ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Add service and feeder Date: November 25, 2014Permit type: Intake | Permit status: Closed | Completion date: November 25, 2014 | Permit id: 2014-242541-000 | |||||
Emergency response to tree failure Permit type: C - emergency | Permit status: Emergency resolved/follow | Completion date: March 24, 2015 | Permit id: 2015-136535-000 | |||||
Park tree removal permit Date: April 6, 2015Permit type: D - permit request | Permit status: Permit issued | Completion date: April 6, 2015 | Permit id: 2015-139010-000 | |||||
Approval of a conditional use review for approximately 27,629 square feet of new exterior improvement area that includes: (1) a concrete pad to support a new patio seating and approximately 25 driving range stalls, (2) new concrete paths, and (3) a new outdoor gathering area with hard surface and a circular wood trellis, for the colwood golf course, subject to the following conditions: a. As part of the permit application submittal, condition b must be noted on each of the required site plans or related public works permit submittal. B. A new water meter box must be located within the right-of-way and at the right-of-way line of ne alderwood rd coming off the existing 12 ci water main, to meet city title 21. 12. 0 requirements. Date: June 29, 2015Permit type: Land use review | Permit status: Completed | Completion date: April 29, 2015 | Permit id: 2015-155586-000 | |||||
Request for comprehensive plan map amendment and zoning map amendment to change the zoning designation for the northern portion of colwood golf course from open space (os) to general industrial (ig2) and environmental review for the on-site impact to the environmental protection overlay Date: November 4, 2013Permit type: Land use review | Permit status: Completed | Completion date: December 11, 2012 | Permit id: 2012-213885-000 | |||||
Grading, tree removal, mitigationgolf hole reconfiguration for existing golf course Date: July 28, 2014Permit type: Intake | Permit status: Approved | Completion date: May 14, 2014 | Permit id: 2014-156629-000 | |||||
Approval of an environmental review for: a 12-inch public stormwater outfall to the columbia slough; a 42-inch private stormwater outfall to the columbia slough; 1 square feet of additional disturbance are for two driveways through the c zone; 15,065 square feet of disturbance to the c zone for right-of-way dedication and frontage improvements along ne cornfoot road; and two fire vaults within the c zone,per the approved site plans, exhibits c. 1 through c. 17, signed and august 11, 2014, subject to the following conditions:a. As part of any site development permit, grading permit, and/or building permit application submittal, the following development-related conditions (b through e) must be noted on each of the 4 required site plans or included as a sheet in the numbered set of plans. The sheet on which this information appears must be labeled zoning compliance page - case file lu 14-164599 en. All requirements must be graphically represented on the site plan, landscape, or other requi Date: August 12, 2014Permit type: Land use review | Permit status: Completed | Completion date: June 6, 2014 | Permit id: 2014-164599-000 | |||||
Demo of golf course restroom facility septic tank. (see 14-184799 co) Date: October 29, 2014Permit type: Application | Permit status: Approved | Completion date: October 29, 2014 | Permit id: 2014-231790-000 | |||||
Redevelop parking lot area and seating area outside clubhouse; new gathering area with walkway and 3 trellis septic decommissioning required under separate permit Date: April 18, 2016Permit type: Application | Permit status: Approved | Completion date: September 11, 2015 | Permit id: 2015-235017-000 | |||||
Design costs to be charged to internal order # 7trpk0000078construction costs to be charged to internal order # (tbd at later date) Permit type: Intake pw | Permit status: Assigned | Completion date: September 30, 2015 | Permit id: 2015-244358-000 | |||||
Design costs to be charged to internal order # 7trpk0000078construction costs to be charged to internal order # (tbd at later date) Permit type: Intake pw | Permit status: Assigned | Completion date: October 12, 2015 | Permit id: 2015-244358-000 | |||||
