ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
P/i r/h mortise lock on apt 3r door. Make neccessary adjustments and restore door to p. W. O. Rear door. Note: call tenant for appointment at (718) 366- Date: July 13, 2011Permit type: Gc | Permit id: Ec01916 | |||||
P i r h mortise lock on apt 3r door. Make neccessary adjustments and restore door to p. W. O. Rear door. Note: call tenant for appointment at (718) 366- Date: July 13, 2011Permit type: Gc | Permit id: Ec01916 | |||||
As per hpds lead abatement requirement contracts and attached scope of work thoroughly remove all lead violations as per new york city administrative Date: May 13, 2011Permit type: Delead | Permit id: Eb31373 | |||||
Perform total lead analysis of 05 dust wipe sample(s) via environmental protection agency (epa) sw8453050-74 method utilizing flame atomic absorptio Date: April 11, 2011Permit type: Delead | Permit id: Eb27918 | |||||
Perform total lead analysis of 02 dust wipe sample(s) via environmental protection agency (epa) sw8453050-74 method utilizing flame atomic absorptio Date: August 12, 2011Permit type: Delead | Permit id: Ec04692 | |||||
Perform total lead analysis of 04 dust wipe sample(s) via environmental protection agency (epa) sw8453050-74 method utilizing flame atomic absorptio Date: May 11, 2011Permit type: Delead | Permit id: Eb31063 | |||||
As per hpds lead abatement requirement contracts and attached scope of work thoroughly remove all lead violations as per new york city administrative Date: September 23, 2011Permit type: Delead | Permit id: Ec08103 | |||||
Replace with new broken window glass at upper sash in bedroom (e4) in apt. 3l. Remove all work related debris. Contractor must sign and ret Date: January 31, 2012Permit type: Gc | Permit id: Ec19054 | |||||
Perform total lead analysis of 02 dust wipe sample(s) via environmental protection agency (epa) sw8453050-74 method utilizing flame atomic absorptio Date: April 7, 2011Permit type: Delead | Permit id: Eb27522 | |||||
Perform total lead analysis of 04 dust wipe sample(s) via environmental protection agency (epa) sw8453050-74 method utilizing flame atomic absorptio Date: October 4, 2011Permit type: Delead | Permit id: Ec09037 | |||||
Properly repair with similar material defective 4 walls appr s. F. Of scuttle to roof at public hall 3 rd story. Prime, and paint with 2 coa Date: January 30, 2012Permit type: Gc | Permit id: Ec19059 | |||||
As per hpds lead abatement requirement contracts and attached scope of work thoroughly remove all lead violations as per new york city administrative Date: April 9, 2011Permit type: Delead | Permit id: Eb27933 | |||||
Apt#3l:two damaged w/gs replaced:one in the kitchen and one in the bedroom. Remove all work related debris. Note: contractor must contact h. P. D. Date: June 14, 2010 Value: $119Permit type: Gc | Permit id: Ea38865 | |||||
Apt#3l:two damaged w gs replaced:one in the kitchen and one in the bedroom. Remove all work related debris. Note: contractor must contact h. P. D. Date: June 14, 2010 Value: $119Permit type: Gc | Permit id: Ea38865 |