ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Pbot pw permitroosevelt high school Permit type: Intake pw | Permit status: Assigned | Completion date: December 16, 2014 | Permit id: 2014-245232-000 | |||||
Pbot pw permitroosevelt high school Permit type: Pre-design pw | Permit status: Completed | Completion date: March 23, 2015 | Permit id: 2014-245232-000 | |||||
Pbot pw permitroosevelt high school Permit type: Pre-design pw | Permit status: Not reqd | Completion date: December 16, 2014 | Permit id: 2014-245232-000 | |||||
Pbot pw permitroosevelt high school Permit type: Pre-design pw | Permit status: Received | Completion date: December 3, 2014 | Permit id: 2014-245232-000 | |||||
Pbot pw permitroosevelt high school Permit type: Pre-design pw | Permit status: Accepted for review | Completion date: December 3, 2014 | Permit id: 2014-245232-000 | |||||
Pbot pw permitroosevelt high school Permit type: Pre-design pw | Permit status: Completed | Completion date: January 7, 2015 | Permit id: 2014-245232-000 | |||||
Pbot pw permitroosevelt high school Permit type: Pre-design pw | Permit status: Billed | Completion date: February 25, 2015 | Permit id: 2014-245232-000 | |||||
Pbot pw permitroosevelt high school Permit type: Plan review pw | Permit status: Not reqd | Completion date: April 1, 2015 | Permit id: 2014-245232-000 | |||||
Pbot pw permitroosevelt high school Permit type: Plan review pw | Permit status: Approved | Completion date: January 7, 2015 | Permit id: 2014-245232-000 | |||||
Pbot pw permitroosevelt high school Permit type: Pre-issuance pw | Permit status: Not reqd | Completion date: June 22, 2015 | Permit id: 2014-245232-000 | |||||
Pbot pw permitroosevelt high school Permit type: Pre-issuance pw | Permit status: Completed | Completion date: June 26, 2015 | Permit id: 2014-245232-000 | |||||
Street tree pruning permit Date: December 30, 2014Permit type: D - permit request | Permit status: Permit issued | Completion date: December 30, 2014 | Permit id: 2014-253999-000 | |||||
Ti to include interior partitions for 4 classrooms in existing cafeteria space, removal of interior partitions in existing office space and conversion to classroom, addition of interior partitions in existing classroom for new individual office spaces Date: February 25, 2015Permit type: Application | Permit status: Approved | Completion date: February 13, 2015 | Permit id: 2015-119546-000 | |||||
Installation and removal of a new pre fabricated limited duration tent structure. Tent to be removed after gymnasium facility is approved for occupancy. See attached appeals. Date: April 30, 2015Permit type: Application | Permit status: Approved | Completion date: February 23, 2015 | Permit id: 2015-122892-000 | |||||
15,0 cfm heated mua, gas piping, plans w/co Date: April 30, 2015Permit type: Intake | Permit status: Closed | Completion date: February 25, 2015 | Permit id: 2015-122895-000 | |||||
Relocation and removal of portable double classroom building. See attached appeals. Date: May 29, 2015Permit type: Application | Permit status: Approved | Completion date: February 23, 2015 | Permit id: 2015-122898-000 | |||||
Installation and removal of portable classroom building. Portable is currently a double classroom and will be converted into one room that will be used for weight training for physical education. See attached appeals. Date: May 29, 2015Permit type: Application | Permit status: Approved | Completion date: February 23, 2015 | Permit id: 2015-122911-000 | |||||
Roosevelt high school modernization. Includes the remainder of phased work (phases 1, 2 & 3). Permit type: Application | Permit status: Approved | Completion date: June 23, 2015 | Permit id: 2015-132039-000 | |||||
Roosevelt high school modernization. Includes the remainder of phased work (phases 1, 2 & 3). Permit type: Issuance/intake | Permit status: Intake | Completion date: June 23, 2015 | Permit id: 2015-132039-000 | |||||
