Building Permits at 802 Malcolm Dr Silver Spring, MD 20901


Estimated Price

Beds

Baths

Rooms

Sq.Ft.

Built:   Lot size:   Taxed:
RENOVATION HISTORY
Based on the information received from building department, associated with 802 Malcolm Dr Silver Spring, MD 20901 over the past .

If you are considering hiring for your home renovation project, we recommend using our bidding system to get competitive quotes.

ACTIVITY



PERMITS VALUATION



RENOVATIONS
Find out the best time of the year to complete your project on a minimal budget.
Get several free quotes from best contractors in your area.

REQUEST A QUOTE
Explore CheckPermit
Our dataset includes 30 milion building permits across 4 million addresses in US.

We analyzed and ranked over 1 million home remodeling contractors based on official government sources.

Every contractor's rank is calculated based on official government records.
RECENT PROJECTS


Content Date Cost Contractor Rank Address Contractor
Customer wants to use eplans interior work only,install (11) solar panels mounted flush to roof
Date:  March 2, 2016
Value:   $5,863

Permit type: Building residential permit | Permit status: Finaled | Current use: Single family dwelling | Permit id: 742487
2016/03/02586395802 Malcolm Dr Silver Spring, Md 20901
Please do not request inspections under this permit until 2 business days after permit issuance.
Date:  March 8, 2016

Permit type: Electrical permit | Permit status: Finaled | Current use: Single family dwelling | Permit id: 747328
2016/03/08095802 Malcolm Dr Silver Spring, Md 20901
Replacegas service in accordance with washington gas plan no. 615819. Work shall comply with montgomery county specifications for utility construction permit, the direction of the dps inspector and in accordance with the public right-of-way accessibility guidelines (prowag). A mill and overlay shall be required should the patch not meet the specifications as set forth by the current county specifications for utility construction permit and as directed by the dps row inspector. All lane closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. Permittee must check and coordinate with mcdot paving project schedule and have preconstruction meeting with dps row inspector prior to beginning of construction work.
Date:  October 22, 2015

Permit type: Public right of way | Permit status: Issued | Current use: Public utility | Permit id: 348274
2015/10/22095802 Malcolm Dr Silver Spring, Md 20901
BEST LOCAL CONTRACTORS




Contractor Rank Contractor Details Number of Projects Avg. Project Cost Years in Business Photos
Need a Contractor ?
Just fill out a form below and get several free quotes from best local contractors in your area.