permit type: Utility review - all | Permit status: No additional review | Completion date: May 11, 2015 | Permit id: 2015-150515-000 | |||||
Pbot pw permit Permit type: Plan review pw | Permit status: Approved | Completion date: May 11, 2015 | Permit id: 2015-150515-000 | |||||
Pbot pw permit Permit type: Pre-issuance pw | Permit status: Not reqd | Completion date: April 26, 2015 | Permit id: 2015-150515-000 | |||||
Demolish existing 2092 sf existing single story commercial building and parking lot, disconnect and cap utilities as required Date: August 7, 2015Permit type: Application | Permit status: Approved | Completion date: August 6, 2015 | Permit id: 2015-213221-000 | |||||
Sewer cap. Date: September 30, 2015Permit type: Intake | Permit status: Closed | Completion date: September 30, 2015 | Permit id: 2015-244265-000 | |||||
It is the decision of the design commission to deny design review for the proposal to use wood siding at the ground floor storefront in place of steel as required by condition of approval in previous case (lu15-119651 dzm). Date: January 15, 2016Permit type: Land use review | Permit status: Completed | Completion date: November 4, 2015 | Permit id: 2015-254878-000 | |||||
Fire alarm, access control Date: December 29, 2015Permit type: Intake | Permit status: Closed | Completion date: December 29, 2015 | Permit id: 2015-282818-000 | |||||
Ti for first time tenant on 2nd floor - add interior walls for build out of new office Permit type: Application | Permit status: Approved | Completion date: January 8, 2016 | Permit id: 2016-102675-000 | |||||
Ti for first time tenant on 2nd floor - add interior walls for build out of new office Permit type: Issuance/intake | Permit status: Intake | Completion date: January 8, 2016 | Permit id: 2016-102675-000 | |||||
Ti for first time tenant on 2nd floor - add interior walls for build out of new office Permit type: Process management | Permit status: Closed | Completion date: January 20, 2016 | Permit id: 2016-102675-000 | |||||
Ti for first time tenant on 2nd floor - add interior walls for build out of new office Permit type: Process management | Permit status: Closed | Completion date: March 11, 2016 | Permit id: 2016-102675-000 | |||||
Ti for first time tenant on 2nd floor - add interior walls for build out of new office Permit type: Process management | Permit status: Closed | Completion date: March 25, 2016 | Permit id: 2016-102675-000 | |||||
Ti for first time tenant on 2nd floor - add interior walls for build out of new office Permit type: Process management | Permit status: Closed | Completion date: April 4, 2016 | Permit id: 2016-102675-000 | |||||
Ti for first time tenant on 2nd floor - add interior walls for build out of new office Permit type: Planning and zoning | Permit status: Approved | Completion date: January 8, 2016 | Permit id: 2016-102675-000 | |||||
Ti for first time tenant on 2nd floor - add interior walls for build out of new office Permit type: Site development | Permit status: Not reqd | Completion date: January 12, 2016 | Permit id: 2016-102675-000 | |||||
Ti for first time tenant on 2nd floor - add interior walls for build out of new office Permit type: Life safety | Permit status: Approved | Completion date: March 15, 2016 | Permit id: 2016-102675-000 | |||||
Ti for first time tenant on 2nd floor - add interior walls for build out of new office Permit type: Structural | Permit status: Not reqd | Completion date: January 15, 2016 | Permit id: 2016-102675-000 | |||||
Ti for first time tenant on 2nd floor - add interior walls for build out of new office Permit type: Fire bureau | Permit status: Approved | Completion date: March 29, 2016 | Permit id: 2016-102675-000 | |||||
Ti for first time tenant on 2nd floor - add interior walls for build out of new office Permit type: Environmental services | Permit status: Approved | Completion date: January 26, 2016 | Permit id: 2016-102675-000 | |||||
Ti for first time tenant on 2nd floor - add interior walls for build out of new office Permit type: Environmental services | Permit status: Approved | Completion date: January 27, 2016 | Permit id: 2016-102675-000 | |||||
Ti for first time tenant on 2nd floor - add interior walls for build out of new office Permit type: Transportation | Permit status: Approved | Completion date: January 20, 2016 | Permit id: 2016-102675-000 | |||||
Ti for first time tenant on 2nd floor - add interior walls for build out of new office Permit type: Transportation | Permit status: Approved | Completion date: January 21, 2016 | Permit id: 2016-102675-000 | |||||
Ti for first time tenant on 2nd floor - add interior walls for build out of new office Permit type: Water bureau review | Permit status: Not reqd | Completion date: January 21, 2016 | Permit id: 2016-102675-000 | |||||
Ti for first time tenant on 2nd floor - add interior walls for build out of new office Permit type: Parks bureau | Permit status: Approved | Completion date: January 25, 2016 | Permit id: 2016-102675-000 | |||||
Ti for first time tenant on 2nd floor - add interior walls for build out of new office Permit type: Issuance | Permit status: Approved | Completion date: April 4, 2016 | Permit id: 2016-102675-000 | |||||
Low voltage controls Date: January 26, 2016Permit type: Intake | Permit status: Closed | Completion date: January 26, 2016 | Permit id: 2016-111338-000 | |||||
