ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Cash bond ps4-15032 Date: March 9, 2004Permit type: Demolition or move p | Permit status: Completed | Completion date: September 14, 2009 | Current use: Single family dwelling | Permit id: 326966 | |||||
Temp for construction - pole service Date: February 20, 2004Permit type: Electrical permit | Permit status: Issued | Current use: Miscellaneous structure | Permit id: 333071 | |||||
On exfair road (#7119) replace one (1) pole, install transformer, bore roadway to install cables and associated equipment in accordance with pepco plan no. 63033442. >>>pre-construction meeting required>>pre-construction meeting required>pre-construction meeting requiredpre-construction meeting required<< Date: June 16, 2004Permit type: Public right of way | Permit status: Finaled | Current use: Public utility | Permit id: 229862 | |||||
On exfair road (#7119) install 2 inch plastic gas service in accordance with washington gas plan no. 69354. Complete repair (restoration of right of way) shall be made of any and all damages done to the existing improvements in the public right of way caused by construction operations on this site. Construct utility pavement patch as directed. >>>pre-construction meeting required>>pre-construction meeting required>pre-construction meeting requiredpre-construction meeting required<< Date: July 7, 2004Permit type: Public right of way | Permit status: Finaled | Current use: Public utility | Permit id: 230226 | |||||
Dw permit: construct the following type driveway in accordance with montgomery county standards and specifications and the direction of the dps inspector. All future maintenance of this apron will be the responsibility of the property owner. Mcdot standard: mc 301. 01. Date: January 5, 2004Permit type: Public right of way | Permit status: Completed | Current use: Driveway | Permit id: 225820 |