| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Continue to use as a cafe - change of operator Date: December 30, 2014Permit id: Use2014-01283 | |||||
(use)portion of the 2nd fl of the building for cafe. Date: September 15, 2010Permit id: Use2010-03493 | |||||
( use ) out patient rehab center- office space and therapy facilities Date: March 30, 2009Permit id: Use2009-00958 | |||||
Bonding and wiring of fountain fixtures and pumps. Ckts fixtures/devices and 15 sq. Ft conduits only. Date: October 24, 2008 Value: $25,000Permit id: Com2008-28798 | |||||
Install new 4 x 4 pole and meter socket to relocate temporary service to construction trailers. Trailers are already installed and have an existing service. This service has to be relocated to make way for the new construction on the site as per code. (bg Date: October 8, 2008 Value: $1,000Permit id: Com2008-27308 | |||||
Amend permit com2006-22977 issued on 01/22/07 with plans #2006-1225 to add the following additional work: add (25) audio/video low voltage devices as per code. Original permit description:(com2006-22977)construction of a new six story outpatient center a Date: September 30, 2008 Value: $10,000Permit id: Com2008-26462 | |||||
Fire alarm permit for com2006-22977 Date: June 26, 2008 Value: $60,000Permit id: Com2008-13044 | |||||
Install new wet and dry sprinkler systems per approved plans and specifications. Separate permit is required for electrical installation and wiring of fire pump Date: November 21, 2007 Value: $286,690Permit id: Com2007-31049 | |||||
Amend permit com2006-22977 issued on 01/22/07 with plans#2006-1225 to add contractors as listed aboveoriginal permit description:(com2006-22977)construction of a new six story outpatient center and rehab center including site work as per plansand code. S Date: August 7, 2007Permit id: Com2007-24504 | |||||
Construction of a new six story outpatient center and rehab center including site work as per plansand code. Separate fire alarm permit required. Date: January 22, 2007 Value: $24,400,950Permit id: Com2006-22977 | |||||
Install temporay construction service 4 amp 480/277 volts. Date: September 23, 2002 Value: $16,900Permit id: Com2002-11797 | |||||
Temp for construction trailers (4) office trailers1 3/phase 120/208v from generator see permit # 04371 047991 1/phase 120/240v from existing panel on property Date: July 9, 2002 Value: $10,000Permit id: Com2002-06224 | |||||
Temp. Construction trailer for one year Date: June 19, 2002Permit id: Com2002-04799 | |||||
Managment trailer for demolition to construction for the new kennedy krieger institute 8 block project. Electrical and plumbing tie ins req for the trailer. Date: June 10, 2002Permit id: Com2002-04371 | |||||
Amend permit com2006-22977 issued on 01/22/07 with plans #2006-1225 to add the following additional work: add (25) audio/video low voltage devices as per code. Original permit description:(com2006-22977)construction of a new six story outpatient center and rehab center including site work as per plansand code. Separate fire alarm permit required. Date: September 30, 2008 Value: $10,000Expiration date: July 22, 2009 | Permit id: Com2008-26462 | |||||
Install new 4 x 4 pole and meter socket to relocate temporary service to construction trailers. Trailers are already installed and have an existing service. This service has to be relocated to make way for the new construction on the site as per code. (bge wms #1698390) Date: October 8, 2008 Value: $1,000Expiration date: April 8, 2009 | Permit id: Com2008-27308 | |||||
Amend permit com2006-22977 issued on 01/22/07 with plans#2006-1225 to add contractors as listed aboveoriginal permit description:(com2006-22977)construction of a new six story outpatient center and rehab center including site work as per plansand code. Separate fire alarm permit required. Date: August 7, 2007Expiration date: July 22, 2009 | Permit id: Com2007-24504 | |||||
Date: December 16, 2003 Value: $160,000Expiration date: June 16, 2004 | Permit id: Dem2003-01105 | |||||
Install temporary water service to temp. Construction office ( see permit # com2002-04371) contractor - james baarron mu 004 Date: October 30, 2002 Value: $1,500Expiration date: April 30, 2003 | Permit id: Com2002-14706 | |||||
Use temporary use premises for no more than 6 months for an open off street parking lot on 11 seperate lots lots 6 7 8 9 11 12 13 14 15 16 limited to 218 parking spaces upon three parcels verified via a correspondence from office of coucilman young Date: December 6, 2002Permit id: Com2002-16722 | |||||
