(use) use portion of premises k/a unit 1 as a single-family dwelling. Date: January 15, 2015Permit id: Use2015-00120 | |||||
Tie in hood and pollution control unit to the sprinkler system as per plans and as per code. Date: December 5, 2014 Value: $6,795Permit id: Com2014-31493 | |||||
Use 1st floor of premises as a restaurant with accesory outdoor seating. Date: December 3, 2014Permit id: Use2014-05608 | |||||
Use 2nd floor as a community room and guest suite only Date: November 25, 2014Permit id: Use2014-05479 | |||||
Add 11 sprinklers and relocate 46 sprinklers. As per plans and as per code. Date: November 24, 2014 Value: $10,930Permit id: Com2014-20774 | |||||
Original permit description:(com2014-10519)tenant fit out for a restaurant in an existing building as per plans and as per code. Separate permit will be required for sprinkler system and fire alaram. Date: October 21, 2014Permit id: Com2014-31245 | |||||
Tenant fit out for a restaurant in an existing building as per plans and as per code. Separate permit will be required for sprinkler system and fire alaram. Date: September 12, 2014 Value: $190,000Permit id: Com2014-10519 | |||||
Relocate 27 fire sprinkler heads as per code. Date: August 27, 2014 Value: $5,500Permit id: Com2014-18031 | |||||
Relocate forty-two (42) add eight (8) fire sprinkler heads in a light hazard occupancy as per code. Ste 100 Date: January 7, 2014 Value: $10,000Permit id: Com2014-00293 | |||||
(use) contnue to use portion of premises commercial unit # 2 as a a spa and salon.(change of operator) Date: February 19, 2013Permit id: Use2013-00206 | |||||
Request for time extension onpermit#com2005-167 issue on 12-5-06 with original completion date of 12-5-09. Original permit description:(com2005-16720)construction of a condominium residence in 4 & 6 story buildings over a 412 /- parking spaces single- Date: October 22, 2010Permit id: Com2010-23728 | |||||
Amend permit # com2005-167 issued on 12-05-06 with plans # 2005-783 to add prime contractor as listed above. Original permit description:(com2005-16720)construction of a condominium residence in 4 & 6 story buildings over a 412 /- parking spaces sing Date: June 10, 2010Permit id: Com2010-12525 | |||||
Request for time extension on permit com2005-167 issued on 12/05/06 with original completion date of 05/05/ also change electrician plumber gas fitter and hvac contractors as listed above. Original permit description:(com2005-16720)construction of Date: May 4, 2010Permit id: Com2010-09418 | |||||
Amend permit#com2005-167 issued on 12-5-06 with plans#2005-7 to add electrical contractor aslisted above. Original permit description:(com2005-16720)construction of a condominium residence in 4 & 6 story buildings over a 412 /- parking spaces single Date: March 9, 2010Permit id: Com2010-04372 | |||||
Request for time extension onpermit#com2005-167 issued on 12-5-06 with original completion date of 12-5-09. Amend permit#com2005-167 issued on 12-5-06 to change prime contractor aslisted above. Original permit description:(com2005-16720)construction of Date: November 5, 2009Permit id: Com2009-25885 | |||||
Use lower level below buildings 1 thru 5 as a 412 space parking garage Date: March 19, 2009Permit id: Use2009-00057 | |||||
(use) building no 3 on 1st floor accesory use for screening activities as private theatre for the building residents only Date: January 7, 2009Permit id: Use2008-05696 | |||||
(use)the portion of the premises commercial space #3 biulding no 6for dock masters suiteany exterior work or signage will require separate permits. Date: November 20, 2008Permit id: Use2008-05030 | |||||
(use)portion of the premises building no 2 :residential unit owners geust rooms three rooms Date: November 20, 2008Permit id: Use2008-05031 | |||||
(use)portion of premises building no 6 for private marina Date: October 30, 2008Permit id: Use2008-05028 | |||||
(use) the portion pf the premises building # 3 for indoor swimming pool and locker room Date: October 30, 2008Permit id: Use2008-05029 | |||||
Amend permit# com2005-167 issued on 12/5/06 with plans# 2005-7 to add the following additional work:change two meters into one meter for condo unit. As per code. Original permit description:(com2005-16720)construction of a condominium residence in 4 & Date: October 8, 2008 Value: $8,000Permit id: Com2008-27256 | |||||
Use base of building (new condo bldg) as common areas corridors lobby residence lounge game room and board room Date: July 18, 2008Permit id: Use2008-03148 | |||||
(use) use portion of premises commercial unit # 2 as a a spa and salon. Date: July 15, 2008Permit id: Use2008-02636 | |||||
Original permit description:(com2007-06651)tenant improvement for commerical condominium # 2 spa & salon ritz carlton residences building as per plan. Separate permit will be required for sprinkler and fire alarm system. C/o required on separate form. Date: May 7, 2008Permit id: Com2008-12938 | |||||
Install (8) heat and glo 60 gl ipi direct vent (fire place) and complete co axle flue system with pvk power vent termination in building #1 5th floorl t t11 t15 t16 6th floor p x 2 p11 p 15 Date: May 1, 2008 Value: $25,000Permit id: Com2008-11993 | |||||
Amend permit#com2005-167 issued on 12-5-06 with plans#2005-783 to add the following additional work: add 48 low voltage devices to condo unit no. 331 in building no. 3 on the third floor as per code. Original permit description:(com2005-16720)constructio Date: April 28, 2008 Value: $8,000Permit id: Com2008-11787 | |||||
Revisions and admendment to existing sprinkler permit as per code as per plans. Reference #com2005-167 as per plan as per code. Plan #2006-1972. Date: April 4, 2008 Value: $40,000Permit id: Com2008-03069 | |||||
Request for time extension on permit com2007-04506 issued on 9/14/07 with original completion date of 3/14/08original permit description:(com2007-04506)install telephone and cable tv wiring 192 low voltage. As per code. Date: March 24, 2008Permit id: Com2008-07859 | |||||
