ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Ti for new tenant; complete interior remodel; removal of interior walls and adding new walls; replace existing interior stairs that lead to the mezzanine; add to existing mezzanine; cut out new skylights; remodel entrance Date: July 6, 2015Permit type: Application | Permit status: Approved | Completion date: November 14, 2014 | Permit id: 2014-237795-000 | |||||
75-ton ahu on mezz, one 12. 5-ton, one 6-ton and one 3-ton gas pack, 18,0 cfm refrigeration room, three 1. 5t ductless splits, battery charging exhaust, refrigeration, 12 type 1 hood w/fire wrap, plans w/co Date: July 6, 2015Permit type: Intake | Permit status: Closed | Completion date: November 19, 2014 | Permit id: 2014-237803-000 | |||||
Intake pw Permit status: Assigned | Completion date: April 22, 2015 | Permit id: 2015-112726-000 | |||||
Intake pw Permit status: Assigned | Completion date: February 4, 2015 | Permit id: 2015-112726-000 | |||||
Pre-design pw Permit status: Completed | Completion date: June 9, 2015 | Permit id: 2015-112726-000 | |||||
Pre-design pw Permit status: Not reqd | Completion date: February 17, 2015 | Permit id: 2015-112726-000 | |||||
Pre-design pw Permit status: Received | Completion date: January 30, 2015 | Permit id: 2015-112726-000 | |||||
Pre-design pw Permit status: Accepted for review | Completion date: February 17, 2015 | Permit id: 2015-112726-000 | |||||
Pre-design pw Permit status: Completed | Completion date: March 2, 2015 | Permit id: 2015-112726-000 | |||||
Pre-design pw Permit status: Billed | Completion date: April 29, 2015 | Permit id: 2015-112726-000 | |||||
Plan review pw Permit status: Approved | Completion date: May 7, 2015 | Permit id: 2015-112726-000 | |||||
Plan review pw Permit status: Appr w/corr | Completion date: July 1, 2015 | Permit id: 2015-112726-000 | |||||
Bond/insurance pw Permit status: Approved | Completion date: May 5, 2015 | Permit id: 2015-112726-000 | |||||
Pre-issuance pw Permit status: Not reqd | Completion date: February 17, 2015 | Permit id: 2015-112726-000 | |||||
Pre-issuance pw Permit status: Completed | Completion date: March 24, 2015 | Permit id: 2015-112726-000 | |||||
Lucs Permit type: Land use review | Permit status: Letter sent | Completion date: February 26, 2015 | Permit id: 2015-119385-000 | |||||
Sed-sump systemspw permit / set fee Permit type: Intake -we | Permit status: Closed | Completion date: February 17, 2015 | Permit id: 2015-120150-000 | |||||
Sed-sump systemspw permit / set fee Permit type: Plan review -we | Permit status: Open | Completion date: February 25, 2015 | Permit id: 2015-120150-000 | |||||
Sed-sump systemspw permit / set fee Permit type: Plan review -we | Permit status: Closed | Completion date: June 11, 2015 | Permit id: 2015-120150-000 | |||||
Sed-sump systemspw permit / set fee Permit type: Plan review -we | Permit status: Closed | Completion date: March 13, 2015 | Permit id: 2015-120150-000 | |||||
Approval of adjustments to 33. 130. 225 landscaped areas, to allow the site to have 14. 4% of the site in landscaping; and 33. 266. 130. G. 3 interior landscaping, to allow the site to have approximately 27. 4 square feet of interior parking lot landscaping per parking space, per the approved site plans, exhibits c. 7 through c. 10, signed and dated february 10, 2015, subject to the following conditions:a. As part of the building permit application submittal, each of the 4 required site plans and any additional drawings must reflect the information and design approved by this land use review as indicated in exhibits c. 1-c. 2. The sheets on which this information appears must be labeled, proposal and design as approved in case file # lu 13-234476 ad. B. When the existing cherry laurel (english laurel) trees and existing otto luyken laurel shrubs die, they must be replaced with shrubs that are not on portlands nuisance plants list. Date: February 27, 2014Permit type: Land use review | Permit status: Completed | Completion date: December 9, 2013 | Permit id: 2013-234476-000 | |||||
Low voltage burglar alarm for lotos 400402616 Date: June 9, 2014Permit type: Electrical inspections | Permit status: Approved | Completion date: July 30, 2014 | Permit id: 2014-167130-000 | |||||