Amend permit#com2002-04799 issued on 6-19-02 with expiration date of 6-19-03 to extend to 7-2-04 Date: July 2, 2003Expiration date: July 2, 2004 | Permit id: Com2003-31647 | |||||
Install three (3) illuminate signs and logos sign 1 north elevation. To read kennedy krieger institute sign 1 size is 123 1"x56" total 677 sq. Ft. Sign 2 north elevation logo logo size is 8x46" total 26 sq. Ft.. Sign 3 west elevation to read kennedy krieger institute bhr and logo size 388"x116" total 445 sq. Ft. North linear footage 283 west linear footage 178 Date: April 12, 2004 Value: $20,000Expiration date: September 12, 2004 | Permit id: Com2004-07037 | |||||
Construct 8 story office building with full basement connecting bridge to existing parking garage adjacent as per plans as per code. Date: March 1, 2017 Value: $38,700,000Expiration date: March 1, 2020 | Permit id: Com2016-25816 | |||||
Amend permit: add contractor .(original permit:com2016-25816:construct 8 story office building with full basement connecting bridge to existing parking garage adjacent as per plans as per code.)original permit description:(com2016-25816)construct 8 story office building with full basement connecting bridge to existing parking garage adjacent as per plans as per code. Date: March 2, 2017Expiration date: March 1, 2020 | Permit id: Com2017-04869 | |||||
Amend permit: add contractor . Extend original permit.(original permit:com2016-25816:construct 8 story office building with full basement connecting bridge to existing parking garage adjacent as per plans as per code.)original permit description:(com2016-25816)construct 8 story office building with full basement connecting bridge to existing parking garage adjacent as per plans as per code. Date: March 7, 2017Expiration date: March 1, 2020 | Permit id: Com2017-51278 | |||||
Install a new wet pipe sprinkler system to a new medical office building per nfpa13 as per plans as per code. Date: May 10, 2017 Value: $330,000Expiration date: May 10, 2018 | Permit id: Com2017-05553 | |||||
Grading permit only as per plans as per code. Date: January 5, 2017 Value: $1,750,000Expiration date: January 5, 2019 | Permit id: Com2016-24177 | |||||
Install fire alarm system in kki outpatient building as pre plans as per code. Date: September 13, 2017 Value: $221,280Expiration date: March 13, 2018 | Permit id: Com2017-13439 | |||||
Amend plan num:2016-22 permit com2016-25816 issued 3 1 17basement life safety) add gas booster pump room (first floor life safety plan) egress thru lobby from stair 1 relocate gas service delayed egress at door into stair 2step down from stair 2 to grade (second floor life safety plan) delayed egress at door into stair 2 (third floor life safety plan)delayed egress at door into stair 2 (fourth floor life safety plan) delayed egress at door into stair 2rearrange interior offices (eighth floor life safety plan) provide egress door in operable partition (roof level life safety plan) rearrange stair 1 roof level landing as per plans as per code. Date: October 5, 2017 Value: $70,000Expiration date: October 5, 2018 | Permit id: Com2017-13873 | |||||
Install (214) # low voltage as per code. Date: October 20, 2017 Value: $66,625Expiration date: April 18, 2018 | Permit id: Com2017-64542 | |||||
Install temporay construction service 4 amp 480 277 volts. Date: September 23, 2002 Value: $16,900Expiration date: March 23, 2003 | Permit id: Com2002-11797 | |||||
Amend permit com2006-22977 issued on 01 22 07 with plans#2006-1225 to add contractors as listed aboveoriginal permit description:(com2006-22977)construction of a new six story outpatient center and rehab center including site work as per plansand code. Separate fire alarm permit required. Date: August 7, 2007Expiration date: July 22, 2009 | Permit id: Com2007-24504 | |||||
Amend permit com2006-22977 issued on 01 22 07 with plans #2006-1225 to add the following additional work: add (25) audio video low voltage devices as per code. Original permit description:(com2006-22977)construction of a new six story outpatient center and rehab center including site work as per plansand code. Separate fire alarm permit required. Date: September 30, 2008 Value: $10,000Expiration date: July 22, 2009 | Permit id: Com2008-26462 | |||||
Bonding and wiring of fountain fixtures and pumps. Ckts fixtures devices and 15 sq. Ft conduits only. Date: October 24, 2008 Value: $25,000Expiration date: April 24, 2009 | Permit id: Com2008-28798 | |||||
Temp for construction trailers (4) office trailers1 3 phase 120 208v from generator see permit # 04371 047991 1 phase 120 240v from existing panel on property Date: July 9, 2002 Value: $10,000Expiration date: January 9, 2003 | Permit id: Com2002-06224 |