Install heat n glo 60 gl ipi direct vent and complete co-axle flue system with pvr power vent ermination in bldg #3. 5th floor; p p31a p31b p33 p35 p36 p38. 6th floo; t t33 t35 t36. As per code. Date: March 20, 2008 Value: $35,110Permit id: Com2008-07617 | |||||
Amend permit # com2007-01483 issued on 2/13/07 with plans # 2007-45 to add the following additional work: for review by lt. John carr/ fire marshall. Date: February 11, 2008Permit id: Com2007-26749 | |||||
Install heat n glo infinity air assisted direct vert partial mechanical with slim line co-axle venting (residential lounge) building #3. Install heat n glo sthvbipi see thru direct vent with manufacture co-axles vent system thru roof line building #2 ( Date: December 11, 2007 Value: $12,000Permit id: Com2007-37533 | |||||
Install heat n glo manufactured direct vent & complete co-axle flue systems with pvk- power vent termination kits. 5th floor t63 t64 t65; 6th floor p62 p63 p64 p65 as per code. Date: December 11, 2007 Value: $23,100Permit id: Com2007-37547 | |||||
Amend permit #com2007-27897 issued 9/7/07 to add the following additonal work: add 4 amp service. Original permit description:(com2007-27897)request for time extension on permit #com2007-06651 issued on 3/28/07 with original/amended completion date of Date: November 13, 2007 Value: $5,000Permit id: Com2007-34920 | |||||
Install heat and glo manufactured direct vents and complete co-axle systems with pvk power vent termination kit. 5th floor units t t51 t53 t56 t58 t59 t t70. 6th floor units p p51 p52 p54 p57 p58 p59 p and p70. Building # 5. Date: October 17, 2007 Value: $26,000Permit id: Com2007-32155 | |||||
Install 78 new sprinklers in light hazard spa. Maximum spacing 225 sq ft as per plans asper code. Date: September 25, 2007 Value: $5,800Permit id: Com2007-24086 | |||||
Amend permit# com2005-167 issued on 12/5/06 to add low voltage contractor listed above. Original permit description:(com2005-16720)construction of a condominium residence in 4 & 6 story buildings over a 412 /- parking spaces single-level below grade p Date: September 21, 2007Permit id: Com2007-29465 | |||||
Request for time extension on permit#com2007-04506 issued on 2-12-07 with original completion date of 8-12-07. Original permit description:(com2007-04506)install telephone and cable tv wiring 192 low voltage. As per code. Date: September 14, 2007Permit id: Com2007-28707 | |||||
Low voltage 108 devices. As per code. Date: September 13, 2007 Value: $22,000Permit id: Com2007-28561 | |||||
Request for time extension on permit #com2007-06651 issued on 3/28/07 with original/amended completion date of 9/23/07. Original permit description:(com2007-06651)tenant improvement for commerical condominium # 2 spa & salon ritz carlton residences buil Date: September 7, 2007Permit id: Com2007-27897 | |||||
Low voltage wiring only including: unit 25512 speakers6 volume14 keypads18 switch controls1 lighting control panel3 tv asper code. Date: September 5, 2007 Value: $4,000Permit id: Com2007-27618 | |||||
Alteration for tenant fit out base building by others to include pull stations smoke detectors stoves horn strobes heat detector as per plans and code. Date: August 29, 2007 Value: $12,000Permit id: Com2007-22342 | |||||
Install heat and glo manufactured direct vent and complete co-axle flue system with pvic power vent termination cap units 5th floor t62 t63 t64 t65 6th floor p62 p63 p64 p 65 as per code Date: July 9, 2007 Value: $24,000Permit id: Com2007-21414 | |||||
Amend permit com2005-167 issued on 12/05/06 with plans#2005-783 to add the following additional work: low voltage wiring as per codeoriginal permit description:(com2005-16720)construction of a condominium residence in 4 & 6 story buildings over a 412 Date: June 18, 2007 Value: $80,000Permit id: Com2007-19155 | |||||
Amend permit# com2007-06651 issued 3/27/07 with plans# 2007-288 to add contractors listed above. Original permit description:(com2007-06651)tenant improvement for commerical condominium # 2 spa & salon ritz carlton residences building as per plan. Separ Date: June 8, 2007Permit id: Com2007-18097 | |||||
Connect electrical service to bldg one service se-a 2500a 208-120v. Install (39) new meters from bge transformer #20-057 to meters 1 111 1 121 2 211 3 311 312 313 314 315 316 3 321 324 4 411 412 413 414 415 416 4 421 Date: May 24, 2007 Value: $450,000Permit id: Com2007-16379 | |||||
Connect electrical service to building 5 & 6 service se-y 3000a 480-277v. Install (2) meters from bge transformer #20-053 to 801c key hwy public service and 851 key hwy marina. Temporary service. As per code. Date: May 24, 2007 Value: $100,000Permit id: Com2007-16380 | |||||
Connect electrical service to building (6) service se-d 1200a 120-208v. Install (23) meters from bge transformer #20-052 to 162 163 831 key hwy dock master office 262 263 264 361 362 363 364 365 461 462 463 464 t-62 t-63 t64 t65 p62 p Date: May 24, 2007 Value: $350,000Permit id: Com2007-16382 | |||||
Connect electrical service to building (5) service se-c 3000a 208-120v. Install (75) meters from bge transformer #20-054 to 141 142 151 152 153 154 155 156 157 241 242 243 244 2 251 252 253 254 255 256 257 258 2 341 342 343 Date: May 24, 2007 Value: $575,000Permit id: Com2007-16383 | |||||
Connect electrical service to buildings 1 & 3 services sex-1 sex-2 30 a 480-277. Install (4) meters from bge transformer #20-056 to 801a key hwy public service 801b key hwy public service 821 key hwy spa 751 key hwy restaurant. Temp service only. Date: May 24, 2007 Value: $250,000Permit id: Com2007-16375 | |||||
Connect electrical service to building (3) service se-b 3000a 208-120v. Install (54) meters from bge transformer #20-055 to 122 1 131 132 133 1 222 2 231 232 233 234 235 236 239 2 245 322 3 323 331 332 333 334 335 335 Date: May 24, 2007 Value: $525,000Permit id: Com2007-16377 | |||||