Buildout of tenant space for winco foods Date: September 1, 2015Permit type: Intake | Permit status: Closed | Completion date: July 28, 2015 | Permit id: 2015-208416-000 | |||||
Ti for new tenant - no change of occupancy-new walls and doors to create office and storage room - furring out walls in showroom Date: August 5, 2015Permit type: Application | Permit status: Approved | Completion date: August 5, 2015 | Permit id: 2015-212224-000 | |||||
Change of occupancy from a-2 occupancy (restaurant) to b (beauty school). Ti for new tenant; remove walls and add new walls to create hair classrooms, new restroom, new offices, storage room, utility room, and hair station area Date: November 18, 2015Permit type: Application | Permit status: Approved | Completion date: August 10, 2015 | Permit id: 2015-214676-000 | |||||
Value added revision to revise permit to not divide wax room, divide the southeast corner into one offfice instead of two, reconfigure hall and central classroom layout, relocate hair stations and receptionist areas, relocate nail stations and increase from 2 stations to 5 stations, add a room for waxing, and relocate washer/dryer room. Date: December 21, 2015Permit type: Application | Permit status: Approved | Completion date: November 24, 2015 | Permit id: 2015-214676-Rev | |||||
Sprinkler-relocate four existing sprinklers due to added wall assembley Date: August 25, 2015Permit type: Intake | Permit status: Approved | Completion date: August 25, 2015 | Permit id: 2015-225123-000 | |||||
All new plumbing. (183) total fixtures. Reviewed main co description w/ applicant. Date: September 4, 2015Permit type: Intake | Permit status: Closed | Completion date: September 4, 2015 | Permit id: 2015-231841-000 | |||||
Gas piping for new fixtures Date: September 4, 2015Permit type: Intake | Permit status: Approved | Completion date: September 4, 2015 | Permit id: 2015-231861-000 | |||||
Refrigeration system, refrigeration sensors and exhaust by others, structural details attached Date: September 17, 2015Permit type: Intake | Permit status: Approved | Completion date: September 10, 2015 | Permit id: 2015-234068-000 | |||||
Alarm-install new fire system for ti Date: September 28, 2015Permit type: Intake | Permit status: Approved | Completion date: September 11, 2015 | Permit id: 2015-235005-000 | |||||
New illuminated flush mounted sign on the east elevation Date: September 11, 2015Permit type: Intake | Permit status: Closed | Completion date: September 11, 2015 | Permit id: 2015-235229-000 | |||||
Install (2) sign lighting circuits Date: September 11, 2015Permit type: Intake | Permit status: Closed | Completion date: September 11, 2015 | Permit id: 2015-235234-000 | |||||
9/30/15 - received complaint - construction beginning daily before 6 am. Permit type: Request | Permit status: Closed | Completion date: September 30, 2015 | Permit id: 2015-244120-000 | |||||
9/30/15 - received complaint - construction beginning daily before 6 am. Permit type: Request | Permit status: Closed | Completion date: March 22, 2016 | Permit id: 2015-244120-000 | |||||
Altering 5 circuits Date: October 8, 2015Permit type: Electrical inspections | Permit status: Approved | Completion date: December 4, 2015 | Permit id: 2015-248051-000 | |||||
Sprinkler - remodel fire sprinkler system for new tenant Date: October 27, 2015Permit type: Intake | Permit status: Approved | Completion date: October 8, 2015 | Permit id: 2015-248091-000 | |||||
Complaint received. Lack of buffer zone. Please see trackit for additional information Permit type: Request | Permit status: Closed | Completion date: December 23, 2015 | Permit id: 2015-248508-000 | |||||
Construction - concrete pours inside building Date: October 15, 2015Permit type: Intake | Permit status: Complete | Completion date: October 15, 2015 | Permit id: 2015-251605-000 | |||||
Hazardous/tank - install diesel fuel tank for fire pump Date: March 7, 2016Permit type: Intake | Permit status: Approved | Completion date: October 27, 2015 | Permit id: 2015-253280-000 | |||||
