| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Rebuild Date: September 11, 2008Permit type: Demolition or move p | Permit status: Finaled | Completion date: October 21, 2008 | Current use: Single family dwelling | Permit id: 492697 | |||||
Heavy up only Date: June 26, 2008Permit type: Electrical permit | Permit status: Finaled | Completion date: June 30, 2008 | Current use: Single family dwelling | Permit id: 489000 | |||||
Electrical permit Date: July 31, 2008Permit status: Finaled | Completion date: October 14, 2008 | Current use: Single family dwelling | Permit id: 492032 | |||||
Rebuild Date: September 11, 2008 Value: $800,000Permit type: Building residential permit | Permit status: Finaled | Current use: Single family dwelling | Permit id: 492691 | |||||
On aberdeen rd (house #8015)replace poles,transformer, dig and backfill trench, build conduit, install cable and associated equipment to provide 4 amp underground service in accordance with pepco plan no. 3266717. Complete repair (restoration of right of way) shall be made of any and all damages done to the existing improvements in the public right of way caused by construction operations on this site. Pre-construction meeting requiredcontact mcdps inspector ralph wolfe at 301-370-3692 before and after installation. Date: November 21, 2008Permit type: Public right of way | Permit status: Finaled | Current use: Public utility | Permit id: 260109 | |||||
Driveway and house drainage permit construct driveway in accordance with montgomery county standards and specifications per mc dot-301. 05 and the direction of the dps inspector. Install a roof/sump pump drain within the county right of way. Curb face will be saw cut to accept a maximum 4" diameter pvc drainage pipe. Concrete epoxy non shrink grout will be used to patch the cut curb face and above the drainpipe. Roof/sump pump drain will be connected into the county storm drain structure or pipe if directed by the dps inspector. Complete repair (restoration of right of way) shall be made of any and all damages done to the existing improvements in the public right of way caused by construction operations on this site. Construction crews shall not drive/park vehicles over curbs, sidewalks or grassy areas. All future maintenance of this apron will be the responsibility of the property owner. A permit from state of maryland forest, park and wildlife services is required for tree removal an Date: September 11, 2008Permit type: Public right of way | Permit status: Completed | Current use: Driveway | Permit id: 258826 |