Bonding 3 water display fountains per attached sketch wire 3 water display fountains. As per code Date: May 9, 2007 Value: $2,500Permit id: Com2007-14561 | |||||
Install 511 low voltage devices. Work as per code. Date: April 24, 2007 Value: $517,000Permit id: Com2007-12696 | |||||
Furnish & install 23 hydraulic elevators as per plan as per code. Date: April 12, 2007 Value: $3,255,000Permit id: Com2007-04790 | |||||
Tenant improvement for commerical condominium # 2 spa & salon ritz carlton residences building as per plan. Separate permit will be required for sprinkler and fire alarm system. C/o required on separate form. Date: March 27, 2007 Value: $860,000Permit id: Com2007-06651 | |||||
Construction of 1 indoor swimming pool and spa as per plans and per code. 50x20ft pool 9x9 spa on 1st floor Date: March 13, 2007 Value: $73,762Permit id: Com2007-01041 | |||||
Fire alarm drawings for review. As per plans and per code. Date: February 13, 2007 Value: $300,000Permit id: Com2007-01483 | |||||
Install telephone and cable tv wiring 192 low voltage. As per code. Date: February 12, 2007 Value: $100,000Permit id: Com2007-04506 | |||||
Install new nfpa 13 and sprinkler system in new condominium building as per code and plans. Date: February 5, 2007 Value: $1,500,000Permit id: Com2006-39205 | |||||
Construction of a condominium residence in 4 & 6 story buildings over a 412 /- parking spaces single-level below grade parking garage marina office with a 22 slip marina 1 3 l. F public promenade and public pier in compliance with the approved site Date: December 5, 2006 Value: $82,500,000Permit id: Com2005-16720 | |||||
Partial permits subject to all conditions of agreement for a complete buildings exterior envelope including the metal stud perimeter wall framing system (including wall and roof sheathing); building air and moisture barrier exterior windows and doors Date: October 4, 2006 Value: $2,600,000Permit id: Com2006-30723 | |||||
Install underground slab conduits Date: June 2, 2006 Value: $100,000Permit id: Com2006-16851 | |||||
"temp service; install2. 5"" pvc duct bank from manhole to bge switch install 2. 5"" duct bank from bge switch to bge transformer nstall 8. 4"" pvc duct bank from bge transformer to a 3000amp switch board line up with 6 ckt breakers. As per code. Bldg permit c" Date: April 19, 2006Permit id: Com2006-12294 | |||||
Partial permits subject to all conditions of agreement on file for structural framing including columns beams slabs and shafts for the ritz-carlton residences. Pending action on application for plan (# 2005-783) the issuance of the general permit an Date: March 31, 2006 Value: $2,450,000Permit id: Com2006-09621 | |||||
Amend permit# com2004-21374(plans# 2004-1100) issued 12/15/04 to reconfigure bridge and make some site changes as per plans. Date: March 31, 2006Permit id: Com2006-04244 | |||||
Partial permits subject to all conditions of agreement to construct underground utilities piles & pile caps french drains sump pits for storm & groundwater garage slab and perimeter garage walls and related underground conduit and foundations. Pendi Date: November 10, 2005 Value: $2,750,000Permit id: Com2005-34454 | |||||
Temporary office trailer for 6 months. Total 14 sq. Ft Date: May 10, 2005Permit id: Com2005-11773 | |||||
Install 2-1 amp feeders to new office trailer 2 ckts Date: April 13, 2005 Value: $5,000Permit id: Com2005-09755 | |||||
Construct and backfill approx 1377 linear feet of replacement bulkhead construct a concrete pedestrian bridge and access for emergency vehicles to promenade (bridge 100x24 wide). Construct approx 15 7 sq ft concrete pier/platform within the baltimore Date: December 15, 2004 Value: $6,818,075Permit id: Com2004-21374 | |||||
Furnish electrical work to install 1-4 amp service for temporary construction service 6 ckts install and wire 8 10 w flood lights on utility poles. Date: September 10, 2004 Value: $13,000Permit id: Com2004-22467 | |||||
Amend permit # 162508 issued 3/9/01 to extend completion date to 8/03 Date: August 28, 2002Permit id: Com2002-09888 | |||||
Amend permit#com2005-167 issued on 12-5-06 with plans#2005-7 to add electrical contractor aslisted above. Original permit description:(com2005-16720)construction of a condominium residence in 4 & 6 story buildings over a 412 +/- parking spaces single-level below grade parking garage marina office with a 22 slip marina 1 3 l. F public promenade and public pier in compliance with the approved site plan and p. U. D. Separate permit will be required for sprinkler system fire alaram and elevators. Per pud # 108 ordinance # 01-278 approved by the mayor and city council on 12/19 /01 and minor pud amendment and design approval of the planning commission of 10/6/05 c/o required on a seperate form upon completion Date: March 9, 2010Expiration date: May 5, 2010 | Permit id: Com2010-04372 | |||||
Request for time extension onpermit#com2005-167 issue on 12-5-06 with original completion date of 12-5-09. Original permit description:(com2005-16720)construction of a condominium residence in 4 & 6 story buildings over a 412 +/- parking spaces single-level below grade parking garage marina office with a 22 slip marina 1 3 l. F public promenade and public pier in compliance with the approved site plan and p. U. D. Separate permit will be required for sprinkler system fire alaram and elevators. Per pud # 108 ordinance # 01-278 approved by the mayor and city council on 12/19 /01 and minor pud amendment and design approval of the planning commission of 10/6/05 c/o required on a seperate form upon completion Date: October 22, 2010Expiration date: April 22, 2011 | Permit id: Com2010-23728 | |||||
