ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Apt 1r.................... Install (7) window guards throught-out apartment. Date: March 14, 2016Permit type: Gc | Permit id: Eg14710 | |||||
As per the requirement contract with hpd, provide and install 3 window guards and repair window guards throughout entire apartment 2r. Remove all w Date: July 15, 2013Permit type: Gc | Permit id: Ee00177 | |||||
Apt 2r trace and repair concealed water leak at ceiling in room #4 . Replace damage ceiling tiles . Date: October 27, 2011Permit type: Gc | Permit id: Ec10129 | |||||
Perform total lead analysis of 07 dust wipe sample(s) via environmental protection agency (epa) sw8453050-74 method utilizing flame atomic absorptio Date: April 22, 2011Permit type: Delead | Permit id: Eb29203 | |||||
At apt 2r, bathroom ceiling, properly replace the loose defective plaster from ceiling with moisture resistant s r. Approx 12 sq. Ft Date: May 21, 2013Permit type: Gc | Permit id: Ed22222 | |||||
As per the requirement contract with hpd, provide and install 1 window guard and repair window guards throughout entire apartment 2r. Remove all wo Date: May 29, 2013Permit type: Gc | Permit id: Ed22966 | |||||
Perform total lead analysis of 19 dust wipe sample(s) via environmental protection agency (epa) sw8453050-74 method utilizing flame atomic absorptio Date: August 15, 2011Permit type: Delead | Permit id: Ec04890 | |||||
Apt 2r: as per the requirement contract with hpd, provide and install 3 window guards throughout entire apartment. Remove all work related debris Date: October 22, 2013Permit type: Gc | Permit id: Ee07921 | |||||
Perform total lead analysis of 02 dust wipe sample(s) via environmental protection agency (epa) sw8453050-74 method utilizing flame atomic absorptio Date: September 13, 2011Permit type: Delead | Permit id: Ec06849 | |||||
As per hpds lead abatement requirement contracts and attached scope of work thoroughly remove all lead violations as per new york city administrative Date: August 1, 2011Permit type: Delead | Permit id: Ec03662 | |||||
Apt # 2r: as per hpds lead abatement requirement contracts and attached scope of work thoroughly remove all lead violations as per new york city admi Date: April 7, 2011Permit type: Delead | Permit id: Eb27628 | |||||
As per hpds lead abatement requirement contracts and attached scope of work thoroughly remove all lead violations as per new york city administrative Date: December 5, 2013Permit type: Delead | Permit id: Ee11258 | |||||
Apt 3r: provide and install (2) window guards and repair (4) window guards at entire apartment. Rc # kc00199 remove all work related debris. Date: October 25, 2011Permit type: Gc | Permit id: Ec09855 | |||||
Perform total lead analysis of 05 dust wipe sample(s) via environmental protection agency (epa) sw8453050-7000b method utilizing flame atomic absorpti Date: December 13, 2013Permit type: Delead | Permit id: Ee11867 | |||||
Apt 3r: as per the requirement contract with hpd, provide and install 4 window guards throughout entire apartment. Remove all work related debris Date: December 3, 2013Permit type: Gc | Permit id: Ee10965 | |||||
Perform total lead analysis of 02 dust wipe sample(s) via environmental protection agency (epa) sw8453050-7000b method utilizing flame atomic absorpti Date: February 12, 2014Permit type: Delead | Permit id: Ee17065 |