Roosevelt high school modernization. Includes the remainder of phased work (phases 1, 2 & 3). Permit type: Process management | Permit status: Closed | Completion date: June 30, 2015 | Permit id: 2015-132039-000 | |||||
Roosevelt high school modernization. Includes the remainder of phased work (phases 1, 2 & 3). Permit type: Process management | Permit status: Closed | Completion date: June 29, 2015 | Permit id: 2015-132039-000 | |||||
Roosevelt high school modernization. Includes the remainder of phased work (phases 1, 2 & 3). Permit type: Commercial plumbing | Permit status: Not reqd | Completion date: July 2, 2015 | Permit id: 2015-132039-000 | |||||
Roosevelt high school modernization. Includes the remainder of phased work (phases 1, 2 & 3). Permit type: Parks bureau | Permit status: Approved | Completion date: June 26, 2015 | Permit id: 2015-132039-000 | |||||
Demolition of existing gymnasium building. Building is attached to main school structure. Date: April 29, 2015Permit type: Application | Permit status: Approved | Completion date: March 20, 2015 | Permit id: 2015-132039-Dmo | |||||
Grading, foundation and utilities for new additions to existing building. Selective demolition work to auditorium, commons, and classrooms. Date: June 19, 2015Permit type: Application | Permit status: Approved | Completion date: March 20, 2015 | Permit id: 2015-132039-Fnd | |||||
Demolition of existing boiler building. Date: June 19, 2015Permit type: Application | Permit status: Approved | Completion date: March 12, 2015 | Permit id: 2015-132586-000 | |||||
Demolition of northern end of existing library/classroom building (removal of band/choir room). Section to be demolished is attached to main building. Date: June 19, 2015Permit type: Application | Permit status: Approved | Completion date: March 20, 2015 | Permit id: 2015-133238-000 | |||||
Demolition in boiler, selective demo in auditorium, radon exhuast, plans w. Co Date: June 23, 2015Permit type: Intake | Permit status: Closed | Completion date: March 20, 2015 | Permit id: 2015-133282-000 | |||||
4 amp service, ug feeder and tent electrical including 120v non-monitored smoke detectors for tent. Date: March 24, 2015Permit type: Electrical inspections | Permit status: Approved | Completion date: May 14, 2015 | Permit id: 2015-139193-000 | |||||
Install fire alarm strobes Date: March 25, 2015Permit type: Electrical inspections | Permit status: Approved | Completion date: March 27, 2015 | Permit id: 2015-139993-000 | |||||
Alarm-install fire alarm system Date: April 8, 2015Permit type: Intake | Permit status: Approved | Completion date: March 25, 2015 | Permit id: 2015-140147-000 | |||||
Temporary 600amp service and feeder for temp (10) classroom building Date: April 7, 2015Permit type: Intake | Permit status: Closed | Completion date: March 27, 2015 | Permit id: 2015-141402-000 | |||||
Lv for fire alarm gym tent Date: April 14, 2015Permit type: Electrical inspections | Permit status: Approved | Completion date: May 14, 2015 | Permit id: 2015-148823-000 | |||||
Alarm-alarm for temp gym tent Date: May 6, 2015Permit type: Intake | Permit status: Approved | Completion date: April 29, 2015 | Permit id: 2015-161481-000 | |||||
1 of gas piping Date: May 1, 2015Permit type: Intake | Permit status: Closed | Completion date: May 1, 2015 | Permit id: 2015-163611-000 | |||||
Installation of new classroom portable building. Date: June 23, 2015Permit type: Application | Permit status: Approved | Completion date: May 6, 2015 | Permit id: 2015-165587-000 | |||||
Alarm - add aes radio to existing panel in auto shop area Date: May 7, 2015Permit type: Intake | Permit status: Approved | Completion date: May 7, 2015 | Permit id: 2015-166778-000 | |||||
Install new low voltage temperature controls for heating and ventilating equipment Date: May 11, 2015Permit type: Electrical inspections | Permit status: Approved | Completion date: May 14, 2015 | Permit id: 2015-168776-000 | |||||
Sprinkler - installation of fire sprinkler system in new portable classroom building Permit type: Intake | Permit status: Approved | Completion date: May 29, 2015 | Permit id: 2015-177583-000 | |||||
