(2) heat pumps 15 kva and kva Date: July 28, 2008Permit type: Electrical permit | Permit status: Issued | Current use: Single family dwelling | Permit id: 491680 | |||||
20kw/83. 5 amp generator Date: February 8, 2013Permit type: Electrical permit | Permit status: Finaled | Current use: Single family dwelling | Permit id: 625506 | |||||
Mechanical permit Date: September 9, 2008Permit status: Issued | Current use: Single family dwelling | Permit id: 495240 | |||||
Addition 8 sq ft, interior alteration & demo 15 sq ft Date: June 5, 2008 Value: $45,000Permit type: Building residential permit | Permit status: Issued | Current use: Single family dwelling | Permit id: 485905 | |||||
On kerry lane(house #8120)replace overhead wire and associated equipment to provide 4 amp underground service in accordance with pepco plan no. 3267939. Complete repair (restoration of right of way) shall be made of any and all damages done to the existing improvements in the public right of way caused by construction operations on this site. Pre-construction meeting requiredcontact mcdps inspector christopher cary at 301-370-3686 before and after installation. Date: January 21, 2009Permit type: Public right of way | Permit status: Finaled | Current use: Public utility | Permit id: 260484 | |||||
Abandongas service in accordance with washington gas plan no. 635908. Work shall comply with montgomery county specifications for utility construction permit, the direction of the dps inspector and in accordance with the public right-of-way accessibility guidelines (prowag). A mill and overlay shall be required should the patch not meet the specifications as set forth by the current county specifications for utility construction permit and as directed by the dps row inspector. All lane closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. Permittee must check and coordinate with mcdot paving project schedule and have preconstruction meeting with dps row inspector prior to beginning of construction work. Date: November 23, 2015Permit type: Public right of way | Permit status: Issued | Current use: Public utility | Permit id: 349713 | |||||
Replacegas service in accordance with washington gas plan no. 635298. Work shall comply with montgomery county specifications for utility construction permit, the direction of the dps inspector and in accordance with the public right-of-way accessibility guidelines (prowag). A mill and overlay shall be required should the patch not meet the specifications as set forth by the current county specifications for utility construction permit and as directed by the dps row inspector. All lane closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. Permittee must check and coordinate with mcdot paving project schedule and have preconstruction meeting with dps row inspector prior to beginning of construction work. Date: December 7, 2015Permit type: Public right of way | Permit status: Issued | Current use: Public utility | Permit id: 350488 |