Install storm drain connection to swales/ added 2 l. F. Water service 01/19/16 Date: October 23, 2015Permit type: Intake | Permit status: Closed | Completion date: October 23, 2015 | Permit id: 2015-255359-000 | |||||
New 23. 94 s. F. Illuminated fascia sign (mounted to existing canopy), southeast elevation Date: January 29, 2016Permit type: Intake | Permit status: Closed | Completion date: November 24, 2015 | Permit id: 2015-269290-000 | |||||
(1) circuit for wall sign Date: November 24, 2015Permit type: Intake | Permit status: Closed | Completion date: November 24, 2015 | Permit id: 2015-269298-000 | |||||
Tenant improvement Date: November 29, 2015Permit type: Electrical inspections | Permit status: Approved | Completion date: January 29, 2016 | Permit id: 2015-270409-000 | |||||
Install hrv system for new tenant and reheat coil. Date: January 15, 2016Permit type: Intake | Permit status: Closed | Completion date: December 21, 2015 | Permit id: 2015-279619-000 | |||||
Plumbing for new salon, (16) fixtures/ add (1) water heater 01/29/16 Date: December 22, 2015Permit type: Intake | Permit status: Closed | Completion date: December 22, 2015 | Permit id: 2015-280471-000 | |||||
Fixed-installation of an ansul r-102 4. 5 gallon fire system into an exhaust hood Date: January 5, 2016Permit type: Intake | Permit status: Approved | Completion date: December 30, 2015 | Permit id: 2015-283043-000 | |||||
Complaint received. Lights of back side of business shine into bedroom windows caok w/call Date: March 16, 2016Permit type: Request | Permit status: Closed | Completion date: March 14, 2016 | Permit id: 2016-106178-000 | |||||
3 circuits for 2 rooftop unit reconnects and service plug Date: January 27, 2016Permit type: Electrical inspections | Permit status: Approved | Completion date: February 22, 2016 | Permit id: 2016-111711-000 | |||||
Replace 2 rtus disconnect/reconnect gas pipe. One 6t with economizer. One 3t with economizer. Existing unit weight within 5% of exsiting. Date: January 27, 2016Permit type: Intake | Permit status: Closed | Completion date: January 27, 2016 | Permit id: 2016-111907-000 | |||||
Low volt wiring and t-stat for suite 7901d Date: January 29, 2016Permit type: Electrical inspections | Permit status: Approved | Completion date: February 22, 2016 | Permit id: 2016-113500-000 | |||||
Install dryer vent Date: February 1, 2016Permit type: Intake | Permit status: Closed | Completion date: February 1, 2016 | Permit id: 2016-114023-000 | |||||
San: 107 lf of 8csp main in se 79th ave. Approx depth 11 contractor to install 6 x 8 tee into 8 main and prepare 6 branch to property per std p-262. Contractor to verify all depths and connections in field. X37869 Date: February 4, 2016Permit type: Intake | Permit status: Closed | Completion date: February 4, 2016 | Permit id: 2016-116355-000 | |||||
99 feet sanitary sewer on property Date: February 4, 2016Permit type: Intake | Permit status: Closed | Completion date: February 4, 2016 | Permit id: 2016-116364-000 | |||||
Tenant improvement for new restaurant tenant, remove existing wall and restroom, build out for new tenant, includes utility room, walk in cooler and freezer, kitchen/food prep area, all plumbing equipment, restroom and lobby Date: April 18, 2016Permit type: Application | Permit status: Approved | Completion date: February 12, 2016 | Permit id: 2016-120746-000 | |||||
Hvac for new restaurant tenant. Two 5 t ahus. Type 1 hood w/ef & sf. 2psig gas system. Plans w/16-120746-co. Date: April 18, 2016Permit type: Intake | Permit status: Closed | Completion date: February 12, 2016 | Permit id: 2016-120750-000 | |||||
Zoning confirmation request. Permit type: Land use review | Permit status: Closed | Completion date: February 25, 2016 | Permit id: 2016-126260-000 | |||||
Zoning confirmation request. Permit type: Land use review | Permit status: Letter sent | Completion date: March 1, 2016 | Permit id: 2016-126260-000 | |||||
Construction - asphalt paving Date: March 18, 2016Permit type: Intake | Permit status: Complete | Completion date: March 15, 2016 | Permit id: 2016-135693-000 | |||||
