ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Ada ramp and handrail (starbucks coffee) Date: September 4, 2009 Value: $10,000Permit type: Commercial building | Permit status: Issued | Current use: Business building | Permit id: 518804 | |||||
New multi-use building including garage. Separate s&s already applied for. 21 mpdus calcalated value was determined by using the icc use values table that was effective between august, 2013 to february, 2014. The aggregrate value was 27,327,691. 70. The project has 21 mpdus with an area of 15,742 sf and a calculated value of 2,266,690. (icc r-2 rate per sf 143. 99). Need certified site plan before permit approval. Refer to mark bealls denial of 01/03/2014. Date: January 27, 2015 Value: $30,454,236Permit type: Commercial building | Permit status: Issued | Current use: Multi-family dwelling | Permit id: 658717 | |||||
Commercial building Date: November 13, 2014 Value: $960,470Permit status: Stop work | Current use: Commercial miscellaneous struc | Permit id: 684693 | |||||
Interior alterations Date: June 12, 2015 Value: $150,000Permit type: Commercial building | Permit status: Finaled | Completion date: June 23, 2015 | Current use: Business building | Permit id: 711664 | |||||
Demo of existing service station letter of credit / bond tracking ps14a78630 Date: June 10, 2014Permit type: Demolition or move p | Permit status: Stop work | Current use: Business building | Permit id: 661896 | |||||
Electrical permit Date: October 31, 2000Permit status: Finaled | Completion date: November 21, 2000 | Current use: Business building | Permit id: 233708 | |||||
Illuminated sign on main building (s-9260) tunis kitchen & bath Date: July 31, 2001Permit type: Electrical permit | Permit status: Issued | Current use: Illuminated sign | Permit id: 254854 | |||||
Fire job Date: January 28, 2003Permit type: Electrical permit | Permit status: Issued | Current use: Restaurant | Permit id: 296993 | |||||
Starbucks Date: March 25, 2005Permit type: Electrical permit | Permit status: Finaled | Completion date: March 31, 2005 | Current use: Restaurant | Permit id: 377909 | |||||
Electrical permit Date: December 24, 2007Permit status: Issued | Current use: Single family dwelling | Permit id: 474588 | |||||
Please do not request inspections under this permit until 2 business days after permit issuance. Date: October 29, 2013Permit type: Electrical permit | Permit status: Finaled | Completion date: November 13, 2013 | Current use: Commercial miscellaneous struc | Permit id: 653103 | |||||
Please do not request inspections under this permit until 2 business days after permit issuance. Date: February 27, 2014Permit type: Electrical permit | Permit status: Issued | Current use: Business building | Permit id: 664603 | |||||
Electrical permit Date: May 13, 2014Permit status: Issued | Current use: Business building | Permit id: 672634 | |||||
New multi-use building including garage new 30 amp service, 1 hp fire pump, 230kw generator mfd building: 125 units, 3 stair wells, 13 floors, 3 other Date: February 18, 2015Permit type: Electrical permit | Permit status: Issued | Current use: Multi-family dwelling | Permit id: 677516 | |||||
Electrical permit Date: June 16, 2015Permit status: Finaled | Completion date: June 22, 2015 | Current use: Single family dwelling | Permit id: 716767 | |||||
1200amp temporary pole service Date: October 22, 2015Permit type: Electrical permit | Permit status: Issued | Current use: Multi-family dwelling | Permit id: 733293 | |||||
New multi use building Date: May 27, 2015Permit type: Mechanical permit | Permit status: Issued | Current use: Business building | Permit id: 713915 | |||||
Interior alterations=true food kitchen=level 1 Value: $1,000,000Permit type: Commercial building | Permit status: Open | Current use: Restaurant | Permit id: 742980 | |||||
Electrical permit Permit status: Open | Current use: Business building | Permit id: 746657 | |||||
Electrical permit Permit status: Open | Current use: Business building | Permit id: 717666 | |||||
Exact replacement Date: June 17, 2010Permit type: Mechanical permit | Permit status: Issued | Current use: Business building | Permit id: 540909 | |||||
Interior alterations=true food kitchen=level 1 Value: $1,000,000Permit type: Commercial building | Permit status: Open | Current use: Restaurant | Permit id: 742980 | |||||
Electrical permit Permit status: Open | Current use: Business building | Permit id: 746657 | |||||
Electrical permit Permit status: Open | Current use: Business building | Permit id: 717666 | |||||
Electrical permit Permit status: Open | Current use: Business building | Permit id: 717666 | |||||
Electrical permit Permit status: Open | Current use: Business building | Permit id: 746657 | |||||
Interior alterations=true food kitchen=level 1 Value: $1,000,000Permit type: Commercial building | Permit status: Open | Current use: Restaurant | Permit id: 742980 | |||||
Low voltage - (14) speakers & (22) data drops Date: May 3, 2016Permit type: Electrical permit | Permit status: Issued | Current use: Business building | Permit id: 753943 | |||||
Cable work only - install cable and associated equipment for 4 amp servicein accordance with pepco plan no. 3444598. Work shall comply with montgomery county specifications for utility construction permit, the direction of the dps inspector and in accordance with the public right-of-way accessibility guidelines (prowag). A mill and overlay shall be required should the patch not meet the specifications as set forth by the current county specifications for utility construction permit and as directed by the dps row inspector. All lane closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. Must check mcdot paving project schedule and have preconstruction meeting with dps row inspector prior to beginning of construction work. Date: March 31, 2016Permit type: Public right of way | Permit status: Issued | Current use: Public utility | Permit id: 351332 | |||||
