ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Construction of a new opoen-air bus shelter and elevated platform with associated site work Date: March 28, 2013Permit status: Closed-finaled | Permit id: L-Plan-2013-002 | |||||
Proposed alternative: to raise the current signage up six (6) feet, which is just enough to assure the sign is not blocked from view by the transis corral that will be installed. Permit status: Closed-approved | Permit id: P-Ad-2013-0025 | |||||
Hand soil boring and pavement coring if necessary within the existing sidewalk or grass parkway at the location of new bus stops. Access will be on the sidewalk or parking lanes if possible or on foot. If necessary due to utility locations (the work cannot be performed within the sidewalk) a lane closure will be performed using the attached mdot setup. If necessary mtc can obtain approval for this on a case by case basis if it is needed. See attached for locations (24 in the city of grand rapids). Date: May 23, 2012Permit status: Closed-finaled | Permit id: Top-2012-0155 | |||||
Construct of a new open-air bus shelter and elevated platform with associated site work Date: March 28, 2013 Value: $350,000Permit status: Closed-use and occupancy | Completion date: August 29, 2014 | Permit id: Bc-New-2013-006 | |||||
Proposed alternative: to raise the current signage up six (6) feet, which is just enough to assure the sign is not blocked from view by the transis corral that will be installed. Permit status: Closed-approved | Permit id: P-Ad-2013-0025 |