ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Driveway for minor development Client: Driveway For Minor Develo | Permit type: Planning level i | Permit status: Issued | Current use: Development | Permit id: 07-03696 | Parcel: 920898 | |||||
July 26, 2007 4:09:01 pm kneel driveway permit only. Permit being issued on property in buncombe county but the drive attaches to a city street.; 1. Driveway apron shall be constructed of asphalt. 2 . Inspector must be called 48 hours prior to the in stallation of the driveway access apron for an inspection of the forms or prepared area. 3. Driveway apron must extend a minimum of 10? From edge of roa d. If sidewalk is present driveway apron must extend 10? Pas t sidewalk, this 10? Section may be concrete or asphalt. 4. D riveways that serve multi-family or commercial units must be built in accordance with one of the following desi gns, (1) 8? - 40 psi concrete on 100% compacted 8? Comp acted cabc stone, or (2) 2? ? Type 11 asphalt on 2? Bind er course on 6? 100% compacted cabc stone. If the road way has curb & gutter and or sidewalk the driveway apron must be concrete. 5. Inspector for this project is linda kaye and she can be r eached at redacted phone number (office) or redacted phone nu Permit type: Planning level i | Permit status: Issued | Permit id: 07-03696 | Parcel: 920898 | |||||
Driveway for minor development Date: October 4, 2007Client: Driveway For Minor Develo | Permit type: Planning level i | Permit status: Issued | Current use: Development | Permit id: 07-03696 | Parcel: 920898 | |||||
July 26, 2007 4:09:01 pm kneel driveway permit only. Permit being issued on property in buncombe county but the drive attaches to a city street.; 1. Driveway apron shall be constructed of asphalt. 2 . Inspector must be called 48 hours prior to the in stallation of the driveway access apron for an inspection of the forms or prepared area. 3. Driveway apron must extend a minimum of 10? From edge of roa d. If sidewalk is present driveway apron must extend 10? Pas t sidewalk, this 10? Section may be concrete or asphalt. 4. D riveways that serve multi-family or commercial units must be built in accordance with one of the following desi gns, (1) 8? - 40 psi concrete on 100% compacted 8? Comp acted cabc stone, or (2) 2? ? Type 11 asphalt on 2? Bind er course on 6? 100% compacted cabc stone. If the road way has curb & gutter and or sidewalk the driveway apron must be concrete. 5. Inspector for this project is linda kaye and she can be r eached at redacted phone number (office) or redacted phone nu Date: October 4, 2007Permit type: Planning level i | Permit status: Issued | Permit id: 07-03696 | Parcel: 920898 |