ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
SCORE 95 Installation of a flush mount grid-tie 2. 4 kw photovoltaic system array to remain below ridge, inside below hips and rake edges, and above eave. See engineerfoots letter and drawing for specific information. Array on other side of duplex by separate permit -- pmt2012-03421 Date: August 2, 2012 Contractor: Solarcity CorporationClient: Johannes Rudolph,Cynthia Harris | Applicant: Solarcity Corporation | Permit type: Photovoltaic | Permit status: Cmp | Completion date: April 2, 2014 | Current use: Single family a | |||||
SCORE 95 Installation of a flush mount grid-tie 2. 4 kw photovoltaic system array to remain below ridge, inside below hips and rake edges, and above eave. See engineerfoots letter and drawing for specific information. Array on other side of duplex by separate permit -- pmt2012-03421 Client: Johannes Rudolph | Permit type: Photovoltaic | Permit status: Cmp | Completion date: April 2, 2014 | Current use: Single family attached dwelling, existin | Permit id: Pmt2012-03486 |