Design costs to be charged to internal order # 7trpk0000078construction costs to be charged to internal order # (tbd at later date) Permit type: Pre-design pw | Permit status: Completed | Completion date: January 19, 2016 | Permit id: 2015-244358-000 | |||||
Design costs to be charged to internal order # 7trpk0000078construction costs to be charged to internal order # (tbd at later date) Permit type: Pre-design pw | Permit status: Not reqd | Completion date: October 12, 2015 | Permit id: 2015-244358-000 | |||||
Design costs to be charged to internal order # 7trpk0000078construction costs to be charged to internal order # (tbd at later date) Permit type: Pre-design pw | Permit status: Received | Completion date: September 30, 2015 | Permit id: 2015-244358-000 | |||||
Design costs to be charged to internal order # 7trpk0000078construction costs to be charged to internal order # (tbd at later date) Permit type: Pre-design pw | Permit status: Accepted for review | Completion date: October 8, 2015 | Permit id: 2015-244358-000 | |||||
Design costs to be charged to internal order # 7trpk0000078construction costs to be charged to internal order # (tbd at later date) Permit type: Plan review pw | Permit status: Approved | Completion date: December 1, 2015 | Permit id: 2015-244358-000 | |||||
Design costs to be charged to internal order # 7trpk0000078construction costs to be charged to internal order # (tbd at later date) Permit type: Plan review pw | Permit status: Approved | Completion date: January 27, 2016 | Permit id: 2015-244358-000 | |||||
Design costs to be charged to internal order # 7trpk0000078construction costs to be charged to internal order # (tbd at later date) Permit type: Plan review pw | Permit status: Approved | Completion date: April 7, 2016 | Permit id: 2015-244358-000 | |||||
Design costs to be charged to internal order # 7trpk0000078construction costs to be charged to internal order # (tbd at later date) Permit type: Bond/insurance pw | Permit status: Approved | Completion date: January 6, 2016 | Permit id: 2015-244358-000 | |||||
Design costs to be charged to internal order # 7trpk0000078construction costs to be charged to internal order # (tbd at later date) Permit type: Pre-issuance pw | Permit status: Completed | Completion date: December 2, 2015 | Permit id: 2015-244358-000 | |||||
Approval of an environmental review for: removal of 37 trees; removal of vegetation; and, reconfigured construction of paved parking and maneuvering areas,all within the environmental conservation overlay zone, and in substantial conformance with exhibits c. 3-c. 7, as approved by the city of portland bureau of development services on april 13, 2015. Approval is subject to the following conditions:a. Bds construction permits are required for site development and inspection of required mitigation plantings. Copies of the stamped exhibits c. 3-c. 7 from lu 15-245376 en and conditions of approval listed below, shall be included within all plan sets submitted for permits (building, zoning, grading, site development, erosion control, etc. See other technical requirements listed above). These exhibits shall be included on a sheet that is the same size as the plans submitted for the permit and shall include the following statement, any field changes shall be in substantial conformance with approv Date: April 14, 2016Permit type: Land use review | Permit status: Completed | Completion date: October 8, 2015 | Permit id: 2015-245376-000 | |||||
Park tree pruning permit Date: February 3, 2016Permit type: D - permit request | Permit status: Permit issued | Completion date: February 3, 2016 | Permit id: 2016-113964-000 | |||||
Add service and feederfaxed Date: November 25, 2014Permit type: Intake | Permit status: Closed | Completion date: November 25, 2014 | Permit id: 2014-242541-000 | |||||
Emergency response to tree failure Permit type: C - emergency | Permit status: Emergency resolved | Completion date: July 14, 2015 | Permit id: 2015-200941-000 | |||||
Design costs to be charged to internal order # 7trpk0000078construction costs to be charged to internal order # (tbd at later date) Permit type: Intake pw | Permit status: Assigned | Completion date: September 30, 2015 | Permit id: 2015-244358-000 | |||||
Design costs to be charged to internal order # 7trpk0000078construction costs to be charged to internal order # (tbd at later date) Permit type: Intake pw | Permit status: Assigned | Completion date: October 12, 2015 | Permit id: 2015-244358-000 | |||||
