New service to be installed off woodmont ave (permit appl #709225) Permit type: Public right of way | Permit status: Open | Current use: Public utility | Permit id: 354889 | |||||
Temporary construction entrances (not for building permit release) construct temporary stabilized construction entrances. Proper precautions must be taken to keep the roadways free of mud, debris or other obstructions. Prior to release this permit, remove construction entrance. Complete repair (restoration of right of way including haul routes) shall be made of any and all damages done to the existing improvements in the public right of way caused by construction operations on this site. All lane and sidewalk closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. Work shall be complete as directed by the dps inspector and in accordance with the public right-of-way accessibility guidelines (prowag). (maryland dnr permit is required prior to remove/impact street trees. Complete tree protection and replanting per mc dps approved tree protection plan.) Permit type: Public right of way | Permit status: Open | Current use: Driveway | Permit id: 354205 | |||||
Abandongas service in accordance with washington gas plan no. 711167. Work shall comply with montgomery county specifications for utility construction permit, the direction of the dps inspector and in accordance with the public right-of-way accessibility guidelines (prowag). A mill and overlay shall be required should the patch not meet the specifications as set forth by the current county specifications for utility construction permit and as directed by the dps row inspector. All lane closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. Permittee must check and coordinate with mcdot paving project schedule and have preconstruction meeting with dps row inspector prior to beginning of construction work. Date: November 18, 2016Permit type: Public right of way | Permit status: Issued | Current use: Public utility | Permit id: 355187 |