ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Cut out and remove all damaged / unkeyed flashing along parapet wall. Cut out all blister at roof. Use # cap sheet over roof (24 x 81) 544 sqft Date: April 26, 1999Permit type: Gc | Permit id: E006428 | |||||
Cut out and remove all damaged unkeyed flashing along parapet wall. Cut out all blister at roof. Use # cap sheet over roof (24 x 81) 544 sqft Date: April 26, 1999Permit type: Gc | Permit id: E006428 | |||||
As per mini rc #9y00012, perform total lead analysis of 2 dust wipe sample(s) via environmental protection agency (epa) sw845-3050-74 method utiliz Date: August 20, 1999Permit type: Delead | Permit id: E010545 | |||||
Make all necessary repairs to # 2 oil boiler to restore to good working condition. Restore heat to building. Note: contractor must call lydia san Date: January 26, 2001Permit type: Heat | Permit id: E114886 | |||||
Apt#2r replace with new the broken glass upper pane in the 6th room front bedroom work related debris note: contractor must contact h. P. D. @ ( Date: April 19, 2010Permit type: Gc | Permit id: Ea32745 | |||||
Provide single fuel drop. 5 gallons, #2 fuel. Fill tank. Prime and start boiler. Boiler must be up and running upon completion of drop or esb fu Date: February 7, 2003Permit type: Util | Permit id: E315325 | |||||
Apartment #3l: remove all bathroom fixtures including bathtub, toilet and vanity. Demolish bathroom floor approximately 24 square feet. Supply and Date: October 24, 2003Permit type: Gc | Permit id: E406803 | |||||
Apartment #3l: remove all air bubbles on roof. Supply and install lb. Roof paper over entire roof approximately 21 square feet. Flash the inte Date: April 18, 2003Permit type: Gc | Permit id: E320231 | |||||
As per secondary rc #2002001188305 (emsl), perform total lead analysis of 04 dust wipe sample(s) via environmental protection agency (epa) sw845-3050 Date: April 9, 2003Permit type: Delead | Permit id: E320155 | |||||
As per the attached scope of work, scrub mildewed surfaces with a solution of one cup of chlorine bleach to one gallon of water. A detergent such as t Date: June 20, 2003Permit type: Gc | Permit id: E322969 | |||||
As per scope of work, scrub mildewed surfaces with a solution of one cup of chlorine bleach to one gallon of water. A detergent such as tri-sodium pho Date: November 24, 2003Permit type: Gc | Permit id: E408952 | |||||
Apartment# 1l & 2l: disconnect and remove defective bathtub. And shower body apatment 2-l. Disconnect and remove leaky tank and bowl. Install new s Date: May 24, 1999Permit type: Gc | Permit id: E006987 | |||||
Local law #1 violation : as per rc #20050021129 (abax bk-w,si) and attached scope of work thoroughly remove all lead violations as per new york city Date: April 6, 2005Permit type: Delead | Permit id: E527145 | |||||
Apt 2l: as per the requirement contract with hpd, provide and install 2 window guards throughout entire apartment. Remove all work related debris Date: October 24, 2013Permit type: Gc | Permit id: Ee08600 | |||||
As per hpds lead abatement requirement contracts and attached scope of work thoroughly remove all lead violations as per new york city administrative Date: November 14, 2012Permit type: Delead | Permit id: Ed10040 | |||||
Perform total lead analysis of 13 dust wipe sample(s) via environmental protection agency (epa) sw8453050-74 method utilizing flame atomic absorptio Date: November 29, 2012Permit type: Delead | Permit id: Ed11036 | |||||
Apt 2l: as per the requirements contract with hpd, provide and install 4 window guards and repair 4 throughout entire apartment. Remove all work Date: November 15, 2012Permit type: Gc | Permit id: Ed09858 | |||||
Apt#: 2l . At foyer , lower window sash . Replace with new the broken / defective window balances . Also at room north 5 . Aka (living rm) replace Date: January 4, 2013Permit type: Gc | Permit id: Ed12498 | |||||
