ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Demolition/rebuild Date: June 4, 2013Permit type: Demolition or move p | Permit status: Completed | Completion date: August 2, 2013 | Current use: Single family dwelling | Permit id: 632849 | |||||
New mech. Equip., manual j submitted Date: September 6, 2013Permit type: Mechanical permit | Permit status: Finaled | Completion date: January 7, 2014 | Current use: Single family dwelling | Permit id: 647493 | |||||
Demolition/rebuild Date: June 6, 2013 Value: $205,000Permit type: Building residential | Permit status: Issued | Current use: Single family dwelling | Permit id: 632851 | |||||
100amp temp pole service Date: March 14, 2013Permit type: Electrical permit | Permit status: Finaled | Current use: Single family dwelling | Permit id: 628534 | |||||
Electrical permit Date: August 6, 2013Permit status: Finaled | Current use: Single family dwelling | Permit id: 644512 | |||||
Low voltage for voice,data and security systems only Date: October 21, 2013Permit type: Electrical permit | Permit status: Issued | Current use: Single family dwelling | Permit id: 647679 | |||||
Install riser, cable and associated equipment in accordance with pepco plan no. 3422173. Work shall comply with montgomery county specifications for utility construction permit, the direction of the dps inspector and in accordance with the public right-of-way accessibility guidelines (prowag). A mill and overlay shall be required should the patch not meet the specifications as set forth by the current county specifications for utility construction permit and as directed by the dps row inspector. All lane closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. Must check mcdot paving project schedule and have preconstruction meeting with dps row Date: October 21, 2013Permit type: Public right of way | Permit status: Finaled | Current use: Public utility | Permit id: 301707 | |||||
Tap 4" pvc into 18" stormdrain. Water outfall from bioretention area will tie-into the county stormdrainthrough a connection. Complete repair (restoration of right of way) shall be made of any and all damages done to the existing improvements in the public right of way caused by construction operations on this site. Work shall be completed as directed by the dps inspector. Date: May 31, 2013Permit type: Public right of way | Permit status: Completed | Current use: Public right-of-way | Permit id: 294345 | |||||
Dw permit (residential)construct mc-301. 05 type driveway in accordance with montgomery county standards and specifications and the direction of the dps row inspector. Complete repair (restoration of right of way) shall be made of any and all damages done to the existing improvements in the public right of way caused by construction operations on this site. All lane and sidewalk closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. Md
|