ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
4 amp service heavy-up / rough wiring / 25 fixtures / 2 smoke detectors / 2 low voltage (tv & telephone) for existing pete caqruounis residence - bldg permit #303459 Date: September 2, 2003Permit type: Electrical permit | Permit status: Finaled | Completion date: January 9, 2004 | Current use: Single family dwelling | Permit id: 317355 | |||||
Exact same location Date: August 10, 2012Permit type: Mechanical permit | Permit status: Finaled | Completion date: May 3, 2013 | Current use: Single family dwelling | Permit id: 608227 | |||||
Same size, same location Date: September 20, 2012Permit type: Mechanical permit | Permit status: Issued | Current use: Single family dwelling | Permit id: 612398 | |||||
Adding balony on 1st floor of sfd Date: November 22, 2011Permit type: Building residential | Permit status: Issued | Current use: Single family dwelling | Permit id: 585179 | |||||
Addition and alteration Date: May 20, 2003 Value: $55,000Permit type: Building residential | Permit status: Finaled | Completion date: January 9, 2004 | Current use: Single family dwelling | Permit id: 303459 | |||||
Extending ductwork in the addition Date: October 7, 2003Permit type: Mechanical permit | Permit status: Issued | Current use: Single family dwelling | Permit id: 320788 | |||||
Under the pavement cut moratorium until 6/12/18. A full width 2 mill and overlayis requiredper the current county specifications for utility construction permit and as directed by the dps row inspector. Replace gas service in accordance with washington gas plan no. 473235. Work shall comply with montgomery county specifications for utility construction permit, the direction of the dps inspector and in accordance with the public right-of-way accessibility guidelines (prowag). All lane closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. Permittee must have preconstruction meeting with dps row inspector prior to beginning of construction work. Date: July 28, 2015Permit type: Public right of way | Permit status: Issued | Current use: Public utility | Permit id: 340886 | |||||
On shadywood road (house #7607) string overhead wire and associated equipment in accordance with pepco plan no. 53034594. Complete repair (restoration of right of way) shall be made of any and all damages done to the existing improvements in the public right of way caused by construction operations on this site. Pre-construction meeting requiredcontact mcdps inspector bob bucklin at 301-370-3683 before and after installation. Date: September 13, 2005Permit type: Public right of way | Permit status: Finaled | Current use: Public utility | Permit id: 239724 |