ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Please do not request inspections under this permit until 2 business days after permit issuance. Date: April 23, 2014Permit type: Electrical permit | Permit status: Finaled | Completion date: July 3, 2014 | Current use: Single family dwelling | Permit id: 670362 | |||||
Mechanical permit Date: April 28, 2014Permit status: Finaled | Completion date: July 3, 2014 | Current use: Single family dwelling | Permit id: 670899 | |||||
Add story above existing space to include new bd and bth Date: April 2, 2014 Value: $60,250Permit type: Building residential | Permit status: Stop work | Completion date: July 3, 2014 | Current use: Single family dwelling | Permit id: 666435 | |||||
Electrical permit Date: June 15, 2011Permit status: Finaled | Current use: Single family dwelling | Permit id: 571298 | |||||
Mechanical permit Date: August 29, 2006Permit status: Issued | Current use: Single family dwelling | Permit id: 431706 | |||||
Kitchen renovation Date: May 12, 2011 Value: $6,600Permit type: Building residential permit | Permit status: Finaled | Current use: Single family dwelling | Permit id: 568157 | |||||
Curb cut for private drainage installone (1)private drain connection within the county right of way. Private drainge pipes shall be cominedinto one (1) within property. Curb face will be saw cut to acceptone (1)maximum 4 diameter pvc drainage pipe. Concrete epoxy non? Shrink grout will be used to patch the cut curb face. Complete repair (restoration of right of way) shall be made of any and all damages done to the existing improvements in the public right of way caused by construction operations on this site. Work shall be complete as directed by the dps row inspector. (maryland dnr permit is required prior to remove/impact street trees. Complete tree protection and replanting per mc dps approved tree protection plan.) Date: October 7, 2014Permit type: Public right of way | Permit status: Completed | Current use: Public right-of-way | Permit id: 323926 |