ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Add- 2 story addition revision 08/03/15 making change to the footing and wall frames (fr) Date: August 3, 2015 Value: $900,000Permit type: Building residential permit | Permit status: Finaled | Current use: Single family dwelling | Permit id: 702064 | |||||
Dig and backfill outside of pavement; build conduit; install cable and associated equipment in accordance with pepco plan no. 3503467. Work shall comply with montgomery county specifications for utility construction permit, the direction of the dps inspector and in accordance with the public right-of-way accessibility guidelines (prowag). All lane closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. Permittee must check and coordinate with mcdot paving project schedule and have preconstruction meeting with dps row inspector prior to beginning of construction work. Under the pavement cut moratorium until 11/30/18. A full width 2 mill and overlayi Date: April 12, 2016Permit type: Public right of way | Permit status: Issued | Current use: Public utility | Permit id: 352059 | |||||
Rooftop unit Date: February 2, 2016Permit type: Mechanical permit | Permit status: Issued | Current use: Single family dwelling | Permit id: 743374 | |||||
Please do not request inspections under this permit until 2 business days after permit issuance. Date: December 29, 2015Permit type: Electrical permit | Permit status: Finaled | Current use: Single family dwelling | Permit id: 740479 | |||||
Dw permit (residential) & private drainage connection to row stormdrain structure construct mc-301. 01 type driveway in accordance with montgomery county standards and specifications. Install a private drainage connection within the county right of way. Concrete epoxy non? Shrink grout will be used to patch the drainpipe. Drain pipe will be connected into the county storm drain structure or pipe. Work shall be complete as directed by the dps row inspector and in accordance with the public right-of-way accessibility guidelines (prowag). Complete repair (restoration of right of way) shall be made of any and all damages done to existing improvements in the public right of way caused by construction operations on this site. All lane and sidewalk closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. (maryland Date: March 23, 2015Permit type: Public right of way | Permit status: Completed | Current use: Driveway | Permit id: 332232 | |||||
Bay window and interior alterations Date: October 28, 2009 Value: $82,600Permit type: Building residential permit | Permit status: Issued | Current use: Single family dwelling | Permit id: 524349 |