Request for time extension onpermit#com2005-167 issued on 12-5-06 with original completion date of 12-5-09. Amend permit#com2005-167 issued on 12-5-06 to change prime contractor aslisted above. Original permit description:(com2005-16720)construction of a condominium residence in 4 & 6 story buildings over a 412 +/- parking spaces single-level below grade parking garage marina office with a 22 slip marina 1 3 l. F public promenade and public pier in compliance with the approved site plan and p. U. D. Separate permit will be required for sprinkler system fire alaram and elevators. Per pud # 108 ordinance # 01-278 approved by the mayor and city council on 12/19 /01 and minor pud amendment and design approval of the planning commission of 10/6/05 c/o required on a seperate form upon completion Date: November 5, 2009Expiration date: May 5, 2010 | Permit id: Com2009-25885 | |||||
Request for time extension on permit com2005-167 issued on 12/05/06 with original completion date of 05/05/ also change electrician plumber gas fitter and hvac contractors as listed above. Original permit description:(com2005-16720)construction of a condominium residence in 4 & 6 story buildings over a 412 +/- parking spaces single-level below grade parking garage marina office with a 22 slip marina 1 3 l. F public promenade and public pier in compliance with the approved site plan and p. U. D. Separate permit will be required for sprinkler system fire alaram and elevators. Per pud # 108 ordinance # 01-278 approved by the mayor and city council on 12/19 /01 and minor pud amendment and design approval of the planning commission of 10/6/05 c/o required on a seperate form upon completion Date: May 4, 2010Expiration date: November 4, 2010 | Permit id: Com2010-09418 | |||||
Amend permit#com2005-167 issued on 12-5-06 with plans#2005-783 to add the following additional work: add 48 low voltage devices to condo unit no. 331 in building no. 3 on the third floor as per code. Original permit description:(com2005-16720)construction of a condominium residence in 4 & 6 story buildings over a 412 +/- parking spaces single-level below grade parking garage marina office with a 22 slip marina 1 3 l. F public promenade and public pier in compliance with the approved site plan and p. U. D. Separate permit will be required for sprinkler system fire alaram and elevators. Per pud # 108 ordinance # 01-278 approved by the mayor and city council on 12/19 /01 and minor pud amendment and design approval of the planning commission of 10/6/05 c/o required on a seperate form upon completion Date: April 28, 2008 Value: $8,000Expiration date: December 5, 2009 | Permit id: Com2008-11787 | |||||
Amend permit# com2005-167 issued on 12/5/06 with plans# 2005-7 to add the following additional work:change two meters into one meter for condo unit. As per code. Original permit description:(com2005-16720)construction of a condominium residence in 4 & 6 story buildings over a 412 +/- parking spaces single-level below grade parking garage marina office with a 22 slip marina 1 3 l. F public promenade and public pier in compliance with the approved site plan and p. U. D. Separate permit will be required for sprinkler system fire alaram and elevators. Per pud # 108 ordinance # 01-278 approved by the mayor and city council on 12/19 /01 and minor pud amendment and design approval of the planning commission of 10/6/05 c/o required on a seperate form upon completion Date: October 8, 2008 Value: $8,000Expiration date: December 5, 2009 | Permit id: Com2008-27256 | |||||
Amend permit # com2005-167 issued on 12-05-06 with plans # 2005-783 to add prime contractor as listed above. Original permit description:(com2005-16720)construction of a condominium residence in 4 & 6 story buildings over a 412 +/- parking spaces single-level below grade parking garage marina office with a 22 slip marina 1 3 l. F public promenade and public pier in compliance with the approved site plan and p. U. D. Separate permit will be required for sprinkler system fire alaram and elevators. Per pud # 108 ordinance # 01-278 approved by the mayor and city council on 12/19 /01 and minor pud amendment and design approval of the planning commission of 10/6/05 c/o required on a seperate form upon completion Date: June 10, 2010Expiration date: November 4, 2010 | Permit id: Com2010-12525 | |||||
Partial permits subject to all conditions of agreement for a complete buildings exterior envelope including the metal stud perimeter wall framing system (including wall and roof sheathing); building air and moisture barrier exterior windows and doors artitectural precast concrete panels; roofing systems (including simulated shingles hot and/or cold applied membrane or hot-fluid applied roofing and waterproofing for roof and decks; brick cast stone and simulated stone masonry units; eifs and /or prefinished metal corinice and pediment/fascia system installation. Pending action on application for plan (# 2005-783) the issuance of the general permit and the understanding that the engineer/architect will comply with the baltimore city building fire and related code-2003. Date: October 4, 2006 Value: $2,600,000Expiration date: August 30, 2008 | Permit id: Com2006-30723 | |||||
Connect electrical service to buildings 1 & 3 services sex-1 sex-2 30 a 480-277. Install (4) meters from bge transformer #20-056 to 801a key hwy public service 801b key hwy public service 821 key hwy spa 751 key hwy restaurant. Temp service only. As per code. Date: May 24, 2007 Value: $250,000Expiration date: November 24, 2007 | Permit id: Com2007-16375 | |||||
Connect electrical service to building (3) service se-b 3000a 208-120v. Install (54) meters from bge transformer #20-055 to 122 1 131 132 133 1 222 2 231 232 233 234 235 236 239 2 245 322 3 323 331 332 333 334 335 335 339 3 345 422 4 423 431 432 433 434 435 436 439 4 445 t t31 t36 t32 t33 t35 t37 p p31 p36 p37 p33 p35. Temporary service only. As per code. Date: May 24, 2007 Value: $525,000Expiration date: November 24, 2007 | Permit id: Com2007-16377 | |||||
