| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
SCORE 95 [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] 9. 98kw pv system on roof. Upgrade service panel to 200a. 12 01 16 jk approved plans. 12 01 16 jle add 200a service Date: November 17, 2016 Contractor: Sme Inc Of SeattlePermit type: Electrical | Permit status: Permit closed | Completion date: December 15, 2016 | Expiration date: November 17, 2017 | Current use: Single family / duplex | Permit id: 6567620 |