Sprinkler - installation of fire sprinkler system in new portable classroom building Permit type: Intake | Permit status: Closed | Completion date: May 29, 2015 | Permit id: 2015-177583-000 | |||||
Sprinkler - installation of fire sprinkler system in new portable classroom building Permit type: Fire bureau | Permit status: Approved | Completion date: July 2, 2015 | Permit id: 2015-177583-000 | |||||
3 amp termporary service to feed existing cafeteria building. - (1) 3 amp temporary service and (1) feeder. Date: May 29, 2015Permit type: Intake | Permit status: Closed | Completion date: May 29, 2015 | Permit id: 2015-177733-000 | |||||
800a 120/208v 3 phase 4 wire temp construction power service located south of the existing boiler building approx. 2 west of n. Ida@n. Sky Date: June 17, 2015Permit type: Intake | Permit status: Closed | Completion date: June 3, 2015 | Permit id: 2015-179774-000 | |||||
Temp service and relocation of emergency generator to allow removal of the boiler building so that the new construction can proceed. 800a Date: June 17, 2015Permit type: Intake | Permit status: Closed | Completion date: June 3, 2015 | Permit id: 2015-179780-000 | |||||
Install new storm line for temporary classroom building - 51 of storm sewer Date: June 11, 2015Permit type: Intake | Permit status: Closed | Completion date: June 11, 2015 | Permit id: 2015-184509-000 | |||||
Underground-new underground 4 water service line to backflow prevent and 6 line to new portable building. Permit type: Intake | Permit status: Approved | Completion date: June 22, 2015 | Permit id: 2015-189694-000 | |||||
Underground-new underground 4 water service line to backflow prevent and 6 line to new portable building. Permit type: Intake | Permit status: Closed | Completion date: June 22, 2015 | Permit id: 2015-189694-000 | |||||
Hvac for hs modernization and addition Permit type: Intake | Permit status: Closed | Completion date: June 23, 2015 | Permit id: 2015-191014-000 | |||||
Electrical for the remodel of high school Permit type: Intake | Permit status: Closed | Completion date: June 25, 2015 | Permit id: 2015-192202-000 | |||||
Demo existing auto shop building Permit type: Application | Permit status: Approved | Completion date: June 29, 2015 | Permit id: 2015-193725-000 | |||||
Demo existing auto shop building Permit type: Issuance/intake | Permit status: Intake | Completion date: June 29, 2015 | Permit id: 2015-193725-000 | |||||
Demolition of existing cafeteria building Permit type: Application | Permit status: Approved | Completion date: June 29, 2015 | Permit id: 2015-193736-000 | |||||
Demolition of existing cafeteria building Permit type: Issuance/intake | Permit status: Intake | Completion date: June 29, 2015 | Permit id: 2015-193736-000 | |||||
Demolition of existing library building Permit type: Application | Permit status: Approved | Completion date: June 29, 2015 | Permit id: 2015-193744-000 | |||||
Demolition of existing library building Permit type: Issuance/intake | Permit status: Intake | Completion date: June 29, 2015 | Permit id: 2015-193744-000 | |||||
Emergency response to tree failure Permit type: C - emergency | Permit status: Emergency resolved/follow | Completion date: July 28, 2014 | Permit id: 2014-189924-000 | |||||
Street tree removal /replant permit Date: July 30, 2014Permit type: D - permit request | Permit status: Permit issued w/deferred | Completion date: July 30, 2014 | Permit id: 2014-191191-000 | |||||
