ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Electrical permit Date: September 27, 2000Permit status: Finaled | Completion date: November 1, 2000 | Current use: Single family dwelling | Permit id: 230901 | |||||
Electrical permit Date: February 5, 2004Permit status: Finaled | Completion date: April 29, 2004 | Current use: Single family dwelling | Permit id: 331707 | |||||
Existing residential - two story addition - rough wiring, lighting fixtures, low voltage, and one 1/2hp-10hp electrical motor/heating device, and smoke detectors Date: December 4, 2013Permit type: Electrical permit | Permit status: Finaled | Completion date: September 10, 2014 | Current use: Single family dwelling | Permit id: 656951 | |||||
New mechanical equipment -manual j submitted Date: November 12, 2013Permit type: Mechanical permit | Permit status: Finaled | Completion date: September 10, 2014 | Current use: Single family dwelling | Permit id: 654744 | |||||
Building residential Date: August 24, 2000 Value: $9,500Permit status: Finaled | Completion date: November 1, 2000 | Current use: Single family dwelling | Permit id: 227395 | |||||
Two story addition revision 11/29/13 Date: September 19, 2013 Value: $250,000Permit type: Building residential permit | Permit status: Finaled | Current use: Single family dwelling | Permit id: 647480 | |||||
Dw permit (residential) remove existing driveway and construct mc-301. 05 type driveway in accordance with montgomery county standards and specifications. Work shall be complete as directed by the dps row inspector and in accordance with the public right-of-way accessibility guidelines (prowag). Complete repair (restoration of right of way) shall be made of any and all damages done to the existing improvements in the public right of way caused by construction operations on this site. All lane and sidewalk closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. (maryland dnr permit is required prior to remove/impact street trees. Complete tree protection and replanting per mc dps approved tree protection plan.) Date: July 10, 2014Permit type: Public right of way | Permit status: Completed | Current use: Driveway | Permit id: 318006 | |||||
Dumpster permit: temporarily place (not to exceed 6 months) a dumpster withing the public right of way. The permittee agrees to hold montgomery county harmless from any liability associated with the placement of dumpsters in the public right of way. Dumpster locations, barricades/and or lights are to be placed as directed by the dps inspector. Date: September 23, 2013Permit type: Public right of way | Permit status: Completed | Current use: Dumpster | Permit id: 301726 |