Add, relocate and plug fire sprinkler heads as required for ti Permit type: Intake | Permit status: Approved | Completion date: April 11, 2016 | Permit id: 2016-148602-000 | |||||
Add, relocate and plug fire sprinkler heads as required for ti Permit type: Intake | Permit status: Closed | Completion date: April 8, 2016 | Permit id: 2016-148602-000 | |||||
Parking lot improvements, install new trench drain at rear, parking islands, new swales and landscaping, no change to accessible stalls and install bike parking racks (this permit is for the nonconforming upgrades required by 2014-237795 co) - lu 13-234476 ad. Date: May 5, 2015Permit type: Application | Permit status: Approved | Completion date: November 7, 2014 | Permit id: 2014-235499-000 | |||||
Value added revision to add 6 tall masonary wall northwest corner of property; approximately 1 long Date: October 23, 2015Permit type: Application | Permit status: Approved | Completion date: October 14, 2015 | Permit id: 2014-235499-Rev | |||||
Dfs for pallet racking Date: January 6, 2016Permit type: Application | Permit status: Approved | Completion date: December 14, 2015 | Permit id: 2014-237795-Dfs | |||||
Revision to add row of gondola; shift and revise layout of coffin cases; minor adjustments to reflect existing column locations; Date: December 8, 2015Permit type: Application | Permit status: Approved | Completion date: October 12, 2015 | Permit id: 2014-237795-Rev | |||||
Value added revision to change name of room to fire pump room; relocation of roof drain piping, add guardrail detail, shelving updates (under 6), add info for seismic and box beam bracing and fuel tank detail Date: April 20, 2016Permit type: Application | Permit status: Approved | Completion date: April 20, 2016 | Permit id: 2014-237795-Rev | |||||
Intake pw Date: February 16, 2016Permit status: Assigned | Completion date: April 22, 2015 | Permit id: 2015-112726-000 | |||||
Sed-sump systemspw permit / set fee Date: February 16, 2016Permit type: Intake -we | Permit status: Closed | Completion date: February 17, 2015 | Permit id: 2015-120150-000 | |||||
Value added revision to revise permit to not divide wax room, divide the southeast corner into one offfice instead of two, reconfigure hall and central classroom layout, relocate hair stations and receptionist areas, relocate nail stations and increase from 2 stations to 5 stations, add a room for waxing, and relocate washer dryer room. Date: December 21, 2015Permit type: Application | Permit status: Approved | Completion date: November 24, 2015 | Permit id: 2015-214676-Rev | |||||
All new plumbing. (183) total fixtures. Reviewed main co description w applicant. Date: September 4, 2015Permit type: Intake | Permit status: Closed | Completion date: September 4, 2015 | Permit id: 2015-231841-000 | |||||
9 30 15 - received complaint - construction beginning daily before 6 am. Permit type: Request | Permit status: Closed | Completion date: September 30, 2015 | Permit id: 2015-244120-000 | |||||
9 30 15 - received complaint - construction beginning daily before 6 am. Permit type: Request | Permit status: Closed | Completion date: March 22, 2016 | Permit id: 2015-244120-000 | |||||
Complaint received. Lack of buffer zone. Please see trackit for additional information Permit type: Request | Permit status: Closed | Completion date: December 23, 2015 | Permit id: 2015-248508-000 | |||||
Hazardous tank - install diesel fuel tank for fire pump Date: March 7, 2016Permit type: Intake | Permit status: Approved | Completion date: October 27, 2015 | Permit id: 2015-253280-000 | |||||
Install storm drain connection to swales added 2 l. F. Water service 01 19 16 Date: October 23, 2015Permit type: Intake | Permit status: Closed | Completion date: October 23, 2015 | Permit id: 2015-255359-000 | |||||
Plumbing for new salon, (16) fixtures add (1) water heater 01 29 16 Date: December 22, 2015Permit type: Intake | Permit status: Closed | Completion date: December 22, 2015 | Permit id: 2015-280471-000 | |||||
Complaint received. Lights of back side of business shine into bedroom windows caok w call Date: March 16, 2016Permit type: Request | Permit status: Closed | Completion date: March 14, 2016 | Permit id: 2016-106178-000 | |||||