Approval of the proposed project to modernize the roosevelt h. S. Campus, increasing the floor area, from 219,574 square feet in nine buildings to 281,197 square feet in eight buildings. The various aspects of the project are approved including: demolition of the existing 1921 boiler building, 19 gymnasium, 19 library/arts/classroom building and 19 auto shop. Remodeling and repurposing of the original 1921 u building and 19 auditorium. Construction of a new auditorium, gymnasium, kitchen, cafeteria/commons, and associated circulation elements. Site improvements including parking and vehicle circulation components, which will reduce the number of onsite auto parking spaces by 18 stalls (from 61 to 43) and increase the number of bicycle parking spaces from zero to 1 spaces. Sport field alterations, including the relocation of the tennis courts and the reorientation and provisions of new lighting for the baseball and softball fields. General landscape improvements. Use of three temporary c Date: March 13, 2015Permit type: Land use review | Permit status: Completed | Completion date: October 21, 2014 | Permit id: 2014-227191-000 | |||||
Feeders to (4) subpanels & 5 rtus Date: July 22, 2015Permit type: Intake | Permit status: Closed | Completion date: July 22, 2015 | Permit id: 2015-206009-000 | |||||
Install rain drains for new moduler building. Date: July 23, 2015Permit type: Intake | Permit status: Closed | Completion date: July 23, 2015 | Permit id: 2015-206359-000 | |||||
Install new site utilities including sanitary sewer, storm sewer & drywell, water service, catch basins, 3 backflow preventers & 1 backwater valve Date: August 12, 2015Permit type: Intake | Permit status: Closed | Completion date: August 12, 2015 | Permit id: 2015-216772-000 | |||||
5 thermostats with 5 rtus and wire Date: August 13, 2015Permit type: Electrical inspections | Permit status: Approved | Completion date: August 17, 2015 | Permit id: 2015-217956-000 | |||||
265 l. F. Natural gas line Date: August 14, 2015Permit type: Intake | Permit status: Closed | Completion date: August 14, 2015 | Permit id: 2015-218046-000 | |||||
Hvac for unit portable Date: August 20, 2015Permit type: Intake | Permit status: Closed | Completion date: August 20, 2015 | Permit id: 2015-221337-000 | |||||
Add 4 circuits for section c and 3 feeders for generator/ see comments 10/16/15 / Date: October 16, 2015Permit type: Intake | Permit status: Closed | Completion date: October 16, 2015 | Permit id: 2015-251874-000 | |||||
New plumbing fixtures for modernization total of 279fixtures Date: December 21, 2015Permit type: Intake | Permit status: Closed | Completion date: December 21, 2015 | Permit id: 2015-279815-000 | |||||
Sprinkler - add new sprinkler system to existing building b1 Date: April 20, 2016Permit type: Intake | Permit status: Approved | Completion date: March 3, 2016 | Permit id: 2016-130027-000 | |||||
Alarm-install new fire alarm system, project will be complete in two phases. Permit type: Intake | Permit status: Approved | Completion date: March 17, 2016 | Permit id: 2016-136678-000 | |||||
Alarm-install new fire alarm system, project will be complete in two phases. Permit type: Intake | Permit status: Closed | Completion date: March 17, 2016 | Permit id: 2016-136678-000 | |||||
4-20-16, kfs- loud noise coming from builiding construction at rhs Permit type: Request | Permit status: Closed | Completion date: April 22, 2016 | Permit id: 2016-158838-000 | |||||
10-11-13 complaint received. Pa system operating at high volume. Permit type: Request | Permit status: Closed | Completion date: October 22, 2013 | Permit id: 2013-219955-000 | |||||
10-11-13 complaint received. Pa system operating at high volume. Permit type: Request | Permit status: Closed | Completion date: March 23, 2016 | Permit id: 2013-219955-000 | |||||
Pbot pw permitroosevelt high school Date: February 26, 2016Permit type: Intake pw | Permit status: Assigned | Completion date: December 16, 2014 | Permit id: 2014-245232-000 | |||||
Roosevelt high school modernization. Includes the remainder of phased work (phases 1, 2 & 3). Date: December 16, 2015Permit type: Application | Permit status: Approved | Completion date: June 23, 2015 | Permit id: 2015-132039-000 | |||||
Dfs- fire proofing Date: February 5, 2016Permit type: Application | Permit status: Approved | Completion date: January 29, 2016 | Permit id: 2015-132039-Dfs | |||||
Dfs for translucent roof assembly Date: March 18, 2016Permit type: Application | Permit status: Approved | Completion date: February 5, 2016 | Permit id: 2015-132039-Dfs | |||||