Disconnect and remove all existing services to building demolished in accordance with pepco plan no. 3446335. Work shall comply with montgomery county specifications for utility construction permit, the direction of the dps inspector and in accordance with the public right-of-way accessibility guidelines (prowag). A mill and overlay shall be required should the patch not meet the specifications as set forth by the current county specifications for utility construction permit and as directed by the dps row inspector. All lane closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. Must check mcdot paving project schedule and have preconstruction meeting with dps row inspector prior to beginning of construction work. Date: May 14, 2014Permit type: Public right of way | Permit status: Finaled | Current use: Public utility | Permit id: 313728 | |||||
Crane staging a&a transfer co. Has been given permission to stage the crane operation onwoodmont ave for 7100wisconsin ave weather permitting starting saturday, march 12, 2016 between the hours of 5: am and 5: pm in accordance with the approved traffic control plan and the public right-of-way accessibility guidelines (prowag). Complete repair (restoration of right of way) shall be made of any and all damages done to the existing improvements in the public right of way caused by construction operations on this site. For parking meter issues, contact mc dot division of parking management at 240-777-8740. Date: March 9, 2016Permit type: Public right of way | Permit status: Issued | Current use: Crane | Permit id: 351462 | |||||
Crane staging craneservice cohas been given permission to stage the crane operation onwoodmont ave for7100wisconsin ave starting saturday,april 11 and if needed sunday,april 12, 2015 between the hours of 3: am and 9: pm in accordance with the approved traffic control plan and the public right-of-way accessibility guidelines (prowag). Complete repair (restoration of right of way) shall be made of any and all damages done to the existing improvements in the public right of way caused by construction operations on this site. For parking meter issues, contact mc dot division of parking management at 240-777-8740. Date: April 8, 2015Permit type: Public right of way | Permit status: Issued | Current use: Public right-of-way | Permit id: 334315 | |||||
48 hour advance notice required see below & approved traffic control plan (tcp) on february 7, 2004, commercial rigging may stage a crane operation within the waverly street public right-of-way (row) bethesda to hoist cooling towers & mechanical equipment to the roof of 71 wisconsin ave. Hours of approval are from 7:00am to 7:00pm. All lane closures & other required traffic controls shall be in accordance w/the tcp & the directions of the mc. Dps row inspector. Complete repair/restoration of the row shall be made of any & all damages to existing improvements in the public row caused by construction/crane operations on this site. All operations must comply with the countys noise control ordinance. Work conducted after normal mc. Dps working hours, weekends or holidays is subject to a minimum 3 hour inspection overtime offset fee of 55. 00/hr. Date: February 2, 2004Permit type: Public right of way | Permit status: Finaled | Current use: Public right-of-way | Permit id: 226120 | |||||
Crane staging crane service company has been given permission to stage the crane operation on woodmont ave for 7100wisconsin ave starting saturday, january 9, 2016all between the hours of 3: am and 7: pm in accordance with the approved traffic control plan and the public right-of-way accessibility guidelines (prowag). Complete repair (restoration of right of way) shall be made of any and all damages done to the existing improvements in the public right of way caused by construction operations on this site. For parking meter issues, contact mc dot division of parking management at 240-777-8740. Date: January 7, 2016Permit type: Public right of way | Permit status: Issued | Current use: Crane | Permit id: 350890 | |||||
Please do not request inspections under this permit until 2 business days after permit issuance. Low voltage only - floors 1 & 5 Date: July 6, 2016Permit type: Electrical permit | Permit status: Issued | Current use: Business building | Permit id: 762754 | |||||
Interior alterations=true food kitchen=level 1 Date: October 25, 2016 Value: $1,000,000Permit type: Commercial building | Permit status: Issued | Current use: Restaurant | Permit id: 742980 | |||||
Electrical permit Date: November 17, 2016Permit status: Issued | Current use: Business building | Permit id: 746657 | |||||
Bore roadway, (dig and backfill trench)to place of 2-4" pcc from mh 119 to building entrance,encase in concreet,place from mh 119 to telecom room, splice and test aerial/buried fiber optic cable facilities in accordance with verizon plan no. 1a0aw7r. Work shall comply with montgomery county specifications for utility construction permit, the direction of the dps inspector and in accordance with the public right-of-way accessibility guidelines (prowag). A mill and overlay shall be required should the patch not meet the specifications as set forth by the current county specifications for utility construction permit and as directed by the dps row inspector. All lane closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. Must check mcdot paving project schedule and have preconstruction meeting with dps row inspector prior to beginning of construction work. Date: September 2, 2014Permit type: Public right of way | Permit status: Issued | Current use: Public utility | Permit id: 316051 | |||||
Electrical permit Permit status: Open | Current use: Business building | Permit id: 717666 |