Replace 2 rtus disconnect reconnect gas pipe. One 6t with economizer. One 3t with economizer. Existing unit weight within 5% of exsiting. Date: January 27, 2016Permit type: Intake | Permit status: Closed | Completion date: January 27, 2016 | Permit id: 2016-111907-000 | |||||
Tenant improvement for new restaurant tenant, remove existing wall and restroom, build out for new tenant, includes utility room, walk in cooler and freezer, kitchen food prep area, all plumbing equipment, restroom and lobby Date: April 18, 2016Permit type: Application | Permit status: Approved | Completion date: February 12, 2016 | Permit id: 2016-120746-000 | |||||
Hvac for new restaurant tenant. Two 5 t ahus. Type 1 hood w ef & sf. 2psig gas system. Plans w 16-120746-co. Date: April 18, 2016Permit type: Intake | Permit status: Closed | Completion date: February 12, 2016 | Permit id: 2016-120750-000 | |||||
Zoning confirmation request. Permit type: Land use review | Permit status: Closed | Completion date: February 25, 2016 | Permit id: 2016-126260-000 | |||||
Zoning confirmation request. Permit type: Land use review | Permit status: Letter sent | Completion date: March 1, 2016 | Permit id: 2016-126260-000 | |||||
Add, relocate and plug fire sprinkler heads as required for ti Permit type: Intake | Permit status: Approved | Completion date: April 11, 2016 | Permit id: 2016-148602-000 | |||||
Add, relocate and plug fire sprinkler heads as required for ti Permit type: Intake | Permit status: Closed | Completion date: April 8, 2016 | Permit id: 2016-148602-000 | |||||
75-ton ahu on mezz, one 12. 5-ton, one 6-ton and one 3-ton gas pack, 18,0 cfm refrigeration room, three 1. 5t ductless splits, battery charging exhaust, refrigeration, 12 type 1 hood w fire wrap, plans w co Date: July 6, 2015Permit type: Intake | Permit status: Closed | Completion date: November 19, 2014 | Permit id: 2014-237803-000 | |||||
Sed-sump systemspw permit set fee Date: February 16, 2016Permit type: Intake -we | Permit status: Closed | Completion date: February 17, 2015 | Permit id: 2015-120150-000 | |||||
Ti for new deli Date: October 2, 2009Client: Southeast Uplift Neighborhood Program | Permit type: Alteration | Permit status: Issued | Current use: Business | Permit id: 2009-161180-000 | |||||
Tenant improvement for restaurant. Add new restroom and relocate one restroom. Date: December 3, 2009Client: Southeast Uplift Neighborhood Program | Permit type: Alteration | Permit status: Final | Completion date: February 1, 2010 | Current use: Business | Permit id: 2009-173297-000 | |||||
Ti - new tenant for coffee shop Date: April 28, 2010Client: Southeast Uplift Neighborhood Program | Permit type: Alteration | Permit status: Final | Completion date: January 12, 2011 | Current use: Business | Permit id: 2010-123859-000 | |||||
Add demising wall to separate tenant spaces; add 2 new restrooms; 3 new exterior openings - no occupancy this permit. See folder comments & documents for plans. Address assignment under future ti permits. Date: November 18, 2010Client: Southeast Uplift Neighborhood Program | Permit type: Alteration | Permit status: Final | Completion date: January 24, 2011 | Current use: Mercantile | Permit id: 2010-191786-000 | |||||
Interior ti for subway; change of occupancy to a2 (> occupant load); multnomah county health stamp on #3 Date: January 19, 2011Client: Southeast Uplift Neighborhood Program | Permit type: Alteration | Permit status: Final | Completion date: February 23, 2011 | Current use: Business | Permit id: 2011-102614-000 | |||||
Ti for new tenant - no change of occupancy - relocated nonbearing wall at kitchen Date: May 27, 2016Client: Southeast Uplift Neighborhood Program | Permit type: Alteration | Permit status: Final | Completion date: August 5, 2016 | Current use: Assembly | Permit id: 2016-179766-000 | |||||
Ti for new tenant; change of occupancy from b to m for new pharmacy; remove interior partition wall and cap plumbing fixtures see 16-183956-vi Client: Southeast Uplift Neighborhood Program | Permit type: Alteration | Permit status: Under review | Current use: Mercantile | Permit id: 2016-272965-000 |