ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Con ed provide electricity to building public areas and heating plant/hot water heater Date: April 23, 2013Permit type: Util | Permit id: Ed21093 | |||||
Apt 3...... Install (2) window guards through-out apartment. Date: April 22, 2015 Value: $55Permit type: Gc | Permit id: Ef19632 | |||||
Installed 1 windowguard on the 1story public hallway installed another windowguard on the 2nd story public hallway Date: October 28, 2010 Value: $128Permit type: Gc | Permit id: Eb13799 | |||||
Con ed provide electricity to building public areas and heating plant hot water heater Date: April 23, 2013Permit type: Util | Permit id: Ed21093 | |||||
Apt. #3: kitchen:- remove defective existing window unit at the kitchen. Provide and install new aluminum dhc replacement window unit with double g Date: January 2, 2014Permit type: Gc | Permit id: Ee12708 | |||||
Perform total lead analysis of dust wipe sample(s) via environmental protection agency (epa) sw8453050-74 method utilizing flame atomic absorptio Date: April 12, 2011Permit type: Delead | Permit id: Eb28056 | |||||
Apt 3: as per the requirement contract with hpd, provide and install 6 window guards throughout entire apartment. Remove all work related debris. Date: January 9, 2014Permit type: Gc | Permit id: Ee12899 | |||||
As per hpds lead abatement requirement contracts and attached scope of work thoroughly remove all lead violations as per new york city administrative Date: January 14, 2014Permit type: Delead | Permit id: Ee13284 | |||||
As per hpds lead abatement requirement contracts and attached scope of work thoroughly remove all lead violations as per new york city administrative Date: February 22, 2011Permit type: Delead | Permit id: Eb23168 | |||||
Provide and install approx x of roofing material at front to mid-section at roof. 2 ply roof, including, 90ib. Fiberglass mat/ asphalic rol Date: October 14, 2010Permit type: Gc | Permit id: Eb11986 | |||||
Perform total lead analysis of 07 dust wipe sample(s) via environmental protection agency (epa) sw8453050-7000b method utilizing flame atomic absorpti Date: February 4, 2014Permit type: Delead | Permit id: Ee15576 | |||||
National grid to provide gas to boiler/hot water heater. Date: November 21, 2013Permit type: Util | Permit id: Ee10392 | |||||
At apt #3: foyer / apt entrance door remove the broken wood jamb and replace with new. Reinforce the frame and casing. Install a surface mount lo Date: November 10, 2010Permit type: Gc | Permit id: Eb14155 | |||||
Apt. #3: kitchen:- supply and install new kitchen sink, its cabinet, faucet with complete waste line piping accessories. Make all necessary repairs Date: January 2, 2014Permit type: Gc | Permit id: Ee12710 | |||||
At apt #3: foyer apt entrance door remove the broken wood jamb and replace with new. Reinforce the frame and casing. Install a surface mount lo Date: November 10, 2010Permit type: Gc | Permit id: Eb14155 | |||||
National grid to provide gas to boiler hot water heater. Date: November 21, 2013Permit type: Util | Permit id: Ee10392 | |||||
Provide and install approx x of roofing material at front to mid-section at roof. 2 ply roof, including, 90ib. Fiberglass mat asphalic rol Date: October 14, 2010Permit type: Gc | Permit id: Eb11986 |