Connect electrical service to bldg one service se-a 2500a 208-120v. Install (39) new meters from bge transformer #20-057 to meters 1 111 1 121 2 211 3 311 312 313 314 315 316 3 321 324 4 411 412 413 414 415 416 4 421 424 t11 t12 t13 t15 t16 t17 p11 p12 p17 p13 p15 2 221. Temporary service. As per code. Date: May 24, 2007 Value: $450,000Expiration date: November 24, 2007 | Permit id: Com2007-16379 | |||||
Connect electrical service to building (6) service se-d 1200a 120-208v. Install (23) meters from bge transformer #20-052 to 162 163 831 key hwy dock master office 262 263 264 361 362 363 364 365 461 462 463 464 t-62 t-63 t64 t65 p62 p63 p64 p65. Temporary service. As per code. Date: May 24, 2007 Value: $350,000Expiration date: November 24, 2007 | Permit id: Com2007-16382 | |||||
Connect electrical service to building (5) service se-c 3000a 208-120v. Install (75) meters from bge transformer #20-054 to 141 142 151 152 153 154 155 156 157 241 242 243 244 2 251 252 253 254 255 256 257 258 2 341 342 343 344 344 3 351 352 353 354 355 356 357 358 359 3 441 442 443 444 4 4 451 452 453 454 455 456 4 457 458 459 t51 t52 t53 t t54 t t55 t58 t56 t59 t57 t p51 p52 p p p p54 p57 p58 p59. Temporary service as per code. Date: May 24, 2007 Value: $575,000Expiration date: November 24, 2007 | Permit id: Com2007-16383 | |||||
Amend permit# com2007-06651 issued 3/27/07 with plans# 2007-288 to add contractors listed above. Original permit description:(com2007-06651)tenant improvement for commerical condominium # 2 spa & salon ritz carlton residences building as per plan. Separate permit will be required for sprinkler and fire alarm system. C/o required on separate form. Date: June 8, 2007Expiration date: September 23, 2007 | Permit id: Com2007-18097 | |||||
Amend permit com2005-167 issued on 12/05/06 with plans#2005-783 to add the following additional work: low voltage wiring as per codeoriginal permit description:(com2005-16720)construction of a condominium residence in 4 & 6 story buildings over a 412 +/- parking spaces single-level below grade parking garage marina office with a 22 slip marina 1 3 l. F public promenade and public pier in compliance with the approved site plan and p. U. D. Separate permit will be required for sprinkler system fire alaram and elevators. Per pud # 108 ordinance # 01-278 approved by the mayor and city council on 12/19 /01 and minor pud amendment and design approval of the planning commission of 10/6/05 c/o required on a seperate form upon completion Date: June 18, 2007 Value: $80,000Expiration date: December 5, 2009 | Permit id: Com2007-19155 | |||||
Request for time extension on permit #com2007-06651 issued on 3/28/07 with original/amended completion date of 9/23/07. Original permit description:(com2007-06651)tenant improvement for commerical condominium # 2 spa & salon ritz carlton residences building as per plan. Separate permit will be required for sprinkler and fire alarm system. C/o required on separate form. Date: September 7, 2007Expiration date: March 7, 2008 | Permit id: Com2007-27897 | |||||
Amend permit# com2005-167 issued on 12/5/06 to add low voltage contractor listed above. Original permit description:(com2005-16720)construction of a condominium residence in 4 & 6 story buildings over a 412 +/- parking spaces single-level below grade parking garage marina office with a 22 slip marina 1 3 l. F public promenade and public pier in compliance with the approved site plan and p. U. D. Separate permit will be required for sprinkler system fire alaram and elevators. Per pud # 108 ordinance # 01-278 approved by the mayor and city council on 12/19 /01 and minor pud amendment and design approval of the planning commission of 10/6/05 c/o required on a seperate form upon completion Date: September 21, 2007Expiration date: December 5, 2009 | Permit id: Com2007-29465 | |||||
Amend permit #com2007-27897 issued 9/7/07 to add the following additonal work: add 4 amp service. Original permit description:(com2007-27897)request for time extension on permit #com2007-06651 issued on 3/28/07 with original/amended completion date of 9/23/07. Original permit description:(com2007-06651)tenant improvement for commerical condominium # 2 spa & salon ritz carlton residences building as per plan. Separate permit will be required for sprinkler and fire alarm system. C/o required on separate form. Date: November 13, 2007 Value: $5,000Expiration date: May 13, 2008 | Permit id: Com2007-34920 | |||||
Install heat n glo infinity air assisted direct vert partial mechanical with slim line co-axle venting (residential lounge) building #3. Install heat n glo sthvbipi see thru direct vent with manufacture co-axles vent system thru roof line building #2 (game room). Install hear n glo 8000trdipi 42 direct vent with manufactured co-axle vent system (partial mechanical) building #5 lobby as per code." Date: December 11, 2007 Value: $12,000Expiration date: June 11, 2008 | Permit id: Com2007-37533 | |||||
Amend permit #162508 issued 3/9/01 to extend completion date to 8/28/04 Date: August 11, 2003Expiration date: February 11, 2004 | Permit id: Com2003-34308 | |||||
Tank removal; remove 1-1200gal ust #2 heating oil tank back fill to grade Date: March 25, 2004 Value: $3,650Expiration date: September 25, 2004 | Permit id: Com2004-06550 | |||||
Install and supply temporary generator power for a one day event 3 generators in use 1-for stand by. Date: May 19, 2004 Value: $5,000Expiration date: November 19, 2004 | Permit id: Com2004-11916 | |||||
Install x 1 tent for private party for one day event 5/19/04 separate permit require for electrc connnect Date: May 14, 2004Expiration date: May 19, 2004 | Permit id: Com2004-11637 | |||||
