ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Summary: install fencing that will partially pass through a wetland buffer. Ive been working with seth amrhein (sr. Environmental analyst at seattle dci) and he said the work "would qualify for a small project waiver" and that i should submit a preliminary application and request a critical area exemption. Applicant: Dochow, Cory | Permit type: Construction | Permit status: Initial information colle | Current use: Single family / duplex | Permit id: 6539082 | |||||
Summary: install fencing that will partially pass through a wetland buffer. Ive been working with seth amrhein (sr. Environmental analyst at seattle dci) and he said the work "would qualify for a small project waiver" and that i should submit a preliminary application and request a critical area exemption. Details: im estimating 135 feet of the fence would pass through the wetland buffer. The fence will be installed without removing any trees or shrubs and the only disturbance to the wetland buffer should be installing the fence posts every 8 to feet. Im estimating a need for no more than fence posts in the buffer area, each with a hole no bigger than 8 inches square. The total disturbed area in the wetland buffer will be 9 square feet or less and the total excavated volume will be cubic feet ( . 67 cubic yards) or less. Im interested in putting up the fence because we continue to have problems with people trespassing and dumping material on the property. My plan is to reuse an old chai Applicant: Dochow, Cory | Permit type: Construction | Permit status: Initial information colle | Current use: Single family / duplex | Permit id: 6539082 | |||||
Summary: install fencing that will partially pass through a wetland buffer. Ive been working with seth amrhein (sr. Environmental analyst at seattle dci) and he said the work "would qualify for a small project waiver" and that i should submit a preliminary application and request a critical area exemption. Details: im estimating 135 feet of the fence would pass through the wetland buffer. The fence will be installed without removing any trees or shrubs and the only disturbance to the wetland buffer should be installing the fence posts every 8 to feet. Im estimating a need for no more than fence posts in the buffer area, each with a hole no bigger than 8 inches square. The total disturbed area in the wetland buffer will be 9 square feet or less and the total excavated volume will be cubic feet ( . 67 cubic yards) or less. Im interested in putting up the fence because we continue to have problems with people trespassing and dumping material on the property. My plan is to reuse an old chain Applicant: Dochow, Cory | Permit type: Construction | Permit status: Initial information colle | Current use: Single family / duplex | Permit id: 6539082 |