| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Interior alteration and demolition work for propose hotel. (permit #459261 is reference to this permit also) Date: July 11, 2007 Value: $1,815,000Permit type: Commercial building | Permit status: Finaled | Completion date: May 28, 2009 | Current use: Garage | Permit id: 432075 | |||||
Hilton garden inn-mixed use building-hotel, meeting room, restaurant, pool in ground-u&o 250763 code modification request for 1/16/2007 due to the nature of the renovation conditions, it is hightly impracticle to provide both stairs serving the high-rise hotel, to exit directly to sidewalk at waverly street but there is an existing garage and exitway on the south end of the hotel that have different property oweners and therefore the occupants of the hotel would have to exit across another property, which is not permitted. One stair exits into the lobby and directly to the main entry/exit so as to not rener the restaurentlounge area unstable. Code modification request 2/23/2007 ibc 2003 section 705. 1 fire walls Date: April 11, 2008 Value: $32,000,000Permit type: Commercial building | Permit status: Issued | Current use: Hotel | Permit id: 440563 | |||||
Retaining wall for hilton garden inn (corner of waverly street) Date: July 16, 2008 Value: $2,000Permit type: Commercial building | Permit status: Issued | Current use: Retaining wall | Permit id: 476955 | |||||
Construct swimming pool on 2nd floor of hilton garden inn hotel Date: May 5, 2009 Value: $51,232Permit type: Commercial building | Permit status: Finaled | Completion date: September 25, 2009 | Current use: Swimming pool | Permit id: 488039 | |||||
A/p 440563 mixed use, Date: April 21, 2008Permit type: Electrical permit | Permit status: Finaled | Completion date: September 10, 2009 | Current use: Hotel | Permit id: 483126 | |||||
Hilton garden inn-mixed use building-hotel, meeting room, restaurant, pool in ground-u&o 250763+++code modification request for 1/16/2007 due to the nature of the renovation conditions, it is hightly impracticle to provide both stairs serving the high-rise hotel, to exit directly to sidewalk at waverly street but there is an existing garage and exitway on the south end of the hotel that have different property oweners and therefore the occupants of the hotel would have to exit across another property, which is not permitted. One stair exits into the lobby and directly to the main entry/exit so as to not rener the restaurentlounge area unstable. Code modification request 2/23/2007 ibc 2003 section 705. 1 fire walls Date: April 11, 2008 Value: $32,000,000Permit type: Commercial building | Permit status: Finaled | Current use: Hotel | Permit id: 440563 | |||||
Bldg #432075 - garage and stairwell refer to #459261 also Date: November 17, 2008Permit type: Electrical permit | Permit status: Finaled | Current use: Garage | Permit id: 500327 | |||||
Bldg #440563 - low voltage - sound system Date: February 24, 2009Permit type: Electrical permit | Permit status: Issued | Current use: Hotel | Permit id: 505746 | |||||
Low voltage - voice/data Date: April 9, 2009Permit type: Electrical permit | Permit status: Issued | Current use: Hotel | Permit id: 508805 | |||||
Electrical permit Date: June 12, 2009Permit status: Finaled | Current use: Business building | Permit id: 513664 | |||||
Illuminated wall sign on building: sign permit:514622/514624/514625 Date: July 31, 2009Permit type: Electrical permit | Permit status: Finaled | Current use: Illuminated sign | Permit id: 514610 | |||||
New a/p 440563 Date: May 29, 2008Permit type: Mechanical permit | Permit status: Finaled | Current use: Hotel | Permit id: 486385 | |||||
On waverly street (#7301) install 2 inch plastic gas service in accordance with washington gas plan no. 64233. Construct utility pavement patch in kind as directed by the inspector in the field. A mill and overlay shall be required should the patch not meet the specifications as set forth by the current maryland state highway administration (msha) specifications and montgomery county specifications for utility construction permit. Complete repair (restoration of right of way) shall be made of any and all damages done to the existing improvements in the public right of way caused by construction operations on this site. Pre-construction meeting requiredcontact mcdps inspector ralph wolfe at 301-370-3692 before and after installation. Date: August 7, 2007Permit type: Public right of way | Permit status: Finaled | Current use: Public utility | Permit id: 254137 | |||||
Construct storm drains in accordance with montgomery county standards and specifications and approved plans. Prior to placement of any curb & gutter or pavement all utility crossings must be certified as being in place. Construct concrete sidewalk, concrete curb and gutter, driveway aprons, sidewalk and street paving as per approved montgomery county standards and specifications and approved plans. Install street lights in accordance with plans to be approved by the division of traffic and parking services, montgomery county department of public works and transportation. Plant street trees in accordance with montgomery county code, sec. 49-35(j)(i). Relocate utility pole as directed. Construct bollards, retaining wall, brick paver sidewalk, temporary construction entrance, under drain, pavement markings, mill and overlay, 8 inch water main and adjust water valve in accordance with approved paving plans and as directed. Date: March 21, 2008Permit type: Public right of way | Permit status: Completed | Current use: Paving and storm drain | Permit id: 250764 | |||||
Construction entrance & landscape, hardscape and repaving capital cresent trail inside tunnel and extended area as revised plan: construct temporary stabilized construction entrance per dps inspector. Proper precautions must be taken to keep the roadways free of mud, debris or other obstructions. Prior to release of this permit, the temporary entrance will be removed and complete repair shall be made of any and all damages done to the existing improvements in the public right of way caused by construction operations on site. Construct landscape, hardscape and repaving the trail per approved plan. Install 4" pvc underdrain pipe per plan. Work shall be completed as directed by the dps inspector. This is revision on 3/11/09. Date: November 12, 2008Permit type: Public right of way | Permit status: Completed | Current use: Public right-of-way | Permit id: 259761 | |||||
