Demo Date: March 18, 2015Permit type: Demolition or move p | Permit status: Finaled | Completion date: November 4, 2015 | Current use: Single family dwelling | Permit id: 698710 | |||||
Electrical permit Date: November 24, 2014Permit status: Issued | Current use: Single family dwelling | Permit id: 695680 | |||||
Please do not request inspections under this permit until 2 business days after permit issuance. Date: August 12, 2015Permit type: Electrical permit | Permit status: Issued | Current use: Single family dwelling | Permit id: 724060 | |||||
New unit Date: August 13, 2015Permit type: Mechanical permit | Permit status: Issued | Current use: Single family dwelling | Permit id: 724191 | |||||
Rebuild revision submitted on 5/28/2015-architectural and structural revision issued on 6/24/2015 Date: March 18, 2015 Value: $350,000Permit type: Building residential | Permit status: Issued | Current use: Single family dwelling | Permit id: 698711 | |||||
Rebuild revision submitted on 5/28/2015-architectural andstructural revision issued on 6/24/2015 Date: March 18, 2015 Value: $350,000Permit type: Building residential permit | Permit status: Finaled | Current use: Single family dwelling | Permit id: 698711 | |||||
Electrical permit Date: April 16, 2012Permit status: Finaled | Current use: Single family dwelling | Permit id: 596267 | |||||
22kw, 91 amp generator Date: February 9, 2016Permit type: Electrical permit | Permit status: Finaled | Current use: Single family dwelling | Permit id: 744081 | |||||
Bore 1 way, replace 1 pole, 1 overhead transfromer, anchors and downguys and associated equipment to provide residential house servicein accordance with pepco plan no. 3476285. Work shall comply with montgomery county specifications for utility construction permit, the direction of the dps inspector and in accordance with the public right-of-way accessibility guidelines (prowag). A mill and overlay shall be required should the patch not meet the specifications as set forth by the current county specifications for utility construction permit and as directed by the dps row inspector. All lane closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. Must check mcdot paving project schedule and have preconstruction meeting with dps row inspector prior to beginning of construction work. Date: June 4, 2015Permit type: Public right of way | Permit status: Issued | Current use: Public utility | Permit id: 338014 | |||||
Dw permit (residential) remove existing driveway and construct mc-301. 05 type driveway in accordance with montgomery county standards and specifications. Work shall be complete as directed by the dps row inspector and in accordance with the public right-of-way accessibility guidelines (prowag). Complete repair (restoration of right of way) shall be made of any and all damages done to existing improvements in the public right of way caused by construction operations on this site. All lane and sidewalk closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. (maryland dnr permit is required prior to remove/impact street trees. Complete tree protection and replanting per mc dps approved tree protection plan.) Date: March 13, 2015Permit type: Public right of way | Permit status: Completed | Current use: Driveway | Permit id: 330006 | |||||
Install gas service in accordance with washington gas plan no. 518233. Work shall comply with montgomery county specifications for utility construction permit, the direction of the dps inspector and in accordance with the public right-of-way accessibility guidelines (prowag). A mill and overlay shall be required should the patch not meet the specifications as set forth by the current county specifications for utility construction permit and as directed by the dps row inspector. All lane closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. Permittee must check and coordinate with mcdot paving project schedule and have preconstruction meeting with dps row inspector prior to beginning of construction work. Date: April 6, 2015Permit type: Public right of way | Permit status: Issued | Current use: Public utility | Permit id: 333788 |