Make all necessary repairs to #2 oil boiler to restore to good working condition. Restore heat to building. Note:contractor must contact lydia s Date: November 20, 2000Permit type: Heat | Permit id: E109602 | |||||
Locate water leak and repair. Restore ceiling to original condition approx. Sqft. Remove all job related debris. Note: contractor must cal Date: December 13, 2000Permit type: Plumb | Permit id: E104274 | |||||
R/c 20141419802 apt 2l: as per the requirement contract with hpd, provide and install / repair window guards throughout apartment. Remove all wo Permit type: Gc | Permit id: Eh04288 | |||||
R/c 20141419802 apt 2l: as per the requirement contract with hpd, provide and install / repair window guards throughout apartment. Remove all wo Date: October 13, 2016Permit type: Gc | Permit id: Eh04288 | |||||
As per hpds lead abatement requirement contracts and attached scope of work thoroughly remove all lead violations as per new york city administrative Date: October 7, 2016Permit type: Delead | Permit id: Eh04620 | |||||
Perform total lead analysis of 13 dust wipe sample(s) via environmental protection agency (epa) sw8463050b-7000b method utilizing flame atomic absorpt Date: November 10, 2016Permit type: Delead | Permit id: Eh06254 | |||||
R c 20141419802 apt 2l: as per the requirement contract with hpd, provide and install repair window guards throughout apartment. Remove all wo Date: October 13, 2016Permit type: Gc | Permit id: Eh04288 | |||||
Apt#: 2l . At foyer , lower window sash . Replace with new the broken defective window balances . Also at room north 5 . Aka (living rm) replace Date: January 4, 2013Permit type: Gc | Permit id: Ed12498 | |||||
Supply and install new toilet tank and bowl complete. Note: contractor must contact hpd at 718 636-3027 or 718 636 3056 with start date. Contactor m Date: October 30, 2003Permit type: Plumb | Permit id: E407208 | |||||
Repair all shorts in apartment #1r and restore electric to outlets and light fixture. Date: October 27, 2003Permit type: Elec | Permit id: E407317 | |||||
Remove existing heating plant and install new boiler. Install new cast iron/ steel #2 oil boiler to supply adequate heat and hot water to building. Date: September 8, 2003Permit type: Heat | Permit id: E404270 | |||||
As per rc #2006001254202 (enviro-probe, inc.), perform total lead analysis of 17 dust wipe sample(s) via environmental protection agency (epa) sw845 Date: November 1, 2005Permit type: Delead | Permit id: E612735 | |||||
Provide single fuel drop 5 gallons #2 fuel fill/tank prime & start boiler, boiler must be up and running upon completion of drop or esb notified imm Date: January 26, 2001Permit type: Util | Permit id: E114934 | |||||
Provide single fuel drop 5 gallons #2 fuel fill tank prime & start boiler, boiler must be up and running upon completion of drop or esb notified imm Date: January 26, 2001Permit type: Util | Permit id: E114934 | |||||
Remove existing heating plant and install new boiler. Install new cast iron steel #2 oil boiler to supply adequate heat and hot water to building. Date: September 8, 2003Permit type: Heat | Permit id: E404270 | |||||
Provide (1) fuel delv,due to no fuel to fire system 275 tank delv,2 gls,p/s boiler. Date: December 28, 1998Permit type: Util | Permit id: E003126 | |||||
Cellar properly repair the defective breeching at chimney wall #2 oil resore boiler to give heat note: contractor must sign and return with bids. Date: January 25, 2006Permit type: Heat | Permit id: E621825 | |||||
Cut out all air bubbles. Supply and install 90lbs. Roofing paper throughout roof approx. 30 sq. Ft.. Flash all interior parapet walls and bulk head Date: September 11, 2000Permit type: Gc | Permit id: E103829 | |||||
Install cap start on bulkhead roof & flash around skylight 76 sqft. Demo ceiling on bulkhead 3rd sty p/h. Sheetrock / tape & compound bulkhead ceili Date: October 23, 1998Permit type: Gc | Permit id: E001232 | |||||
