ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Change in use r-3 to assembly Date: September 3, 2008 Value: $500Permit type: Commercial building | Permit status: Finaled | Completion date: September 19, 2008 | Current use: Assembly building | Permit id: 482678 | |||||
Bldg #482678 - 4 exit lights Date: September 12, 2008Permit type: Electrical permit | Permit status: Finaled | Completion date: September 16, 2008 | Current use: Assembly building | Permit id: 495552 | |||||
Reliability replace (1) pole. Remove gang switch. Install overhead transformer. Transfer overhead wire and associated equipmentin accordance with pepco plan no. 3487526. Work shall comply with montgomery county specifications for utility construction permit, the direction of the dps inspector and in accordance with the public right-of-way accessibility guidelines (prowag). A mill and overlay shall be required should the patch not meet the specifications as set forth by the current county specifications for utility construction permit and as directed by the dps row inspector. All lane closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. Must check mcdot paving project schedule and have preconstruction meeting with dps row inspector prior to beginning of construction work. Date: October 16, 2015Permit type: Public right of way | Permit status: Issued | Current use: Public utility | Permit id: 346375 | |||||
Change in use r-3 to assembly Date: September 3, 2008 Value: $500Permit type: Commercial building | Permit status: Finaled | Current use: Assembly building | Permit id: 482678 | |||||
Bldg #482678 - 4 exit lights Date: September 12, 2008Permit type: Electrical permit | Permit status: Finaled | Current use: Assembly building | Permit id: 495552 |