Construct and backfill approx 1377 linear feet of replacement bulkhead construct a concrete pedestrian bridge and access for emergency vehicles to promenade (bridge 100x24 wide). Construct approx 15 7 sq ft concrete pier/platform within the baltimore inner harbor waters to service a 20 wide promenade and landscaping. Replace and realign the existing storm drawn to a new outfall at the southeast corner of the project site. Date: December 15, 2004 Value: $6,818,075Expiration date: December 15, 2006 | Permit id: Com2004-21374 | |||||
Construction of a condominium residence in 4 & 6 story buildings over a 412 +/- parking spaces single-level below grade parking garage marina office with a 22 slip marina 1 3 l. F public promenade and public pier in compliance with the approved site plan and p. U. D. Separate permit will be required for sprinkler system fire alaram and elevators. Per pud # 108 ordinance # 01-278 approved by the mayor and city council on 12/19 /01 and minor pud amendment and design approval of the planning commission of 10/6/05 c/o required on a seperate form upon completion Date: December 5, 2006 Value: $82,500,000Expiration date: December 5, 2009 | Permit id: Com2005-16720 | |||||
Partial permits subject to all conditions of agreement to construct underground utilities piles & pile caps french drains sump pits for storm & groundwater garage slab and perimeter garage walls and related underground conduit and foundations. Pending action on application for plan (# 2005-783) the issuance of the general permit and the understanding that the engineer/architect will comply with the baltimore city building fire and related code-2003. Date: November 10, 2005 Value: $2,750,000Expiration date: November 10, 2008 | Permit id: Com2005-34454 | |||||
Partial permits subject to all conditions of agreement on file for structural framing including columns beams slabs and shafts for the ritz-carlton residences. Pending action on application for plan (# 2005-783) the issuance of the general permit and the understanding that the engineer/architect will comply with the baltimore city building fire and related code-2003. Date: March 31, 2006 Value: $2,450,000Expiration date: March 31, 2007 | Permit id: Com2006-09621 | |||||
Temp service; install2. 5" pvc duct bank from manhole to bge switch install 2. 5" duct bank from bge switch to bge transformer nstall 8. 4" pvc duct bank from bge transformer to a 3000amp switch board line up with 6 ckt breakers. As per code. Bldg permit com2005-34454 Date: April 19, 2006Expiration date: October 19, 2006 | Permit id: Com2006-12294 | |||||
Install heat n glo infinity air assisted direct vert partial mechanical with slim line co-axle venting (residential lounge) building #3. Install heat n glo sthvbipi see thru direct vent with manufacture co-axles vent system thru roof line building #2 (game room). Install hear n glo 8000trdipi 42" direct vent with manufactured co-axle vent system (partial mechanical) building #5 lobby as per code. Date: December 11, 2007 Value: $12,000Expiration date: June 11, 2008 | Permit id: Com2007-37533 | |||||
Category1: interior work: 50 sq ft: complete demolition of non structural elements to include drywall. Wood paneling doors faux brick bath stalls counter tops. Demo only separate permit will be required for tenant fit out as per code. Date: September 15, 2016 Value: $5,000Expiration date: March 15, 2017 | Permit id: Com2016-23732 | |||||
(use) use portion of premises k a unit 1 as a single-family dwelling. Date: January 15, 2015Permit id: Use2015-00120 | |||||
Tenant improvement for commerical condominium # 2 spa & salon ritz carlton residences building as per plan. Separate permit will be required for sprinkler and fire alarm system. C o required on separate form. Date: March 27, 2007 Value: $860,000Expiration date: September 23, 2007 | Permit id: Com2007-06651 | |||||
Amend permit# com2007-06651 issued 3 27 07 with plans# 2007-288 to add contractors listed above. Original permit description:(com2007-06651)tenant improvement for commerical condominium # 2 spa & salon ritz carlton residences building as per plan. Separate permit will be required for sprinkler and fire alarm system. C o required on separate form. Date: June 8, 2007Expiration date: September 23, 2007 | Permit id: Com2007-18097 | |||||
Amend permit com2005-167 issued on 12 05 06 with plans#2005-783 to add the following additional work: low voltage wiring as per codeoriginal permit description:(com2005-16720)construction of a condominium residence in 4 & 6 story buildings over a 412 + - parking spaces single-level below grade parking garage marina office with a 22 slip marina 1 3 l. F public promenade and public pier in compliance with the approved site plan and p. U. D. Separate permit will be required for sprinkler system fire alaram and elevators. Per pud # 108 ordinance # 01-278 approved by the mayor and city council on 12 19 01 and minor pud amendment and design approval of the planning commission of 10 6 05 c o required on a seperate form upon completion Date: June 18, 2007 Value: $80,000Expiration date: December 5, 2009 | Permit id: Com2007-19155 | |||||
Amend permit # com2007-01483 issued on 2 13 07 with plans # 2007-45 to add the following additional work: for review by lt. John carr fire marshall. Date: February 11, 2008Expiration date: August 11, 2008 | Permit id: Com2007-26749 | |||||
Request for time extension on permit #com2007-06651 issued on 3 28 07 with original amended completion date of 9 23 07. Original permit description:(com2007-06651)tenant improvement for commerical condominium # 2 spa & salon ritz carlton residences building as per plan. Separate permit will be required for sprinkler and fire alarm system. C o required on separate form. Date: September 7, 2007Expiration date: March 7, 2008 | Permit id: Com2007-27897 | |||||
