Electrical permit Date: April 26, 2013Permit status: Finaled | Current use: Single family dwelling | Permit id: 633005 | |||||
New home on vacant lot with deck Date: March 8, 2013 Value: $250,000Permit type: Building residential permit | Permit status: Finaled | Current use: Single family dwelling | Permit id: 625969 | |||||
Must check mcdot paving projects schedule and have preconstruction meeting with dps row inspector prior to beginning of construction. Install 400amp urd service to new single family home,build conduit; install cable and associated equipment in accordance with pepco plan no. 3411428. Work shall comply with montgomery county specifications for utility construction permit, the direction of the dps inspector and ada & aba accessibility guidelines. A mill and overlay shall be required should the patch not meet the specifications as set forth by the current county Date: May 8, 2013Permit type: Public right of way | Permit status: Finaled | Current use: Public utility | Permit id: 292504 | |||||
Construct mc-301. 05 type driveway in accordance with montgomery county standards and specifications and the direction of the dps inspector. Complete repair (restoration of right of way) shall be made of any and all damages done to the existing improvements in the public right of way caused by construction operations on this site. Contact mc dot arborist (311) one week in advance to inspect any street tree trimming, trenching under the tree canopy or tree removal if required by the proposed work. The applicant must also obtain a separate roadside tree permit from the maryland department of natural resources forest service for any tree work. Date: March 1, 2013Permit type: Public right of way | Permit status: Completed | Current use: Driveway | Permit id: 289294 | |||||
Must check mcdot paving projects schedule and have preconstruction meeting with dps row inspector prior to beginning of construction. Install gas service in accordance with washington gas plan
|