Design costs to be charged to internal order # 7trpk0000078construction costs to be charged to internal order # (tbd at later date) Permit type: Pre-design pw | Permit status: Completed | Completion date: January 19, 2016 | Permit id: 2015-244358-000 | |||||
Design costs to be charged to internal order # 7trpk0000078construction costs to be charged to internal order # (tbd at later date) Permit type: Pre-design pw | Permit status: Not reqd | Completion date: October 12, 2015 | Permit id: 2015-244358-000 | |||||
Design costs to be charged to internal order # 7trpk0000078construction costs to be charged to internal order # (tbd at later date) Permit type: Pre-design pw | Permit status: Received | Completion date: September 30, 2015 | Permit id: 2015-244358-000 | |||||
Design costs to be charged to internal order # 7trpk0000078construction costs to be charged to internal order # (tbd at later date) Permit type: Pre-design pw | Permit status: Accepted for review | Completion date: October 8, 2015 | Permit id: 2015-244358-000 | |||||
Design costs to be charged to internal order # 7trpk0000078construction costs to be charged to internal order # (tbd at later date) Permit type: Plan review pw | Permit status: Approved | Completion date: December 1, 2015 | Permit id: 2015-244358-000 | |||||
Design costs to be charged to internal order # 7trpk0000078construction costs to be charged to internal order # (tbd at later date) Permit type: Plan review pw | Permit status: Approved | Completion date: January 27, 2016 | Permit id: 2015-244358-000 | |||||
Design costs to be charged to internal order # 7trpk0000078construction costs to be charged to internal order # (tbd at later date) Permit type: Plan review pw | Permit status: Approved | Completion date: April 7, 2016 | Permit id: 2015-244358-000 | |||||
Design costs to be charged to internal order # 7trpk0000078construction costs to be charged to internal order # (tbd at later date) Permit type: Bond/insurance pw | Permit status: Approved | Completion date: January 6, 2016 | Permit id: 2015-244358-000 | |||||
Design costs to be charged to internal order # 7trpk0000078construction costs to be charged to internal order # (tbd at later date) Permit type: Pre-issuance pw | Permit status: Completed | Completion date: December 2, 2015 | Permit id: 2015-244358-000 | |||||
Emergency response to tree failure Permit type: C - emergency | Permit status: Emergency resolved | Completion date: July 14, 2015 | Permit id: 2015-200941-000 | |||||
New pump house Date: December 5, 2003Client: Central Northeast Neighborhoods | Permit type: New construction | Permit status: Final | Completion date: June 3, 2004 | Current use: Business | Permit id: 2003-153964-000 | |||||
Front entry with side lights and skylights Date: July 15, 2004Client: Central Northeast Neighborhoods | Permit type: Alteration | Permit status: Final | Completion date: February 18, 2005 | Current use: Business | Permit id: 2004-035183-000 | |||||
See parent lur for scope of work, culverts to bridges Date: September 23, 2004Client: Central Northeast Neighborhoods | Permit type: Alteration | Permit status: Final | Completion date: April 2, 2009 | Current use: Business | Permit id: 2004-039861-000 | |||||
Int. Alt. To kitchen area needs mech for hood see al folder Date: February 22, 2005Client: Central Northeast Neighborhoods | Permit type: Alteration | Permit status: Final | Completion date: March 30, 2005 | Current use: Business | Permit id: 2005-110121-000 | |||||
Install 5 partition walls to enclose video poker room, and add new accessible ramp to replace 2 steps Date: November 8, 2005Client: Central Northeast Neighborhoods | Permit type: Alteration | Permit status: Final | Completion date: December 13, 2005 | Current use: Business | Permit id: 2005-172065-000 | |||||
Demo golf cart bridge due to unsafe conditions Date: May 28, 2008Client: Central Northeast Neighborhoods | Permit type: Demolition | Permit status: Issued | Current use: Utility | Permit id: 2008-132433-000 | |||||
Interior tenant improvement on lower level to include demo of walls and adding new walls for mens and womens restrooms. Date: October 6, 2010Permit type: Alteration | Permit status: Final | Completion date: June 28, 2011 | Current use: Assembly | Permit id: 2010-179773-000 |