ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Demolition/rebuild Date: January 10, 2013Permit type: Demolition or move p | Permit status: Issued | Current use: Single family dwelling | Permit id: 617968 | |||||
Mechanical permit Date: April 18, 2013Permit status: Finaled | Completion date: January 2, 2014 | Current use: Single family dwelling | Permit id: 631586 | |||||
Electrical permit Date: October 8, 2012Permit status: Finaled | Current use: Single family dwelling | Permit id: 614015 | |||||
Generator Permit type: Electrical permit | Permit status: Open | Current use: Single family dwelling | Permit id: 637702 | |||||
Demolition/rebuild Date: January 10, 2013 Value: $400,000Permit type: Building residential permit | Permit status: Finaled | Current use: Single family dwelling | Permit id: 617970 | |||||
Generator Permit type: Electrical permit | Permit status: Open | Current use: Single family dwelling | Permit id: 637702 | |||||
Generator Permit type: Electrical permit | Permit status: Open | Current use: Single family dwelling | Permit id: 637702 | |||||
Must have preconstruction meeting with dps row inspector prior to beginning of construction. Dw permit (residential) construct mc-301. 03 type driveway in accordance with montgomery county standards and specifications and the direction of the dps row inspector. Complete repair (restoration of right of way) shall be made of any and all damages done to the existing improvements in the public right of way caused by construction operations on this site. All lane and sidewalk closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. Md dnr Date: December 12, 2012Permit type: Public right of way | Permit status: Completed | Current use: Driveway | Permit id: 283896 | |||||
Must check mcdot paving projects schedule and have preconstruction meeting with dps row inspector prior to beginning of construction. Bore roadway; dig and backfill trench; build conduit; install cable and associated equipment in accordance with pepco plan no. 3412006. Work shall comply with montgomery county specifications for utility construction permit, the direction of the dps inspector and ada & aba accessibility guidelines. A mill and overlay shall be required should the patch not meet the specifications as set forth by the current county
|