Lucs Permit type: Land use review | Permit status: Closed | Completion date: January 6, 2015 | Permit id: 2015-101316-000 | |||||
Lucs Permit type: Land use review | Permit status: Letter sent | Completion date: January 27, 2015 | Permit id: 2015-101316-000 | |||||
Add detection devices to existing system Date: September 22, 2014Permit type: Electrical inspections | Permit status: Approved | Completion date: November 10, 2014 | Permit id: 2014-215661-000 | |||||
Request for land use compatibility statement for 1200-cols. Permit type: Land use review | Permit status: Closed | Completion date: October 28, 2015 | Permit id: 2015-257461-000 | |||||
Request for land use compatibility statement for 1200-cols. Permit type: Land use review | Permit status: Letter sent | Completion date: November 2, 2015 | Permit id: 2015-257461-000 | |||||
Cap 6 gas line and demo 3 gas line Date: February 8, 2016Permit type: Intake | Permit status: Closed | Completion date: February 8, 2016 | Permit id: 2016-118132-000 | |||||
Install replacement 1 gas line from meter inside building to equipment. Date: March 3, 2016Permit type: Intake | Permit status: Closed | Completion date: March 3, 2016 | Permit id: 2016-129939-000 | |||||
Add detection devices to existing systemfaxed Date: September 22, 2014Permit type: Electrical inspections | Permit status: Approved | Completion date: November 10, 2014 | Permit id: 2014-215661-000 | |||||
Request for land use compatibility statement for 1200-cols. Permit type: Land use review | Permit status: Closed | Completion date: October 28, 2015 | Permit id: 2015-257461-000 | |||||
Request for land use compatibility statement for 1200-cols. Permit type: Land use review | Permit status: Letter sent | Completion date: November 2, 2015 | Permit id: 2015-257461-000 | |||||
Close openings in exterior walls, add 3 exterior doors, new welding booths, foundations for equipment and rail crane, remove and replace concrete at paint booth, relocate overhead door from paint booth area to north exterior wall. Remove one lav, urninal, and water closet in restroom and remodel to accessible unisex restroom. Date: October 1, 2008Permit type: Alteration | Permit status: Final | Completion date: February 25, 2009 | Current use: Factory/industrial | Permit id: 2008-155511-000 | |||||
Convert warehouse to office use and future manufacturing facility; fill interior pit, pour concrete for floor, add mezzanine for offices and restrooms, stairs and access ramp on exterior, re-stripe parking lot, new parking area, bike parking and landscaping; foundation for crane only Date: January 19, 2012Permit type: Addition | Permit status: Final | Completion date: October 16, 2013 | Current use: Factory/industrial | Permit id: 2011-161826-000 | |||||
Foundation reinforcement for future equipment in east portion of existing bldg and add interior pipe bridge; mitigation planting to address violation Date: October 4, 2012Permit type: Alteration | Permit status: Final | Completion date: September 10, 2013 | Current use: Factory/industrial | Permit id: 2012-147569-000 | |||||
Supporting structural for installation of two exhaust stacks, ductwork Date: April 12, 2013Permit type: Alteration | Permit status: Final | Completion date: February 19, 2014 | Current use: Factory/industrial | Permit id: 2012-209325-000 | |||||
Exterior concrete pads and canopies on north side of building for equipment and tanks . Included are: separate uncovered pads for vacuum system, ecd, and chiller; partially covered pad for de watering hoppers, recycle water collection tank, evaporator, and boiler, with canopy over dewatering hoppers; partially covered pad for truck loading, product storage tanks, oil conditioning system, cooling tower, and cooling tower tank, with canopy over truck loading and separte canopy over oil containment system; cooling tower support structure and cooling tower tank. Date: November 5, 2012Permit type: New construction | Permit status: Final | Completion date: October 16, 2013 | Current use: Factory/industrial | Permit id: 2012-193812-000 | |||||
(1) new 4-ton runway and (1) 2-ton monorail system within existing building envelope. +++ there already are some open permits for this prpoerty +++ Date: June 14, 2013Permit type: Alteration | Permit status: Final | Completion date: September 26, 2013 | Current use: Factory/industrial | Permit id: 2013-135350-000 | |||||
Demo existing modular building at weigh station Date: November 19, 2013Permit type: Demolition | Permit status: Final | Completion date: December 11, 2013 | Current use: Business | Permit id: 2013-218027-000 | |||||
Add 100x1 metal building for recyclables and pave existing gravel parking area. Date: May 19, 2000Permit type: Addition | Permit status: Final | Completion date: September 15, 2008 | Current use: Factory/industrial | Permit id: 2000-123959-000 |