Dfs for cold formed metal framing Permit type: Application | Permit status: Approved | Completion date: February 22, 2016 | Permit id: 2015-132039-Dfs | |||||
Dfs for cold formed metal framing Permit type: Issuance/intake | Permit status: Intake | Completion date: February 22, 2016 | Permit id: 2015-132039-Dfs | |||||
Dfs for cold formed metal framing Permit type: Process management | Permit status: Closed | Completion date: March 8, 2016 | Permit id: 2015-132039-Dfs | |||||
Dfs for cold formed metal framing Permit type: Life safety | Permit status: Not reqd | Completion date: February 26, 2016 | Permit id: 2015-132039-Dfs | |||||
Dfs for cold formed metal framing Permit type: Structural | Permit status: Approved | Completion date: March 5, 2016 | Permit id: 2015-132039-Dfs | |||||
Dfs for cold formed metal framing Permit type: Structural | Permit status: Required | Completion date: March 5, 2016 | Permit id: 2015-132039-Dfs | |||||
Dfs for cold formed metal framing Permit type: Special inspections review | Permit status: Approved | Completion date: March 5, 2016 | Permit id: 2015-132039-Dfs | |||||
Dfs for cold formed metal framing Permit type: Issuance | Permit status: Approved | Completion date: March 8, 2016 | Permit id: 2015-132039-Dfs | |||||
Rev 01 to fnd permit - revise column footing, revise column location, add column dimensions, revise floor infill to concrete slab over geofoam, revise footing elevations for coordination with underground utilities, delete two columns and founations on grid b4 between bc and bd at ground level, Date: September 14, 2015Permit type: Application | Permit status: Approved | Completion date: August 27, 2015 | Permit id: 2015-132039-Rev | |||||
Inclusion of shear walls in bldg b1 for lateral reinforcing related to footings already reviewed and approved. Date: September 30, 2015Permit type: Application | Permit status: Approved | Completion date: September 18, 2015 | Permit id: 2015-132039-Rev | |||||
Rev 03- bleacher seat count revision Date: February 12, 2016Permit type: Application | Permit status: Approved | Completion date: February 3, 2016 | Permit id: 2015-132039-Rev | |||||
Rev 01 - coordination of mechanical fire smoke dampers with fire rated wall and shaft locations Date: February 12, 2016Permit type: Intake | Permit status: Closed | Completion date: February 3, 2016 | Permit id: 2015-133282-Rev | |||||
Sprinkler - installation of fire sprinkler system in new portable classroom building Date: July 7, 2015Permit type: Intake | Permit status: Approved | Completion date: May 29, 2015 | Permit id: 2015-177583-000 | |||||
Underground-new underground 4 water service line to backflow preventer and 6 line to new portable building. Date: July 14, 2015Permit type: Intake | Permit status: Approved | Completion date: June 22, 2015 | Permit id: 2015-189694-000 | |||||
Hvac for hs modernization and addition Date: December 16, 2015Permit type: Intake | Permit status: Closed | Completion date: June 23, 2015 | Permit id: 2015-191014-000 | |||||
Electrical for the remodel of high school / refund request routed to mnickolds 11/19/2015 / Date: July 30, 2015Permit type: Intake | Permit status: Closed | Completion date: June 25, 2015 | Permit id: 2015-192202-000 | |||||
Demo existing auto shop building Date: December 16, 2015Permit type: Application | Permit status: Approved | Completion date: June 29, 2015 | Permit id: 2015-193725-000 | |||||
Demolition of existing cafeteria building Date: December 16, 2015Permit type: Application | Permit status: Approved | Completion date: June 29, 2015 | Permit id: 2015-193736-000 | |||||
Demolition of existing library building Date: December 16, 2015Permit type: Application | Permit status: Approved | Completion date: June 29, 2015 | Permit id: 2015-193744-000 | |||||
Lv circuit for fire alarm - blazer bldg Date: July 15, 2015Permit type: Electrical inspections | Permit status: Approved | Completion date: September 11, 2015 | Permit id: 2015-201773-000 | |||||
