ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Pre-const. Mtg. Reqd call dps inspector ralph wolfe @ 301-370-3692 place buried fiber cable facilities in existing conduit. All above & below grade (conduit/ducts/handhold boxes/pedestals,etc) facilities shall be placed in public utility easements. If approved by the mcdps right-of-way (row) inspector, fiber cable facilities may be placed within the public right-of-way (row) adjacent to the row line. Work shall comply w/the mont. Co. Specs. For utility const. Permit, july, 2003. All lane closures/traffic controls shall comply w/approved traffic control plans, guidelines for temp. Traffic control requirements & directions of the dps row inspector. Complete repair/restoration of the row shall be made in-kind of any & all damages to improvements in the public row caused by construction operations. Const. Crews shall not drive/park vehicles over curbs, sidewalks or grassy areas. Utility rep: joe stewart @ 951-212-4654 verizon #8a08931 Date: November 3, 2006Permit type: Public right of way | Permit status: Completed | Current use: Public utility | Permit id: 248988 | |||||
Unit # 304 Date: December 14, 2009Permit type: Electrical permit | Permit status: Issued | Current use: Multi-family dwelling | Permit id: 527590 |