Amend permit# com2005-167 issued on 12 5 06 to add low voltage contractor listed above. Original permit description:(com2005-16720)construction of a condominium residence in 4 & 6 story buildings over a 412 + - parking spaces single-level below grade parking garage marina office with a 22 slip marina 1 3 l. F public promenade and public pier in compliance with the approved site plan and p. U. D. Separate permit will be required for sprinkler system fire alaram and elevators. Per pud # 108 ordinance # 01-278 approved by the mayor and city council on 12 19 01 and minor pud amendment and design approval of the planning commission of 10 6 05 c o required on a seperate form upon completion Date: September 21, 2007Expiration date: December 5, 2009 | Permit id: Com2007-29465 | |||||
Amend permit #com2007-27897 issued 9 7 07 to add the following additonal work: add 4 amp service. Original permit description:(com2007-27897)request for time extension on permit #com2007-06651 issued on 3 28 07 with original amended completion date of 9 23 07. Original permit description:(com2007-06651)tenant improvement for commerical condominium # 2 spa & salon ritz carlton residences building as per plan. Separate permit will be required for sprinkler and fire alarm system. C o required on separate form. Date: November 13, 2007 Value: $5,000Expiration date: May 13, 2008 | Permit id: Com2007-34920 | |||||
Request for time extension on permit com2007-04506 issued on 9 14 07 with original completion date of 3 14 08original permit description:(com2007-04506)install telephone and cable tv wiring 192 low voltage. As per code. Date: March 24, 2008Expiration date: September 24, 2008 | Permit id: Com2008-07859 | |||||
Amend permit#com2005-167 issued on 12-5-06 with plans#2005-783 to add the following additional work: add 48 low voltage devices to condo unit no. 331 in building no. 3 on the third floor as per code. Original permit description:(com2005-16720)construction of a condominium residence in 4 & 6 story buildings over a 412 + - parking spaces single-level below grade parking garage marina office with a 22 slip marina 1 3 l. F public promenade and public pier in compliance with the approved site plan and p. U. D. Separate permit will be required for sprinkler system fire alaram and elevators. Per pud # 108 ordinance # 01-278 approved by the mayor and city council on 12 19 01 and minor pud amendment and design approval of the planning commission of 10 6 05 c o required on a seperate form upon completion Date: April 28, 2008 Value: $8,000Expiration date: December 5, 2009 | Permit id: Com2008-11787 | |||||
Amend permit# com2005-167 issued on 12 5 06 with plans# 2005-7 to add the following additional work:change two meters into one meter for condo unit. As per code. Original permit description:(com2005-16720)construction of a condominium residence in 4 & 6 story buildings over a 412 + - parking spaces single-level below grade parking garage marina office with a 22 slip marina 1 3 l. F public promenade and public pier in compliance with the approved site plan and p. U. D. Separate permit will be required for sprinkler system fire alaram and elevators. Per pud # 108 ordinance # 01-278 approved by the mayor and city council on 12 19 01 and minor pud amendment and design approval of the planning commission of 10 6 05 c o required on a seperate form upon completion Date: October 8, 2008 Value: $8,000Expiration date: December 5, 2009 | Permit id: Com2008-27256 | |||||
Construction of a condominium residence in 4 & 6 story buildings over a 412 + - parking spaces single-level below grade parking garage marina office with a 22 slip marina 1 3 l. F public promenade and public pier in compliance with the approved site plan and p. U. D. Separate permit will be required for sprinkler system fire alaram and elevators. Per pud # 108 ordinance # 01-278 approved by the mayor and city council on 12 19 01 and minor pud amendment and design approval of the planning commission of 10 6 05 c o required on a seperate form upon completion Date: December 5, 2006 Value: $82,500,000Expiration date: December 5, 2009 | Permit id: Com2005-16720 | |||||
Partial permits subject to all conditions of agreement to construct underground utilities piles & pile caps french drains sump pits for storm & groundwater garage slab and perimeter garage walls and related underground conduit and foundations. Pending action on application for plan (# 2005-783) the issuance of the general permit and the understanding that the engineer architect will comply with the baltimore city building fire and related code-2003. Date: November 10, 2005 Value: $2,750,000Expiration date: November 10, 2008 | Permit id: Com2005-34454 | |||||
Partial permits subject to all conditions of agreement on file for structural framing including columns beams slabs and shafts for the ritz-carlton residences. Pending action on application for plan (# 2005-783) the issuance of the general permit and the understanding that the engineer architect will comply with the baltimore city building fire and related code-2003. Date: March 31, 2006 Value: $2,450,000Expiration date: March 31, 2007 | Permit id: Com2006-09621 | |||||
Amend permit#com2005-167 issued on 12-5-06 with plans#2005-7 to add electrical contractor aslisted above. Original permit description:(com2005-16720)construction of a condominium residence in 4 & 6 story buildings over a 412 + - parking spaces single-level below grade parking garage marina office with a 22 slip marina 1 3 l. F public promenade and public pier in compliance with the approved site plan and p. U. D. Separate permit will be required for sprinkler system fire alaram and elevators. Per pud # 108 ordinance # 01-278 approved by the mayor and city council on 12 19 01 and minor pud amendment and design approval of the planning commission of 10 6 05 c o required on a seperate form upon completion Date: March 9, 2010Expiration date: May 5, 2010 | Permit id: Com2010-04372 | |||||