Public hallway: replace with new the damaged tread at first story #2 down from second floor. Note: contractor must contact hpd @ (718) 636-3021, 6 Date: April 19, 2004Permit type: Gc | Permit id: E421367 | |||||
Replace missing tread 2nd down 3rd to 2nd story rear fire escape. Note:contractor must call lydia santos at (718) 254-89 with start date. Co Date: October 22, 2001Permit type: Gc | Permit id: E206579 | |||||
Please replace missing damper at boiler breeching. Remove all work related debris. Contractor must contact lydia santos at 718 254-89 or sharon Date: April 17, 2001Permit type: Heat | Permit id: E120315 | |||||
Apt 2r...... Extremely hot water causing potential scalding condition / damage. At the time of this invitation to bid, it is not anticipated that th Date: October 26, 2015Permit type: Plumb | Permit id: Eg06346 | |||||
Apt 2l: provide and install 2 window guards throughout entire apartment. Date: November 25, 2013Permit type: Gc | Permit id: Ee10775 | |||||
Apt. #1r) at basement reset aquastat to 120 Date: January 3, 2006 Value: $67Permit type: Plumb | Permit id: E619708 | |||||
Apartment #3l: through-out: replace 6 missing radiator air valves. Date: December 1, 2003Permit type: Plumb | Permit id: E409858 | |||||
Apartment #3r bdrm, kit, livrm: provide and install (1) new steam valve on radiators. Note: contractor must contact hpd at 718 636-3023 with start Date: February 15, 2003Permit type: Plumb | Permit id: E315936 | |||||
Boiler room: provide tin ceiling at boiler room ceiling, sq. Ft.. Date: April 6, 2001 Value: $228Permit type: Misc | Permit id: E120274 | |||||
Trace, locate and repair leaks above. Ask shop for supplies. Date: September 7, 2000Permit type: Plumb | Permit id: E104590 | |||||
In apt # 2-l and 3-l : apt 2l demo and sheetrock wall approx 6 sqft. Demo celing approx 8 sqft. Grout bathroom tub area apt # 3-l . Sheetrock ceiling Date: March 7, 2000Permit type: Gc | Permit id: E018200 | |||||
In apt # 2-l kitchen: replace 1 radiator shut off valve. Bedroom 1: replace 1 radiator shut off valve. Livingroom: replace 1 radiator shut off valve. Date: March 7, 2000Permit type: Plumb | Permit id: E018195 | |||||
Apt #2l repair leak in bthrm ceiling. Waste line Date: November 10, 1999Permit type: Plumb | Permit id: E013345 | |||||
Abate the following area: 1. Hallway w 4 laminate 176 sq. Ft. Date: June 23, 1999 Value: $670Permit type: Delead | Permit id: E008731 | |||||
Apt # 2l bathroom: trace and repair leak. Post: apt # 2-l bathroom: water still leaking from bath of apt above. Locate, leak on water line to t Date: March 19, 1999Permit type: Plumb | Permit id: E005827 | |||||
Apt # 2r bathroom: trace and repair leak at ceilling. (tub and toilet) Date: February 10, 1999Permit type: Plumb | Permit id: E004614 | |||||
Apt # 2r kitchen: trace and repair all leaks. Bathroom: repair leak by toilet (nipple union) Date: February 10, 1999Permit type: Plumb | Permit id: E004612 | |||||
Apt # 1r bathroom: cover tub with plastic. At shower wall remove loose tile. Tile approx 8 sqft. Wall tile. Grout wall and around tub/ silicone. Bag Date: February 10, 1999 Value: $489Permit type: Gc | Permit id: E004611 | |||||
Apt # 2r bathroom: cover floor with drop cloth. Demo approx. 12 sqft ceiling. Sheet rock ceiling 12 sqft. Plaster,tape and compound. Bag and remov Date: February 10, 1999Permit type: Gc | Permit id: E004609 | |||||
Apt #1r hall remove mildew wall4 sqft. And ceiling sqft. Paint with stain killer. Date: January 26, 1999 Value: $519Permit type: Gc | Permit id: E004079 | |||||
P/h paint ceiling sqft. Paint 2 walls. Paint w/stain killer. Date: January 4, 1999 Value: $290Permit type: Gc | Permit id: E003289 | |||||
Bdrm#1 patch floor under radiator sqft. Disconnect radiator and reinstall radiator complete. Date: January 4, 1999 Value: $252Permit type: Plumb | Permit id: E003288 | |||||
