ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
SCORE 59 Six (6) soil borings are proposed to evaluate the subsurface conditions at the site. F&r will advance the soil borings to a depth of feet or auger refusal, whichever occurs first, utilizing hollow stem augers (hsa) drilling techniques. 3. 25 id hsa with an outer diameter of approximately 8 inches will be used. During the advancement of the borings, split spoon soil samples will be collected at every two feet in the upper ten feet and every five feet on-center thereafter. Please refer to the attached boring location plan and site location map for specific site and boring locations. At each work area, the turf around the test boring will be protected with nps approved plastic matting. The matting will protect the underlying turf from tearing and abrasion while allowing light to the grass below. The test borings are scheduled to a depth of feet. Drilling of the borings is expected to take up to 8 hours at each location. The test borings will be backfilled with bentonite slurry (2:1, 2 poun Date: June 13, 2017 Contractor: Parham Safarian BahriClient: Gwwo Inc. Architects | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1700327 |