Alarm-install fire alrm for portable building Date: July 28, 2015Permit type: Intake | Permit status: Approved | Completion date: July 16, 2015 | Permit id: 2015-202536-000 | |||||
Alarm-install fire alarm for new portable building Date: July 28, 2015Permit type: Intake | Permit status: Approved | Completion date: July 16, 2015 | Permit id: 2015-202652-000 | |||||
Add 4 circuits for section c and 3 feeders for generator see comments 10 16 15 Date: October 16, 2015Permit type: Intake | Permit status: Closed | Completion date: October 16, 2015 | Permit id: 2015-251874-000 | |||||
Alarm-install new fire alarm system, project will be complete in two phases. Permit type: Intake | Permit status: Approved | Completion date: March 17, 2016 | Permit id: 2016-136678-000 | |||||
Alarm-install new fire alarm system, project will be complete in two phases. Permit type: Intake | Permit status: Closed | Completion date: March 17, 2016 | Permit id: 2016-136678-000 | |||||
4-20-16, kfs- loud noise coming from builiding construction at rhs Permit type: Request | Permit status: Closed | Completion date: April 22, 2016 | Permit id: 2016-158838-000 | |||||
10-11-13 complaint received. Pa system operating at high volume. Permit type: Request | Permit status: Closed | Completion date: October 22, 2013 | Permit id: 2013-219955-000 | |||||
10-11-13 complaint received. Pa system operating at high volume. Permit type: Request | Permit status: Closed | Completion date: March 23, 2016 | Permit id: 2013-219955-000 | |||||
15,0 cfm heated mua, gas piping, plans w co Date: April 30, 2015Permit type: Intake | Permit status: Closed | Completion date: February 25, 2015 | Permit id: 2015-122895-000 | |||||
Dfs for cold formed metal framing Permit type: Application | Permit status: Approved | Completion date: February 22, 2016 | Permit id: 2015-132039-Dfs | |||||
Dfs for cold formed metal framing Permit type: Issuance/intake | Permit status: Intake | Completion date: February 22, 2016 | Permit id: 2015-132039-Dfs | |||||
Dfs for cold formed metal framing Permit type: Process management | Permit status: Closed | Completion date: March 8, 2016 | Permit id: 2015-132039-Dfs | |||||
Dfs for cold formed metal framing Permit type: Life safety | Permit status: Not reqd | Completion date: February 26, 2016 | Permit id: 2015-132039-Dfs | |||||
Dfs for cold formed metal framing Permit type: Structural | Permit status: Approved | Completion date: March 5, 2016 | Permit id: 2015-132039-Dfs | |||||
Dfs for cold formed metal framing Permit type: Structural | Permit status: Required | Completion date: March 5, 2016 | Permit id: 2015-132039-Dfs | |||||
Dfs for cold formed metal framing Permit type: Special inspections review | Permit status: Approved | Completion date: March 5, 2016 | Permit id: 2015-132039-Dfs | |||||
Dfs for cold formed metal framing Permit type: Issuance | Permit status: Approved | Completion date: March 8, 2016 | Permit id: 2015-132039-Dfs | |||||
Demolition of northern end of existing library classroom building (removal of band choir room). Section to be demolished is attached to main building. Date: June 19, 2015Permit type: Application | Permit status: Approved | Completion date: March 20, 2015 | Permit id: 2015-133238-000 | |||||
800a 120 208v 3 phase 4 wire temp construction power service located south of the existing boiler building approx. 2 west of n. Ida@n. Sky Date: June 17, 2015Permit type: Intake | Permit status: Closed | Completion date: June 3, 2015 | Permit id: 2015-179774-000 | |||||
Electrical for the remodel of high school refund request routed to mnickolds 11 19 2015 Date: July 30, 2015Permit type: Intake | Permit status: Closed | Completion date: June 25, 2015 | Permit id: 2015-192202-000 | |||||
Roof replacement- see comments Date: June 19, 2000Client: North Portland Neighborhood Services | Permit type: Alteration | Permit status: Issued | Current use: Educational | Permit id: 2000-143047-000 | |||||