Apt.#3l front room: cover floor with drop cloth. Demo approx. 12 sq. Ft. Ceiling. Sheet rock ceiling 12 sq. Ft. Plaster, tape and compound. Bag & r Date: November 11, 1998Permit type: Gc | Permit id: E001863 | |||||
Replace 1 broken wood tread for up 2 story. Date: November 9, 1998 Value: $158Permit type: Gc | Permit id: E001807 | |||||
P h paint ceiling sqft. Paint 2 walls. Paint w stain killer. Date: January 4, 1999 Value: $290Permit type: Gc | Permit id: E003289 | |||||
Apt # 1r bathroom: cover tub with plastic. At shower wall remove loose tile. Tile approx 8 sqft. Wall tile. Grout wall and around tub silicone. Bag Date: February 10, 1999 Value: $489Permit type: Gc | Permit id: E004611 | |||||
Apt 2r...... Extremely hot water causing potential scalding condition damage. At the time of this invitation to bid, it is not anticipated that th Date: October 26, 2015Permit type: Plumb | Permit id: Eg06346 | |||||
Install cap start on bulkhead roof & flash around skylight 76 sqft. Demo ceiling on bulkhead 3rd sty p h. Sheetrock tape & compound bulkhead ceili Date: October 23, 1998Permit type: Gc | Permit id: E001232 | |||||
Provide (1) fuel delv,due to no fuel to fire system 275 tank delv,2 gls,p s boiler. Date: December 28, 1998Permit type: Util | Permit id: E003126 | |||||
At 693 halsey st 3rd floor hall rubbish removal: remove the accumulation of refuse and or rubbish at 3rd floor hall (free standing radiator and Date: May 18, 2017Permit type: Gc | Permit id: Eh17340 | |||||
Trouble shoot and restore boiler equipment to proper working oder. #2 fuel restore heat to entire building. Boiler is in operating but producin Permit type: Heat | Permit id: E112882 | |||||
Clean two 275 gallons oil tanks, install new oil suction, replace hartford loop and vaccum boiler clean. Note: contractor must contact lydia santos Date: January 19, 2001Permit type: Heat | Permit id: E113908 | |||||
Provide single fuel drop 5 gallons #2 fuel fill/tank prime & start boiler, boiler must be up and running upon completion of drop or esb fuel unit no Date: April 2, 2001Permit type: Util | Permit id: E119813 | |||||
Apt. 3r / front room. Reglaze lower sash at front room. Remove all work related debris. Contractor must sign and return bid. Note; contra Date: November 18, 2011Permit type: Gc | Permit id: Ec12536 | |||||
Trouble shoot and restore boiler equipment to proper working oder. #2 fuel restore heat to entire building. Boiler is in operating but producin Permit type: Heat | Permit id: E112882 | |||||
Trouble shoot and restore boiler equipment to proper working oder. #2 fuel restore heat to entire building. Boiler is in operating but producin Permit type: Heat | Permit id: E112882 | |||||
Apt. 3r front room. Reglaze lower sash at front room. Remove all work related debris. Contractor must sign and return bid. Note; contra Date: November 18, 2011Permit type: Gc | Permit id: Ec12536 | |||||
Provide single fuel drop 5 gallons #2 fuel fill tank prime & start boiler, boiler must be up and running upon completion of drop or esb fuel unit no Date: April 2, 2001Permit type: Util | Permit id: E119813 | |||||
Trouble shoot and restore boiler equipment to proper working oder. #2 fuel restore heat to entire building. Boiler is in operating but producin Permit type: Heat | Permit id: E112882 | |||||
Trouble shoot and restore boiler equipment to proper working oder. #2 fuel restore heat to entire building. Boiler is in operating but producin Permit type: Heat | Permit id: E112882 | |||||
R/c 20141419802 apt 1l: as per the requirement contract with hpd, provide and install 3 window guards and repair 2 throughout apartment. Remove 1 w Date: November 15, 2016Permit type: Gc | Permit id: Eh05850 | |||||
R c 20141419802 apt 1l: as per the requirement contract with hpd, provide and install 3 window guards and repair 2 throughout apartment. Remove 1 w Date: November 15, 2016Permit type: Gc | Permit id: Eh05850 |