Pbot pw permit Date: December 9, 2015Permit type: Intake pw | Permit status: Assigned | Completion date: August 31, 2015 | Permit id: 2015-150515-000 | |||||
Ti for first time tenant on 2nd floor - add interior walls for build out of new office Permit type: Application | Permit status: Approved | Completion date: January 8, 2016 | Permit id: 2016-102675-000 | |||||
Ti for first time tenant on 2nd floor - add interior walls for build out of new office Permit type: Issuance/intake | Permit status: Intake | Completion date: January 8, 2016 | Permit id: 2016-102675-000 | |||||
Ti for first time tenant on 2nd floor - add interior walls for build out of new office Permit type: Process management | Permit status: Closed | Completion date: January 20, 2016 | Permit id: 2016-102675-000 | |||||
Ti for first time tenant on 2nd floor - add interior walls for build out of new office Permit type: Process management | Permit status: Closed | Completion date: March 11, 2016 | Permit id: 2016-102675-000 | |||||
Ti for first time tenant on 2nd floor - add interior walls for build out of new office Permit type: Process management | Permit status: Closed | Completion date: March 25, 2016 | Permit id: 2016-102675-000 | |||||
Ti for first time tenant on 2nd floor - add interior walls for build out of new office Permit type: Process management | Permit status: Closed | Completion date: April 4, 2016 | Permit id: 2016-102675-000 | |||||
Ti for first time tenant on 2nd floor - add interior walls for build out of new office Permit type: Planning and zoning | Permit status: Approved | Completion date: January 8, 2016 | Permit id: 2016-102675-000 | |||||
Ti for first time tenant on 2nd floor - add interior walls for build out of new office Permit type: Site development | Permit status: Not reqd | Completion date: January 12, 2016 | Permit id: 2016-102675-000 | |||||
Ti for first time tenant on 2nd floor - add interior walls for build out of new office Permit type: Life safety | Permit status: Approved | Completion date: March 15, 2016 | Permit id: 2016-102675-000 | |||||
Ti for first time tenant on 2nd floor - add interior walls for build out of new office Permit type: Structural | Permit status: Not reqd | Completion date: January 15, 2016 | Permit id: 2016-102675-000 | |||||
Ti for first time tenant on 2nd floor - add interior walls for build out of new office Permit type: Fire bureau | Permit status: Approved | Completion date: March 29, 2016 | Permit id: 2016-102675-000 | |||||
Ti for first time tenant on 2nd floor - add interior walls for build out of new office Permit type: Environmental services | Permit status: Approved | Completion date: January 26, 2016 | Permit id: 2016-102675-000 | |||||
Ti for first time tenant on 2nd floor - add interior walls for build out of new office Permit type: Environmental services | Permit status: Approved | Completion date: January 27, 2016 | Permit id: 2016-102675-000 | |||||
Ti for first time tenant on 2nd floor - add interior walls for build out of new office Permit type: Transportation | Permit status: Approved | Completion date: January 20, 2016 | Permit id: 2016-102675-000 | |||||
Ti for first time tenant on 2nd floor - add interior walls for build out of new office Permit type: Transportation | Permit status: Approved | Completion date: January 21, 2016 | Permit id: 2016-102675-000 | |||||
Ti for first time tenant on 2nd floor - add interior walls for build out of new office Permit type: Water bureau review | Permit status: Not reqd | Completion date: January 21, 2016 | Permit id: 2016-102675-000 | |||||
Ti for first time tenant on 2nd floor - add interior walls for build out of new office Permit type: Parks bureau | Permit status: Approved | Completion date: January 25, 2016 | Permit id: 2016-102675-000 | |||||
Ti for first time tenant on 2nd floor - add interior walls for build out of new office Permit type: Issuance | Permit status: Approved | Completion date: April 4, 2016 | Permit id: 2016-102675-000 | |||||
New 31,5 sf mixed-use building with retail space on the first floor, and an expected mix of creative office uses on the upper floors. Work includes 3-stories of wood glulam post and beam construction over a 1-story concrete podium, with ground floor retail, parking, lobby and building services Date: September 11, 2015Client: Southeast Uplift Neighborhood Program | Permit type: New construction | Permit status: Final | Completion date: December 27, 2016 | Current use: Business | Permit id: 2015-162340-000 | |||||
Ti for first time tenant on 2nd floor - add interior walls for build out of new office Date: May 17, 2016Client: Southeast Uplift Neighborhood Program | Permit type: Alteration | Permit status: Final | Completion date: December 27, 2016 | Current use: Business | Permit id: 2016-102675-000 | |||||
Tenant improvement for first time tenant on 3rd and 4th floors. New partition walls to create offices, break rooms, conference rooms. New auditorium seating. Date: September 8, 2016Client: Southeast Uplift Neighborhood Program | Permit type: Alteration | Permit status: Under inspection | Current use: Business | Permit id: 2016-166382-000 | |||||
Tenant improvement for first time office tenant on east side of 2nd floor, includes open office area, lounge, new entry and break room area Date: July 8, 2016Client: Southeast Uplift Neighborhood Program | Permit type: Alteration | Permit status: Under inspection | Current use: Business | Permit id: 2016-187560-000 |