On waverly street (house #7301)building two manholes,instaling one transformer, dig and backfill trench, build conduit, install cable and associated equipment to provide 4 amp underground service in accordance with pepco plan no. 3268116. Complete repair (restoration of right of way) shall be made of any and all damages done to the existing improvements in the public right of way caused by construction operations on this site. <><>pre-construction meeting required<><>contact mcdps inspector christopher cary at 301-370-3686 before and after installation. Date: August 7, 2008Permit type: Public right of way | Permit status: Finaled | Current use: Public utility | Permit id: 258809 | |||||
On waverly rd (bldg #7301) install cable and associated equipment to provide service to streetlights in accordance with pepco plan no. 3310764. All above & below grade facilities shall be placed in public utility easements or adjacent to the right-of-way line unless approved otherwise by the mcdps right-of-way (row) inspector. Work shall comply with the current montgomery county specifications for utility construction permit. All lane closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector (see the approved tcp of row# 250764). Complete repair (restoration of right of way) shall be made of any and all damages done to the existing improvements in the public right of way caused by construction operations on this site. Pre-construction meeting requiredcontact mcdps inspector ralph wolfe at 301-370-3692 before and after installation. Date: June 10, 2009Permit type: Public right of way | Permit status: Finaled | Current use: Public utility | Permit id: 261656 | |||||
On waverly street (bethesda hotel - #7301 waverly street) construct excavation and compaction for 8 inch water and 8 inch sewer connections and abandonment of existing connections in accordance with wssc plans and specifications. Construct utility pavement patch in kind as directed. A mill and overlay shall be required should the patch not meet the specifications as set forth by the current maryland state highway administration (msha) specifications and montgomery county specifications for utility construction permit. Complete repair (restoration of right of way) shall be made of any and all damages done to the existing improvements in the public right of way caused by construction operations on this site. Pre-construction meeting requiredcontact mcdps inspector ralph wolfe at 301-370-3692 before and after installation. Date: August 27, 2007Permit type: Public right of way | Permit status: Completed | Current use: Public utility | Permit id: 253397 | |||||
On waverly st (house #7301) repair on gas main in accordance with washington gas plan no. 76644. Construct utility pavement patch in kind as directed by the inspector in the field. A mill and overlay shall be required should the patch not meet the specifications as set forth by the current maryland state highway administration (msha) specifications and montgomery county specifications for utility construction permit. Complete repair (restoration of right of way) shall be made of any and all damages done to the existing improvements in the public right of way caused by construction operations on this site. <><>pre-construction meeting required<><>contact mcdps inspector chris cary at 301-370-3686 before and after installation. Date: June 11, 2008Permit type: Public right of way | Permit status: Finaled | Current use: Public utility | Permit id: 257652 | |||||
Public row (restoration): "tieback installation on waverly street" complete repair (restoration of right of way) shall be made of any and all damages done to the existing improvements in the public right of way caused by construction operations on this site. . Pre-construction meeting requiredcontact mcdps inspector ralph wolfe at 301-370-3692 before and after installation. Date: March 20, 2008Permit type: Public right of way | Permit status: Completed | Current use: Public right-of-way | Permit id: 256813 | |||||
Miller & long has been given permission to stage a crane on waverly street for 7301 waverly street in downtown bethesda starting saturday, january 10, 2009 and ending january 11, 2009 between the hours of 7: am and 7: pm in accordance with the approved traffic control plan. Complete repair (restoration of right of way) shall be made of any and all damages done to the existing improvements in the public right of way caused by construction operations on this site. Pre-construction meeting requiredcontact mcdps inspector ralph wolfe at 301-370-3692 before and after installation. Date: June 11, 2008Permit type: Public right of way | Permit status: Finaled | Current use: Public right-of-way | Permit id: 258155 | |||||
Construction entrance: construct temporary stabilized construction entrance (s) and subject to the conditions as noted below. Proper precautions must be taken to keep the roadways free of mud, debris or other obstructions. Prior to release of this permit, the temporary entrance will be removed and complete repair shall be made of any and all damages done to the existing improvements in the public right of way. Date: February 6, 2007Permit type: Public right of way | Permit status: Completed | Current use: Driveway | Permit id: 248701 | |||||
Crane rental co has been given permission to stage the crane operation on waverly st for 7301 waverly st starting saturday, august 15, saturday 22, and saturday 29, 2009 all between the hours of 7: am and 7 pm in accordance with the approved traffic control plan. Complete repair (restoration of right of way) shall be made of any and all damages done to the existing improvements in the public right of way caused by construction operations on this site. Pre-construction meeting requiredcontact mcdps inspector ralph wolfe at 301-370-3692 before and after installation. Date: August 6, 2009Permit type: Public right of way | Permit status: Finaled | Current use: Miscellaneous structure | Permit id: 262625 | |||||
Pre-const. Mtg. Reqd call dps inspector ralph wolfe @ 301-370-3692 place fiber cable facilities in existing 10-pc or 9-mtd (conduit/ducts/handhold boxes/pedestals,etc). All above & below grade facilities shall be placed in public utility easements or adjacent to the right-of-way line unless approved otherwise by the mcdps right-of-way (row) inspector. Work shall comply w/the mont. Co. Specs. For utility const. Permit, july, 2003. All lane closures/traffic controls shall comply w/approved traffic control plans, guidelines for temp. Traffic control requirements & directions of the dps row inspector. Complete repair/restoration of the row shall be made in-kind of any & all damages to improvements in the public row caused by construction operations. Const. Crews shall not drive/park vehicles over curbs, sidewalks or grassy areas. Utility rep: joseph mach @ 301-595-6869 verizon #9a82948 Date: August 21, 2007Permit type: Public right of way | Permit status: Completed | Current use: Public utility | Permit id: 254323 |