Original permit description:(com2007-06651)tenant improvement for commerical condominium # 2 spa & salon ritz carlton residences building as per plan. Separate permit will be required for sprinkler and fire alarm system. C o required on separate form. Date: May 7, 2008Expiration date: June 7, 2008 | Permit id: Com2008-12938 | |||||
Request for time extension on permit com2005-167 issued on 12 05 06 with original completion date of 05 05 also change electrician plumber gas fitter and hvac contractors as listed above. Original permit description:(com2005-16720)construction of a condominium residence in 4 & 6 story buildings over a 412 + - parking spaces single-level below grade parking garage marina office with a 22 slip marina 1 3 l. F public promenade and public pier in compliance with the approved site plan and p. U. D. Separate permit will be required for sprinkler system fire alaram and elevators. Per pud # 108 ordinance # 01-278 approved by the mayor and city council on 12 19 01 and minor pud amendment and design approval of the planning commission of 10 6 05 c o required on a seperate form upon completion Date: May 4, 2010Expiration date: November 4, 2010 | Permit id: Com2010-09418 | |||||
Partial permits subject to all conditions of agreement for a complete buildings exterior envelope including the metal stud perimeter wall framing system (including wall and roof sheathing); building air and moisture barrier exterior windows and doors artitectural precast concrete panels; roofing systems (including simulated shingles hot and or cold applied membrane or hot-fluid applied roofing and waterproofing for roof and decks; brick cast stone and simulated stone masonry units; eifs and or prefinished metal corinice and pediment fascia system installation. Pending action on application for plan (# 2005-783) the issuance of the general permit and the understanding that the engineer architect will comply with the baltimore city building fire and related code-2003. Date: October 4, 2006 Value: $2,600,000Expiration date: August 30, 2008 | Permit id: Com2006-30723 | |||||
Amend permit # com2005-167 issued on 12-05-06 with plans # 2005-783 to add prime contractor as listed above. Original permit description:(com2005-16720)construction of a condominium residence in 4 & 6 story buildings over a 412 + - parking spaces single-level below grade parking garage marina office with a 22 slip marina 1 3 l. F public promenade and public pier in compliance with the approved site plan and p. U. D. Separate permit will be required for sprinkler system fire alaram and elevators. Per pud # 108 ordinance # 01-278 approved by the mayor and city council on 12 19 01 and minor pud amendment and design approval of the planning commission of 10 6 05 c o required on a seperate form upon completion Date: June 10, 2010Expiration date: November 4, 2010 | Permit id: Com2010-12525 | |||||
Request for time extension onpermit#com2005-167 issue on 12-5-06 with original completion date of 12-5-09. Original permit description:(com2005-16720)construction of a condominium residence in 4 & 6 story buildings over a 412 + - parking spaces single-level below grade parking garage marina office with a 22 slip marina 1 3 l. F public promenade and public pier in compliance with the approved site plan and p. U. D. Separate permit will be required for sprinkler system fire alaram and elevators. Per pud # 108 ordinance # 01-278 approved by the mayor and city council on 12 19 01 and minor pud amendment and design approval of the planning commission of 10 6 05 c o required on a seperate form upon completion Date: October 22, 2010Expiration date: April 22, 2011 | Permit id: Com2010-23728 | |||||
Request for time extension onpermit#com2005-167 issued on 12-5-06 with original completion date of 12-5-09. Amend permit#com2005-167 issued on 12-5-06 to change prime contractor aslisted above. Original permit description:(com2005-16720)construction of a condominium residence in 4 & 6 story buildings over a 412 + - parking spaces single-level below grade parking garage marina office with a 22 slip marina 1 3 l. F public promenade and public pier in compliance with the approved site plan and p. U. D. Separate permit will be required for sprinkler system fire alaram and elevators. Per pud # 108 ordinance # 01-278 approved by the mayor and city council on 12 19 01 and minor pud amendment and design approval of the planning commission of 10 6 05 c o required on a seperate form upon completion Date: November 5, 2009Expiration date: May 5, 2010 | Permit id: Com2009-25885 | |||||
Amend permit # 162508 issued 3 9 01 to extend completion date to 8 03 Date: August 28, 2002Expiration date: August 28, 2003 | Permit id: Com2002-09888 | |||||
Amend permit #162508 issued 3 9 01 to extend completion date to 8 28 04 Date: August 11, 2003Expiration date: February 11, 2004 | Permit id: Com2003-34308 | |||||
Install x 1 tent for private party for one day event 5 19 04 separate permit require for electrc connnect Date: May 14, 2004Expiration date: May 19, 2004 | Permit id: Com2004-11637 | |||||
Construct and backfill approx 1377 linear feet of replacement bulkhead construct a concrete pedestrian bridge and access for emergency vehicles to promenade (bridge 100x24 wide). Construct approx 15 7 sq ft concrete pier platform within the baltimore inner harbor waters to service a 20 wide promenade and landscaping. Replace and realign the existing storm drawn to a new outfall at the southeast corner of the project site. Date: December 15, 2004 Value: $6,818,075Expiration date: December 15, 2006 | Permit id: Com2004-21374 | |||||
Amend permit# com2004-21374(plans# 2004-1100) issued 12 15 04 to reconfigure bridge and make some site changes as per plans. Date: March 31, 2006Expiration date: March 31, 2007 | Permit id: Com2006-04244 |