Ada upgrades to one restroom in tech center and two ramps. Date: June 28, 2001Client: North Portland Neighborhood Services | Permit type: Alteration | Permit status: Final | Completion date: November 13, 2001 | Current use: Educational | Permit id: 2001-135993-000 | |||||
New lighting for athletic field Date: August 12, 2004Client: North Portland Neighborhood Services | Permit type: New construction | Permit status: Under inspection | Current use: Utility | Permit id: 2004-020674-000 | |||||
Change of occupancy from e1 to e3 create a child care facility within (e) h. S. Occupant load less than 50. Date: October 4, 2004Client: North Portland Neighborhood Services | Permit type: Alteration | Permit status: Final | Completion date: December 1, 2004 | Current use: Educational | Permit id: 2004-044365-000 | |||||
Add 3 panel antennas on cupola of building and add radio cabinet in attic Date: June 20, 2006Client: North Portland Neighborhood Services | Permit type: Alteration | Permit status: Final | Completion date: February 16, 2007 | Current use: Utility | Permit id: 2006-107821-000 | |||||
Renovate existing outdoor play area, located btwn main bldg and cafeteria and auditorium. For use by children enrolled in adjacent early headstart classrooms (ages 0-2. 5yrs). Install 6 cyclone fence w gate Date: July 31, 2008Client: North Portland Neighborhood Services | Permit type: Alteration | Permit status: Issued | Current use: Educational | Permit id: 2008-148743-000 | |||||
Replace field with artificial turf and add underdrain perforted pipe; replace track, long jump, steeple chase pit, pole vault pad, access drive, add accessibilty upgrades to shot put area, and replace field perimeter curb and perforated pipe Date: August 5, 2010Client: North Portland Neighborhood Services | Permit type: Alteration | Permit status: Final | Completion date: October 28, 2010 | Current use: Educational | Permit id: 2010-146317-000 | |||||
Install 2 new bleachers 14 sf each, ramp & stairs note: permit timeline goal is to permit by oct 12, w 4 wk construction, for use on homecoming nov 6th. Date: October 7, 2009Client: North Portland Neighborhood Services | Permit type: New construction | Permit status: Final | Completion date: March 12, 2010 | Current use: Educational | Permit id: 2009-159324-000 | |||||
Installation of new 5-6" x 22 press box. 2 stories: storage below and viewing area above. Unheated. Date: October 7, 2010Client: North Portland Neighborhood Services | Permit type: New construction | Permit status: Final | Completion date: October 20, 2011 | Current use: Educational | Permit id: 2010-146290-000 | |||||
Replace three existing antennas located within the cupola on top of the high school and add associated electronic devices Date: June 6, 2013Client: North Portland Neighborhood Services | Permit type: Alteration | Permit status: Final | Completion date: July 22, 2013 | Current use: Utility | Permit id: 2012-201495-000 | |||||
Solar installation - 66. 2kw dc rooftop solar system Date: September 12, 2016Client: North Portland Neighborhood Services | Permit type: Alteration | Permit status: Under inspection | Current use: Assembly | Permit id: 2016-204054-000 | |||||
Solar installation - 68. 58kw dc rooftop solar Date: September 12, 2016Client: North Portland Neighborhood Services | Permit type: Alteration | Permit status: Under inspection | Current use: Educational | Permit id: 2016-204085-000 | |||||
Temporary unmanned radio frequency transmissions facility consisting of the temporary addition of 3 panel antennas, 1 microwave w odu unit, (3)tmas, and accessory equipment mounted on a cell on wheels with a guyed tower located within a temporary fenced compound. Date: July 13, 2016Client: North Portland Neighborhood Services | Permit type: Addition | Permit status: Final | Completion date: August 10, 2016 | Current use: Utility | Permit id: 2016-179869-000 | |||||
Demo bleachers, remove all debris and footings, return to natural state Date: July 17, 2008Permit type: Demolition | Permit status: Final | Completion date: September 30, 2008 | Current use: Educational | Permit id: 2008-146728-000 |